Homework Assignment 3

Due in Week 3 and worth 30 points

The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates.

Table: Basic Data Review for Construction Project Equipment Arrangement 			Cycle Time (hours)	 Step 	Description 	Actual 	Potential 	Difference 1	Read basic data package	4	4	— 2	Write, type, proof, sign, copy, and distribute cover letter	21.9	0.5	21.4 3	Queue	40	0	40 4	Lead engineer calls key people to schedule meeting	4	0.25	3.75 5	Write, type, proof, sign, copy, and distribute confirmation letter	25.4	2.1	23.3 6	Hold meeting; develop path forward and concerns	4	4	— 7	Project leader and specialist develop missing information	12	12	— 8	Determine plant preferred vendors	12	12	— 9	Review notes from meeting	12	12	— 10	Resolve open issues	106	104	2 11	Write, type, proof, sign, copy, and distribute basic data acceptance letter	26.5	0.25	26.25 	Totals	267.8	151.1	116.7


Use the data in the table above and answer the following questions in the space provided below:

  1. What are the sources of value-added and non-value-added work in this process?
  2. Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use?
  3. Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it?
  4. What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one?

Unformatted Attachment Preview

MAT 510 – Homework Assignment Homework Assignment 3 Due in Week 3 and worth 30 points The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates. Table: Basic Data Review for Construction Project Equipment Arrangement Cycle Time (hours) Step Description Actual Potential Difference 1 Read basic data package 4 4 — 2 Write, type, proof, sign, copy, and distribute cover letter 21.9 0.5 21.4 3 Queue 40 0 40 4 Lead engineer calls key people to schedule meeting 4 0.25 3.75 5 Write, type, proof, sign, copy, and distribute confirmation letter 25.4 2.1 23.3 6 Hold meeting; develop path forward and concerns 4 4 — 7 Project leader and specialist develop missing information 12 12 — 8 Determine plant preferred vendors 12 12 — 9 Review notes from meeting 12 12 — 10 Resolve open issues 106 104 2 11 Write, type, proof, sign, copy, and distribute basic data acceptance letter 26.5 0.25 26.25 Totals 267.8 151.1 116.7 Use the data in the table above and answer the following questions in the space provided below: 1. What are the sources of value-added and non-value-added work in this process? 2. Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use? 3. Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it? 4. What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one? Type your answers below and submit this file in Week 3 of the online course shell: MAT 510 – Homework Assignment
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

MAT 510 – Homework Assignment
Homework Assignment 3
Due in Week 3 and worth 30 points
The following data consists of the actual time used and potential (the best time possible for this review
process) to complete each step in the review process. The actual times are based on the review of 30
projects. The potential times are subjective engineering judgment estimates.
Table: Basic Data Review for Construction Project Equipment Arrangement
Cycle Time
(hours)
Step

Description

Actual

Potential

Difference

1

Read basic data package

4

4



2

Write, type, proof, sign, copy, and distribute
cover letter

21.9

0.5

21.4

3

Queue

40

0

40

4

Lead engineer calls key people to schedule
meeting

4

0.25

3.75

5

Write, type, proof, sign, copy, and distribute
confirmation letter

25.4

2.1

23.3

6

Hold meeting; develop path forward and
concerns

4

4



7

Project leader and specialist develop missing
information

12

12



8

Determine plant preferred vendors

12

12



9

Review notes from meeting

12

12



10

Resolve open issues

106

104

2

11

Write, type, proof, sign, copy, and distribute
basic data acceptance letter

26.5

0.25

26.25

Totals

267.8

151.1

116.7

Use the data in the table above and answer the following questions in the space provided below:
1. What are the sources of value-added and non-value-added work in this process?
2. Where are the main opportunities to improve the cycle time of this process, with respect to