Construction Management (Department of Engineering)

User Generated

xnqnsvovafhygna

Engineering

Description

Write 2000 words Only without References and Content Tables

Introdution and Conclusion a must

USe Harvard Style Ref and Citations
I have Atahced the Image and Assignmet Down for further Information

Review the Pearl Muscat Brochure at the link provided and answer the questions that follow: http://www.pearloman.com/pearl-muscat/

Q1. Explain the complete lifecycle of this project in detail.[1]

Q2. Select the most suitable procurement route for this project.[1]

Q3. Select the most appropriate payment mechanism for this project.[1]

Q4. Draw a Work Breakdown Structure for this project.[2]

Q5. Draw a Network Diagram for this project (including floats).[3]

Q6. Draw a Gantt chart for this project (using proposed dates).[2]

Rules:

  • Carry out background research for all stakeholders while answering the questions.
  • All answers require justification and explanation.
  • No interviews or site visits are allowed. All necessary information is available from relevant sources.
  • Each submission can be by one student or a group of 2 – 5 students (maximum).
  • The minimum amount of content required for this assignment is 2,000 words.
  • Q1, Q2 and Q3 must have at least two (2) references each.
  • Referencing the course handouts, blogs or Wikipedia is not allowed.
  • Only a soft-copy is required in the prescribed format along with this cover page.
  • Any submission in another format shall be treated as a non-submission.
  • Late submissions will have deduction of 0.25 marks for every working hour of the college.
  • All assignments shall be checked for plagiarism.
  • The highest marks will be awarded to assignments that show the most amount varied research.

Unformatted Attachment Preview

Higher College of Technology Department of Engineering Construction Management (CEQS3230) Academic Year 2018 – 2019 Semester 1 Assignment Submission Format: Microsoft Word Document submitted at e-Learning Link Last Date for Submission: 23:59 Monday, 10 December 2018 Total Number of Marks is 10. Name:__________________________________ Student ID:_____________ Name:__________________________________ Student ID:_____________ Name:__________________________________ Student ID:_____________ Name:__________________________________ Student ID:_____________ Name:__________________________________ Student ID:_____________ Review the Pearl Muscat Brochure at the link provided and answer the questions that follow: http://www.pearloman.com/pearl-muscat/ Q1. Explain the complete lifecycle of this project in detail. [1] Q2. Select the most suitable procurement route for this project. [1] Q3. Select the most appropriate payment mechanism for this project. [1] Q4. Draw a Work Breakdown Structure for this project. [2] Q5. Draw a Network Diagram for this project (including floats). [3] Q6. Draw a Gantt chart for this project (using proposed dates). [2] Rules: 1) Carry out background research for all stakeholders while answering the questions. 2) All answers require justification and explanation. 3) No interviews or site visits are allowed. All necessary information is available from relevant sources. 4) Each submission can be by one student or a group of 2 – 5 students (maximum). 5) The minimum amount of content required for this assignment is 2,000 words. 6) Q1, Q2 and Q3 must have at least two (2) references each. 7) Referencing the course handouts, blogs or Wikipedia is not allowed. 8) Only a soft-copy is required in the prescribed format along with this cover page. 9) Any submission in another format shall be treated as a non-submission. 10) Late submissions will have deduction of 0.25 marks for every working hour of the college. 11) All assignments shall be checked for plagiarism. 12) The highest marks will be awarded to assignments that show the most amount varied research. 4) A result, such as an can be used to determine whether a trend exists or a new process will be to be able Market Demands or Perceived Needs La bowl 2 2.3. Project Lifecycle > all the stages from the beggeuing at Seycie because when one project finish anothe Project 1 befor you go to next stage must baile the result from birst to see, understand whal erses Definition of Project be able to see & seep don't go What is included in the it is possible to Project result not. Just i det don't go to the detuck I begning genert icleat need Objectives and Scope Hea Conceptual Planning and Feasibility Study do this project of Conceptual Plan or Preliminary Design Design and Engineering complete design Construction Plans and Specifications all the Procurement and Construction To obtain et different ways to get the projet Completion of Construction > buildin Startup for Occupancy commissoning is construction & anajer project end nere. Acceptance of Facility client Operation and Maintenance important force client. Fulfillment of Useful Life Disposal of Facility remove somente that valube. as Client the project and hese Figure 1.1: Lifecycle of a typical project (PMI 200-
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Please let me know if there is anything needs to be changed or added. I will be also appreciated that you can let me know if there is any problem or you have not received the work. Please let me know if there is anything needs to be changed or added. I will be also appreciated that you can let me know if there is any problem or you have not received the work Good luck in your study and if you need any further help in your assignments, please let me know Can you please confirm if you have received the work? Once again, thanks for allowing me to help you R MESSAGE TO STUDYPOOL NO OUTLINE IS NEEDED

