BUSA 428:
PROJECT MANAGEMENT
Fall 2018 Project guideline
Name:
CWID:
Identification of Problems/Tasks:
-
Understand the problems presented
Provide appropriate information with associated objective evidence
Analysis:
-
Evaluate and provide relevant impact of the problems presented
Provide responses using information from quantitative measures as derived from
software tool results
Solutions and Recommendations:
-
Provide solution to task/problems presented along with any associated action
plans
PROJECT INSTRUCTIONS
Use the project response Word document posted on D2L and begin to respond to all questions.
Be sure and address each question/request in detail providing emphasis on project objectives.
All graphs/charts/tables are to be produced in the native format (excel, project, etc.) and
then copied into the response area of the Word document.
Post BOTH the Word document with all responses/graphs/charts/tables AND the objective
evidence (the native documents from where you copied the charts/graphs/tables)
Project Start Date: September 4, 2018
Final Project Due Date: December 7, 2018
GRADING CRITERIA
Cover all points in the response. Use the Word document posted as the template for all
responses and task work. The Word document will be the formal response back to Astin
Martin Graphics. All tables, graphics, and figures created by other tools should be
copied and pasted in the Word document maintaining a professional appearance with
appropriate labeling of all figures, diagrams, tables, artifacts pasted. As this is a
professional document, do not leave template examples in your submission.
Where applicable, provide clear documentation, graphics, diagrams, and tables that
help clarify any responses.
1
STATEMENT OF WORK SUMMARY
RFP awarded for specific web services which will be incorporated into a web graphics
company (Astin Martin Graphics LLC). Topical level requirements for the software were
provided. Deliverable products include:
-
Systems Engineering to provide appropriate requirements decomposition
Software Engineering to provide design/development/unit test of software
System Test Engineering to provide component and enterprise level testing
Quality Engineering to provide quality control through the entire development life
cycle
Management functions to include all primary functions (project management,
finance, planning & scheduling, Overhead support (contracts, engineering matrix,
etc.)
Award date of May 15 and required completion date (deliverables provided) of
November 15.
Astin Martin Graphics request of planned deliverables, acceptance criteria, quality plan,
and work breakdown structure. These items need to be provided in an acceptable time
for Astin Martin to review and approve.
Astin Martin Graphics further requests other deliverables to include final software
(source and binary) which meets all approved acceptance criteria, associated design
documents (system and development level)
All project questions or request for project scope changes should be directed to the
Astin Martin Graphic designee (course instructor).
There is no requirement relative to project tools used to generate the required data.
Topical requirements include:
-
-
-
System Engineering: UML design appropriate graphic widgets to display
aeronautical expanse gauges within the technical specs guidelines for twenty-five
different visual aspects. Include appropriate level of peer review. Design should
include grap...