CE 5344 University of Texas Construction Methods and Field Operations Project

User Generated

ynvgu_fnznen

Engineering

CE 5344

University of Texas at Dallas

CE

Description

* No plagiarism at all.

* I have uploaded the project descriptions.

I need professional work please.

Also, I need a powerpoint for the presentation

Unformatted Attachment Preview

Instructor: Dr. Kaushal Summer 2020 The University of Texas at Arlington Department of Civil Engineering CE/CM 5344 – Construction Methods – Field Operations CE 4332 – Construction Equipment, Methods & Management INSTRUCTIONS: All students are expected to contribute to the completion of this project. All work should be your own and references should be documented to validate your results. Full credit will be given for an extra neat report and for creativity in presenting your work. OBJECTIVES This is a group project with up to three (3) students per group. The objectives of this group project are to familiarize you with an actual construction project. All members of a group need to participate equally. This project also gives you an opportunity to recap the information you gained from class. Each group needs to work independently (the results are different and are based on methods you select and assumptions you make). You can use the textbook, lectures, CAT Performance Handbook, RSMeans Cost Data (you can find the book in NH library – can be borrowed for couple of hours), and equipment manufacturers’ websites, as well as industry sources to obtain missing information. Your report should include rationale and justifications as to the construction methodology selected by your team. Also, you must include all calculations, in a neat methodical outline demonstrating the iteration cycles performed by your team to optimize the equipment combination selected for use on the project. You may include supporting materials in the Appendix. Consider safety, sustainability, environmental and social factors. List any assumptions and their justifications. The main body of report should not exceed 12 Pages (1.5 spacing, 12 size Times New Roman with one in. margins), not considering cover page, tech memo and appendices. KICKOFF MEETING (The group leader should submit Minutes of the Kickoff Meeting on Canvas by Sunday, July 12, 11:59 PM CST). Before working on the project, you need to have a “kickoff or planning meeting” with your team members. During this kickoff meeting, the following items must be discussed and a report be prepared for submission during the first day of work: • • • • • • • • • Date and time of kickoff meeting Members present Selection of a group leader Group member responsibilities Sources of information Assumptions Presentation of results Any questions/issues Meeting times to work on the project as a team SUBMISSION INSTRUCTIONS The leader of each group will submit report and presentation on Canvas. Use Group No., Group Leader’s last name and CE 5344 or CM 5344 or CE 4332 on the name of your files that you will upload; such as: Group x - LastName - CE 5344. There will be no changes allowed for your project report and your presentation after they are submitted. Late submissions will not be accepted. • • For report, submit both Word and PDF formats. For presentation, submit both Power Point and PDF formats. Include name of each presenter at the lower right corner of each slide. Include slide number on each slide. CE/CM 5344 – CE 4332 – General Guidelines for the Term Project – Summer 2020 Page 1 of 2 • • Final Project Report (80 Points) and Power Point Presentation (20 Points) -- Due Date: Sunday, August 2nd, 2020 (11:59 PM CST) After 11:59 PM CST on Sunday, Aug 2nd, 2020, links on Canvas will not allow you to submit! PROJECT INFORMATION A metro or subway (underground train) station is located near a river. The soil conditions at site are classified as hard clay and limestone material however excavation in this site requires soil support system. Depth of watertable at this location on the average is at 35 ft from the surface. Dewatering is work of another contractor. The station will be constructed with dimensions of 350 ft x 100 ft with three levels. The depth of station from the surface is 15 ft and overall depth of station (for three floors) is 90 ft. You are responsible for the excavation, soil hauling, and backfilling of this project. You project can include one of the following topics: Topic A – Protecting excavation walls by sloping, benching, sheet piling, soldier piles and wood lagging, slurry wall and tie backs or a combination of those methods. Topic B – Removal of soil and stockpiling at the site Topic C – Hauling extra soil to a dump site 10 miles away. Assume 8 miles on paved road (asphalt) and 2 miles on well-maintained dirt road. The paved road has +2% slope towards the dump site. The dirt road has a -5% towards the dump site. The dump site is relatively flat. NOTE: It is strongly recommended that you show your methodology and sequence of operation by using graphs. GRADING Part A: Report [80 points] • • • • • • • • • Kickoff meeting report, due on Sunday, July 12, 11:59 PM CST [5 Points]. Tech Memo to provide a summary of objectives, methodology, results and recommendations [10 Points]. Your Approach (Methodology) [10 Points]. Significance of Your Approach or Methodology [10 Points]. Summary of Calculations with Charts and Graphs [10 Points]. Results [10 Points]. Lessons Learned [10 Points]. Sustainability and Environmental Considerations [5 Points]. Hand Calculations in the Appendix [10 Points]. Part B: Virtual Presentation (via MS-Teams) [20 points] Power Point Presentation Outline (more information will be provided in class): • • • • • • Your Approach (Methodology). Significance of Your Approach or Methodology. Summary of Calculations with Charts and Graphs. Results. Lessons Learned. Sustainability and Environmental Considerations. CE/CM 5344 – CE 4332 – General Guidelines for the Term Project – Summer 2020 Page 2 of 2 The University of Texas at Arlington College of Engineering Department of Civil Engineering CE/CM 5344/CE 4332 – Construction Methods: Field Operations Summer 2020 Term Project Student(s) Name: Topic: Task Class Students Points Kickoff Report 5 Objectives, Methodology, Results Technical Specifications 10 10 Sample Cycle Time Calculations 15 Charts and Tables 10 Production Comparison 15 Lessons Learned 5 Sustainability, Social, and Environmental 5 Presentation 25 Total 100 Grade Comments
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

here is the project and the presentation

Kadikoy subway Construction Project
Kick-off meeting

Meeting:

