Project management, writing homework help

User Generated

Ora95

Writing

Description

I just found out that my 15 month old son has to have emergency surgery and I don't want to fall behind on the project so I am asking for help.  Here is the project overview for the entire project.  I did the memo part and attached it below.  The assignment information is listed after the review.  There are two templates mentions which I also attached.  I attached the whole project because I am afraid that I might need help with the rest of it as well so this way whoever helps me with the first part I might come back to you for more help depending how my sons recovery goes.  Thank you so much in advance for this.  I can't afford to fall behind right now I am taking three classes right now and I just don't think I can keep up with this part of the one class.

Project Overview

Below is the scenario for the course project assignment. You are assuming the role of the project manager for a company (you select the name) to provide a new product (Backpack with built in refrigerated pouch and radio module) to a customer ( U.S. Army, Ground Forces and Special Operations). Each week you will be presented additional information on the project and will be required to produce a weekly deliverable in support of the project.

The course project is designed to address the course objective as well as incorporate each of the weekly modules objectives. You will be required to submit a final paper on the project addressing all of the objectives described in the project summary.

Scenario

Your company was recently awarded a delivery contract on a new product (see below). You were newly hired by the company; you will assume the role as the assigned program manager overseeing the design, development, production and delivery of the new product. The details below provide a summary to the course project:

  • Company type (name your company): A small defense contractor located in the United States of America
  • Company size (employees): 100
  • Product: Backpack with built in refrigerated pouch and radio module
  • Awarded quantity: 200 units (100 assigned to Ground Forces / 100 assigned to Special Operations)
  • Program Budget: Proposed award: $1,500,000
  • Customer: U.S. Army, Ground Forces and Special Operations
  • Award date: September 1, 2015
  • Completion date: March 1, 2017
  • Delivery schedule: 100 units 12mths ARO (after receipt of order). 50 units every 3 months after first delivery
  • Milestone Schedule:
    • First delivery: September 1, 2016
    • Second delivery: December 1, 2016
    • Last delivery: March 1, 2017
    • First milestone payment (from customer): October 30, 2015
    • Second Milestone payment: January 30, 2017
    • Final Milestone payment: May 30, 2017
    • Initial Program review (at the customer's site): November 16, 2015
    • Subsequent Program reviews: 6 months after the initial review

Expected Result from Senior Management:

  • On-time delivery for the three stated product deliverables
  • Desire to complete the total program under the stated budget of $1,500,000
  • All milestones accomplished by due dates listed
  • Supplemental (follow-on) contract for future additional units (backpacks)

Due Date

Your final project is due in Module 06. There will be individual assignments along the way. The module they are due is noted in the time line below.

Time Line

Module

Assignment

01

Memo to Executive Staff

02

Identify Overall Scope and Analyze Unexpected Events

03

Statement of Work (SOW) and Work Breakdown Structure (WBS)

04

Quantify, Qualify, and Evaluate Project Risks

05

Finalize Project Schedule and Mitigate Any Delays

06

Prepare a Final Project Report


Requirements

The final report due in Module 06 will be 8-10 pages in length. Included in the final project report will be the following:

  1. Executive summary
  2. Project background / project overview
  3. Major Activities / Milestones
  4. Project Closure synopsis
  5. Project metrics Performance
  6. Project Management Issues
  7. Project Closure Recommendations

ASSIGNMENT

Project Scope Document

This assignment has two parts. In the FIRST part of this assignment, you will use the Project Scope Document template (linked below). In the SECOND part of this assignment, you will use Tab 2 of the Project Schedule Template (also linked below). Tab 2 will provide you with the unexpected events information needed to complete your analysis.

Part I

Develop the project scope document (no more than 3 pages long) to include the following information:

  • Project Description
  • Project Assumptions
  • Project goals
  • Project constraints (if any)
  • Project limitations
  • Project milestones
  • Project risks (initial assessment)

Please use the template linked below to develop your project scope document.

Project Scope Document Template

The Project Scope needs to be developed prior to any analysis of unexpected events.

Analysis of Unexpected Events

Part 2

In a separate Word document, provide an analysis of unexpected events using the Project Schedule Template below (the unexpected events are located in Tab 2 of the document). In your analysis, you should discuss four areas affected by these unexpected events. Three of the areas of the project affected by the events should include changes to budget, human capital, and impact to schedule. Identify one additional area affected by these events.

Project Schedule Template

Please submit your assignments in one zip file.


User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Running head: GENERAL MOTORS RESEARCH: PART TWO

General Motors Research: Part Two
Terry Banks
Team A
QNT/275
7/28/2016

1

2

GENERAL MOTORS RESEARCH: PART TWO
INTRODUCTION

We designed a research meant to help General Motors increase its car sales. We put
forward the hypothesis that car buyers prefer vehicles with low fuel consumption. We
collected sample data for ten different vehicles. We limited our variables to Average
MPG and total sales in 2016. In this section, we will analyze the data collected using
different statistical methods from descriptive statistics to time series analysis to
present and analyze the problem.
DESCRIPTIVE STATISTICS
We performed descriptive statistics analysis on the data we had previously presented,
shown in the table below
Vehicle
Ford F-Series
Chevrolet Silverado
Toyota Camry
Honda Civic
Toyota Corolla
Nissan Altima
Honda Accord
Toyota RAV4
Honda CR-V
Ford Fusion

AVERAGE MPG (2016)
17.5
17.1
37.1
35.2
32.6
29.3
28.6
30.6
26.4
24.6

2016 SALES
256,895
178,955
130,283
122,634
116,371
113,816
108,599
106,274
100,101
96,424

Figure 1: Sample data

i) Mean
We found out the mean of the MPG of the ten vehicles used in the sample. The
sample comprised of the ten vehicles with the highest sales within the U.S in 2016.
The sample MPG mean is 27.9. Since from the hypothesis we expect that vehicles
with low MPG have larger sales, a mean of the top ten vehicles will summarize the
hypothesis.
ii) Minimum and Maximum
From the sample data, the vehicle with the minimum MPG is the Chevrolet Silverado
and th...


Anonymous
Awesome! Made my life easier.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags