Agile Method vs. Engineering based method

Computer Science
Tutor: None Selected Time limit: 0 Hours

I was wondering how much it would cost to answer this question... When should you use an agile method, and when should you use an engineering-based method for developing a system? Support you answer.

Aug 26th, 2014

Enginering-based methods are well detailed and require lots of documentation. These would be used in projects that are tedious and require you to have every detail documented appropriately.

An agile method lessens this workload, which also saves more time, and this should be used for projects that do not require a lot of paperwork, if at all.

For example, engineering based is used in constructing a space probe for NASA where you need to consider the calculations of forces and materials used.

A fruit vendor  project would not need as many calculations because you can assume most fruits,their costs, packing materials tote boxes etc.

Ref:

https://in.answers.yahoo.com/question/index?qid=20130225080534AAb2CL6


Aug 26th, 2014

Are you studying on the go? Check out our FREE app and post questions on the fly!
Download on the
App Store
...
Aug 26th, 2014
...
Aug 26th, 2014
Dec 6th, 2016
check_circle
Mark as Final Answer
check_circle
Unmark as Final Answer
check_circle
Final Answer

Secure Information

Content will be erased after question is completed.

check_circle
Final Answer