Steering Committee Kick-off Meeting

Date:

Friday, July, 10, 2020, 9:00 am to 12:00 pm

Location:

Main Boardroom, Istanbul City Municipality

Chairperson: Moss Gosh, General Manager
Secretary:

Edith James

In Attendees: Teddy Kim, HR manager
Ate Josh, Director, Operations
Betty Walker, Director, Communications
Hermann, Special Planning Advisor
David Luke, Finance Manager
Amos Don, Director of Corporate Services
Boi Cornelius

1. Mosh Gosh, the general Manager welcomes members of the steering committee and
briefly introduced what the project is and its purpose. He said that the congestion in the
city resulted in the city municipality come up with a plan to improve traffic by way of a
subway. He then introduced the secretary, who explained the agenda of the meeting and
what was expected of the steering committee in the project. She explained the committee
had various responsibilities including reviewing and providing feedback regarding the
project component methodology, providing partaker recommendations for distinct

components, as well as communicating the purpose, approach, and outcomes of the study
to other officials, and interested parties in board members communities.
2. David Luke proposed hat a chairperson be elected to chair the committee. Edith James
led the steering committee in selecting its leader. By a show of hands, the committee
voted Mosh Gosh as their leader. Mosh Assumed the responsibility of the chairperson
immediately. Edith James was also elected to deputize the chairperson.
3. Regarding Project status meetings members were wondering how often the steering
committee would be meeting. The chairperson briefly described the suggested project
schedule. This included the project steering committee meeting dates when the steering
committee would meet to review the project progress, resolve challenges that could arise,
and plan for forthcoming work. These meetings will be held as each month begins to
create monthly status reports. The chairperson also advised that the advisory committee
will be meeting from time to time between June 2021 and November 2022.
4. Regarding the Project Management Plan, the chairperson explained that the project
management plan would be the project management team and task leads’ source of
reference. He explained that the PMP will be comprised of reference material including
project schedule by each work activity, approved budgets by activity, approved work
statement, staffing plan, contract information, invoicing guidelines, document templates,
and approval processes.
5. A member wanted to know when the monthly report will be ready and what it will
contain. The chairperson explained that the monthly report, as well as the invoice, will
record project progress against achieved progress. Each status report will cover the entire
moth from the first to the last day. It will include an executive summary, completed task
description, progress narrative against budgeted hours, project task schedule, (each task
completion percentage), and dollar amount of requested payment.
6. The chairman explained that the Technical advisory committee would be established. He
said that the group team was going to work jointly with the metro and the municipality to
establish the core technical advisory committee. The committee includes municipality
and metro decision-makers who will work in hand with other public agencies. The TAC
committee will be made of people capable of provided sound advice regarding the
project's part in influencing the wider public realm.

7. Committee members wanted to know if approval from the public had been
received. Edith James answered that an agreement had already been reached and the local
government was willing to compensate anyone who was to ensure any damages. The
chairperson said that further consultations with the municipality and relevant authorities
would be done to clearly understand this would be done. Betty Walker and David Luke
were tasked with making follow-ups with the relevant authorities and table a report
before the committee during the next meeting.
The chairperson said that the next meeting would be held during the last week of May 2021. The
explained that the meeting would be longer as it would be the final meeting before the project
kicks off. Members that wanted to take a tour to the site were asked to give their names the
secretary, Edith James.

Tech Memo
In efforts to create efficiency in transportation in Istanbul, the Metropolitan Municipality of
Istanbul decided that a railway transportation system will be constructed in Kadikoy next to
Bosphorus River. The transportation division of the metropolitan municipality tendered the
construction of the subway to the I&M group after present the most suitable proposal. I&M
group projects that the project will take two and a half years or 30 months to be completed. The
subway station will be measuring 350ft in length and 100ft in width. It will go down 90ft from
the surface and will be divided into three levels.
Excavation will be done using the Tunnel Boring machine, which is a hydraulic machine most
suitable for ground conditions. The machine will excavate on its own using special equipment. It
will also push itself forward independently. Wagons will be used to remove the excavated
material from the tunnel. As such, a temporary rail line will put in place to facilitate the
movement of the wagons. The TBM machine will do the completion of cement solution
materials as well as apply cement segments to the montage area. The presence of a water layer
will not be a problem because the TBM machine has a protective shield in the form of a steel
tube that keeps water out.
The subway station is one of several other unde...


Anonymous
Just what I was looking for! Super helpful.