CIS498 installing Ultra-Modern Computer System at Step Inc Project Plan Assignment

User Generated

Purrmvgfn85

Computer Science

CIS498

Description

This assignment consists of two (2) sections: a business requirements document and a Gantt chart or project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured so that infrastructure and information systems can be designed properly. Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.

Section 1: Business Requirements Document

1. Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. Note: The template can be found in the Student Center of the online course shell.

a. Describe the project including the following:

i. Describe the scope and analyze how to control the scope.

ii. Identify possible risks, constraints, and assumptions.

iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.

iv. Define relevant terms that will be used throughout project.

b. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

  • This course requires use of Strayer Writing Standards (SWS). The format is different than other Strayer University courses. Please take a moment to review the SWS documentation for details.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.


Section 2: Revised Gantt Chart / Project Plan

Use Microsoft Project or an open source alternative, such as Open Project, to:

2. Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.


User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Project Deliverable 2
I.

Section 1: Business Requirements Document

II.

Section 2: Revised Gantt Chart / Project Plan


BUSINESS REQUIREMENTS

Reference number:

Document Control

1

Change Record
Date

Author

Version

Reviewers
Name

2

Position

Change Reference

Table of Contents
Document Control .......................................................................................................................................... 1
1

3

Business Requirements ........................................................................................................................... 4
1.1

Project Overview ............................................................................................................................ 4

1.2

Background including current process ........................................................................................... 4

1.3

Scope .............................................................................................................................................. 5

1.3.1

Scope of Project ...................................................................................................................... 5

1.3.2

Constraints and Assumptions ................................................................................................. 7

1.3.3

Risks ....................................................................................................................................... 8

1.3.4

Scope Control ......................................................................................................................... 8

1.3.5

Relationship to Other Systems/Projects .................................................................................. 9

1.3.6

Definition of Terms (if applicable) ......................................................................................... 9

1
1.1

Business Requirements
Project Overview
The increasing utilization of the internet internationally to facilitate...


Anonymous
I was having a hard time with this subject, and this was a great help.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags