Memo construction system engineering: The Mount Hope Project Costing

User Generated

6ezon

Engineering

System Engineering

Description

Please find the attached file. read the instructions and you will find the question on the last page (page 6)

keep the total memo length to under one page, if possible.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Itemized costs
land
site
utilities
electrical
Shopping facility
Parking lot
Landscaping
Various fees
For the site, the costs will be:
(1080000*1.69)/0.83=2,199,037
For the utilities, the costs will be:
(321,000*1.69)/0.83=653,603
For the electricals, the costs will be:
(68000*1.69)/0.83=139,458
For the shopping, the costs will be:
(3928000*1.69)/0.83=5,509,806
For the par...


Anonymous
Great content here. Definitely a returning customer.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags