Photoshop RequestPhotoshop RequestPhotoshop Request

User Generated

Hmv727

Humanities

Description

I have to Photoshop the 14 to a 16 and the 11 to a 16. Try to do it the best you can.

Unformatted Attachment Preview

OC 00 (B4/20)] - number of units short) cost to have one unit backordered for one year in dollars per year (Q-B) /2Q = average inventory B2/2Q = average backorder level ety stock (SS) and reorder point (ROP) SS = (Z* sqrtL) * od ROP = DDLT + SS = DDLT + (Z*sqrtL) * od MOLT = expected demand during lead time -nressed as some multiple of forecast interval viations from the mean demand * - forecast interval Name Cir Circle the letter corresponding to the correct answer. ULAIR Chapter 5. Supply chain focused inventory management Dawood а. c 1. The production-processing technology is divided into two categories. The standardized products through an assembly line, while are used to produce non-standardized products through a job shop. Piece flow systems/reorder point systems b. mass production systems/reorder point systems piece flow systems/periodic systems d. intermittent systems/continuous systems c. 2 points each. 14 2. Which of the following statements regarding inventory are incorrect? (1). Other than the cost, holding inventory is good for operations. (2). Inventories account for a substantial portion of a typical industrial firm's assets (3). WIP inventory is an acronym for work in process inventories. (4). Safety stock is held to maintain a certain level of service regardless of uncertainty ) and (4) and (4) (3) produce ventory systems, which system has the least relation to the fr is placed whenever the inventory levels fall below res antity order point system m em 'cts is VV level me Circle the letter corresponding to the correct answer. UZAIR Dawood Chapter 2. Forecasting demand 1. Select the cases that are the least suited for the use of quantitative forecasting. (1). Demand of radically innovative new product (2). Supply of agricultural products (3). Demand of commodities (4). The rate of new product production a. (1) b. (1) and (2) C (2) and (4) 1 point each. Il d (4) 2. For a forecast to be usable, it needs to pass criteria which include aspects such as Fill in the blanks a. Simplicity / Completeness Accuracy / Simplicity Comprehensiveness / Accuracy Flexibility /Accuracy ccording to the forecasting framework, what is next step once the forecast interval is established? Collect and analyze data Determine the forecast purpose elect a forecasting technique alize the forecast the forecasting framework suggest human judom her Mathematical Model is generated storical data is gathered historical data is. lection and
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Hey dude! here it is. let me kn...


Anonymous
Goes above and beyond expectations!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags