CNE383 Arizona State University Construction Estimating Paper

User Generated

Nyvnn12354

Engineering

CNE383

Arizona State University

Description

I want someone to help me with my assignment , i will attach all the instructions .

thank you

Unformatted Attachment Preview

CON/CNE 383 CONSTRUCTION ESTIMATING FALL 2019 Finishes Instructions 1. Assume any required values if not stated in the problem statement. 2. Use 12 point Times New Roman Font with Single Spacing. 3. Submit your assignment through Canvas 4. Late submissions will be accepted till the end of the semester for a 75% grade deduction. 5. No handwritten solutions will be accepted. 6. File naming format: Last Name, First Name – Finishes 7. The assignment is valued at 20 possible points. 8. Show all calculations and formulas, state all assumptions. 9. Failure to follow instructions will result in deductions Question Takeoff the finishes from the Yuma, AZ Marine Corps Air Station Fuel Farm. Use either On Screen Takeoff or Bluebeam. This includes: • All gypsum board (can be taken-off as an assembly) • All metal stud walls (can be taken-off as an assembly) • Suspended Acoustical Ceiling • All wall paint Use the provided sheets from R.S. Means to complete the costs. For the takeoff, be sure to include the following 1. R.S. Means 12 Digit Cost Code 2. Description 3. Quantity 4. Unit 5. Unit Costs (Material, Labor, Equipment) 6. Total Costs (Material, Labor, Equipment) 7. Total Estimate Dr. Kenneth Sullivan Page 1 of 2 CON/CNE 383 CONSTRUCTION ESTIMATING FALL 2019 8. All assumptions (you will not always be able to find an exact cost match for every item in your cost database). SUBMISSION REQUIREMENTS You are required to submit an Excel file (excel workbook format) which contains the following items: 1. Quantities and associated total prices (include any calculations as well) 2. Screenshot(s) of your plan takeoffs from On-Screen or Bluebeam Dr. Kenneth Sullivan Page 2 of 2
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Hi, here is your assignment :)

Unit Costs
Cost Code
081313.1200
081313.1400
081313.1380
081313.1380
081416.2080
081313.0425
081433.1360
081416.2020
081416.2120
081313.0680
081313.0640
081313.0010
081313.0100
081313.0010
081213.0010

Description of Doors Quantity
3' x 7' 2" - Type C
3
4' x 6' 10" - Typ...


Anonymous
Awesome! Made my life easier.

Studypool
4.7
Indeed
4.5
Sitejabber
4.4

Related Tags