I upload example and info file you need to do it as the example

Write 3 Routing Sheets for each subject :

1-Flywheel.

2-Cylinder

not:
Cylinder
1 - cut a piece of aluminium 1.25 h and 2.50width.
2 - Install the piece of aluminum in the CNC machine.
3 - We haver a program to design the piece of aluminum.
4- The program Name 000035 .
5- I started with 3 OD GROOVE.
6- End with Face.
7- Flip the aluminum piece and we have another program to cut the extra part of it.
8-The program Name 000036.
9-We have Face to cut the extra .25 width because it is only 2.25 width what we need.
10- We take the piece of aluminium to another CNC machine to make the hole.
11- We already have a program to drill Cylinder hole.
12- The program Name 000037.
13- We start the program by making center drill by T3434 drill Bit.
14- Then machine will make sound to change the drill bit to .5 drill bit.
15- Use the T3535 bit to peck the hole.
16- We end by clean the hole from the feed.
To improve the work in future we need to train more on how to use CNC machine and how to design program.

3-

not:

Drive Shaft

1 - cut a piece of Alnimim 2 length and 1.38 width.

2 - Install the piece of aluminum in the CNC machine.

3 - We design a program to design the piece of aluminum.

4- The program Name 000033 .

5- I started with 2 OD Chamfer, 2 OD Turn, and Face the end.

6- Before saving the program we write G2B and M3O un the end.

7- Flip the aluminum piece and design another program to cut the extra part of it.

8-The program Name 000034.

9-I started with OD Chamfer,and Face the end.

In the end, To improve the work in future we need to train more on how to use CNC machine and how to design program

Unformatted Attachment Preview

Tutor Answer

MikeCK
School: New York University

Have a look at these files & kindly hit me up if you need edits! 😊

Cylinder Routing Sheet.
Product Name

Product begins
(Tentative)

Product ends
(Tentative)

Date of preparing the
route sheet

Cylinder

12-12-2018

13-12-2018

01-10-2018

Raw Materials:
Aluminum Rod Ø25mm x 55mm Long

Symbols used in the manufacturing process:
O = Operation
I = Inspection
T = Transportation
S = Storage
D = Delays
Operation
Number.

Symbols.

Task
description.

OITSD

Time Taken.

Machinery
Required.

(Exact
running time
of t...

flag Report DMCA
Review

Anonymous
Excellent job

Similar Questions
Hot Questions
Related Tags
Study Guides

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors