need perfect work ....

Computer Science
Tutor: None Selected Time limit: 1 Day

9- Graphically, the Marginal Cost curve cuts through theAverage Total

Cost curve at:

A. The lowest point on the MC curve.
B. The highest point on the MC curve.  
C. The lowest point on the ATC curve.
D. The middle of the upward-sloping portion of the total costcurve.
Jul 26th, 2015

Thank you for the opportunity to help you with your question!

D. The middle of the upward-sloping portion of the total costcurve.

Please let me know if you need any clarification. I'm always happy to answer your questions.
Jul 26th, 2015

Are you studying on the go? Check out our FREE app and post questions on the fly!
Download on the
App Store
...
Jul 26th, 2015
...
Jul 26th, 2015
Dec 10th, 2016
check_circle
Mark as Final Answer
check_circle
Unmark as Final Answer
check_circle
Final Answer

Secure Information

Content will be erased after question is completed.

check_circle
Final Answer