Gantt chart For pearl Muscat
Oct 01,2018
ID

Task

Start

Finish

Progress
1

Initiation Meeting
Goal and scope
Budgetary constraints
Schedule constraints
Documentation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

2018-09-01
2018-09-01
2018-09-09
2018-09-15
2018-09-15

Planning and Design
2018-09-27
Architectural Programming 2018-09-27
Schematic Plans
2018-09-27
Contracts Management
2018-10-15
Working Drawings
2018-10-15
Architectural Plans
2018-10-15
Structural Plans
2018-10-16
Mechanical Plans
2018-10-17
Electrical Plans
2018-10-18
Finish of Planning
2018-10-26
Bidding
2018-10-29
Obtains the Copy
2018-10-29
Reviews the Contract
2018-11-06
Solicits and Evaluates Bids
2018-11-14
Setting Project Starting Date 2018-11-22
Construction
2018-11-27
Building Permits
2018-11-27
Scheduling of Subcontractors 2018-12-12
Excavate the Land
2018-12-12
Do Rough Framing
2018-12-27
Do Rough Electrical
2019-01-15
Undertake Flooring
2019-01-30
Undertake Roofing
2019-02-14
Finish of Rough Construction 2019-03-01
Install Heating and Air Conditioning
2019-03-04
Install Elevators
2019-03-19
Frame Windows and Doors 2019-04-03
Furnish the facilities
2019-04-18
Install Network Facilities
2019-04-26
Final inspections
2019-04-27
Payments of Construction
2019-05-03
Completion
2019-05-13

2018-09-22
2018-09-22
2018-09-22
2018-09-22
2018-09-22

100%
100%
100%
100%
100%

10/15/2018
10/12/2018
2018-10-15
2018-10-29
2018-10-23
2018-10-23
2018-10-24
2018-10-25
2018-10-26
2018-10-29
2018-11-26
2018-11-05
2018-11-13
2018-11-21
2018-11-26
2019-05-02
2018-12-11
2019-05-02
2018-12-26
2019-01-14
2019-01-29
2019-02-13
2019-02-28
2019-03-01
2019-03-18
2019-04-02
2019-04-17
2019-04-25
2019-05-02
2019-05-03
2019-05-09
2019-05-13

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

8

Oct 01,2018
15 22 29

Nov 01,2018
5 12 19 26

Dec 01,2018
3 10 17 24 31

Jan 01,2019
7 14 21 28

Feb 01,2019
4 11 18 25

Mar 01,2019
4 11

Mar 01,2019
18 25

Apr 01,2019
1

8 15 22 29

May 01,2019
6 13


Running Head: CONSTRUCTION PROJECT

Construction Project
Name
Course
Instructor
Date

1

2

CONSTRUCTION PROJECT
Contents
Introduction .......................................................................................................................................3
Project management lifecycle ..............................................................................................................4
Project initiation stage.........................................................................................................................4
Feasibility study .................................................................................................................................4
Business case document......................................................................................................................4
Project planning .................................................................................................................................5
Execution ...........................................................................................................................................6
Project monitoring phase.....................................................................................................................7
Project closure....................................................................................................................................7
Project procurement Route ..................................................................................................................8
Payment mechanism ................................................


Anonymous
This is great! Exactly what I wanted.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags