assessing and controlling risk, Engineering homework help

User Generated

Qnana

Engineering

Description

This week's discussion topic is designed to allow you to better understand risks and methods of controlling risks. And you will need  to responses to at least two of your classmates' , I will provide this when it's posted .

Please respond to the following prompt: 

  • Imagine you are the software project manager for a complex web interface project that must be developed on newly acquired hardware.  Changing policies affect the direction your project can take.  Your fellow project managers in both the hardware and policy sections do not agree with the processes you are following, but you are taking a strong stand that the company has policies and you are following them.  What are the risks and how would you go about mitigating a disastrous result?
I have attached the materials that you will need to get this assingmnet done .Please be clear and use the sources that provided. 

Unformatted Attachment Preview

Background about Risk Risk Engineering, which consists of assessing and controlling risks, is a key component to successful project management. Gambling establishments from the 17th and 18th century were the first known body to investigate risk. Various games were assessed to determine payback and discrete events were studied. Evaluating what playing card would be next or would the next ball be black and white introduced probability theory. Insurance companies began using probability theory in the 19th century for continuous events, for example, insurance risk exposure was investigated to determine the probability of death at various ages. From the 1950s through the 1970s decision theory took off, which is the study of identifying values, uncertainties, and related issues to understand a given decision and its justification. In the 1980s software projects began to include risk techniques to reduce errors and produce successful project. In the 1990s, the Software Engineering Institute (SEI) introduced "Team Risk Management" and increased emphasis on risk management. We will talk more about the SEI in Module 11. Definition of Risk Risk is defined as an event, action, or thing with: 1. A potential loss associated with it, 2. An uncertainty or chance involved, or 3. Some choice involved. Robert Charette introduced this definition in 1987. Risk is the lack of resources such as information, control, or time to accomplish a task. Losses may be in the form of reduced quality of the delivered product, increased cost, delayed completion, or failure. The classic Operations Research definition of risk focuses only on the probability of occurrence, not on the consequences or loss. Risks deal with uncertainties and unknowns insofar as they lead to failure or produce adverse outcomes. Robert N. Charette, Sr. Consultant with Agile Project Management Practice and director of the Risk Management Intelligence Network introduced the Evolutionary Hierarchy of Risk. He proposed that there are levels of risk. The lowest level is Crisis Management, where the team is fighting the "project fires." At this level, risks are addressed only after they become problems. On the Capability Maturity Model Integrated® (CMMI®) scale, this would be at level 0. Fix-on-Failure is the next level; when a risk is detected, the team reacts quickly. Again this takes place only after the risk has occurred. The third level is Mitigation where the team plans ahead of time to provide resources to cover risks as they occur, but the team does not take the next step to prevent them. In Prevention, the team implements and executes a plan as part of the software project to identify risks and prevent them from becoming a problem. The next level is Eliminate Root Causes where the team identifies and eliminates factors that make it possible for the risks to occur. This and the next step is where the Japanese car industry focused when their cars became popular in the 1990s. Anticipation suggests that you expect that you will have risks and you used techniques such as inspections to prevent and eliminate the risks. Lastly Management of Change, CMMI® Level 4 and 5 activities, is where the team manages change. Risk Engineering and Current Software Programs Most Requests for Proposal (RFPs) require offerors to identify risks and provide risk mitigation strategies and the Statement of Work (SOW) probably requires risk management. Contract Deliverable Resource Lists (CDRLs) may include a Data Item Description (DID) for a Risk Assess Report. The commercial and Government standards such as ISO 12207 requires a section on risk. The risk management process must be defined for the project. One or more people assigned to the program must have funded responsibility for risk management. An example from Earth Observing Satellite Data Information System Core System (ECS) SOW has paragraph 3.2.4 which specifies requirements for risk assessment. For example DID 210/SE3 is the Risk Assessment Report. Paraphrased it reads: Design Analysis, Work Breakdown Structure (WBS) 2.4: The contractor shall conduct performance analyses and risk assessments of the design to evaluate the optimization, correlation, completeness, and risk associated with the design, and to ensure that the implemented system will meet all the requirements of the specification. SE means the System Engineering Office responsible for production of the DID. SE3 means the document is reviewed and controlled by the contractor, that is, the document must be delivered to the customer for information only yet subject to approval. The document is due one month prior to each Incremental Design Review (IDR) and there will be five IDRs. This report: • • • Identifies possible high risk areas in the design, manufacture, integration, and test areas, Assesses the risks identified in terms of technical objectives, goals, schedule, and budget; and Identifies appropriate plans to mitigate risks and provides costs for alternate or backup approaches. Two Phases of Risk: Assessment and Control Risk Assessment Identification The purpose of Risk Identification is to identify and categorize potential problem areas. Identification is initiated during the proposal and continually updated during the project. Risks can be identified through: • • • • • • • • • • • • Visiting the customer operational sites Participating in customer working groups Examining results from Independent Research and Development (IR&D) programs Reviewing historical lessons learned data Analyzing assumptions from estimation Examining cost drivers from the cost estimation model Prototyping Benchmarking hardware Performing special trade studies or analyses Running performance models or simulation Analyzing poorly defined items in the specification and plans Using checklists of generic software problems Barry Boehm and Robert Charette both have checklists of common software risk problems and you will notice that they are not identical. Top 10 Checklist Barry Boehm 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Personnel shortfalls Unrealistic schedules and budgets Developing the wrong software functions Developing the wrong user interface Gold plating (excessive requirements or overdesign) Continuous stream of requirements changes (excessive requirements volatility) Shortfall in externally furnished components Shortfall in externally performed tasks Real-time performance shortfalls Straining computer science capabilities Common Software Risks Robert Charette 1. 2. 3. 4. 5. Inadequate development model Inadequate software development plan Unsuitable organizational structure Too many new methodologies Building a complex project from scratch The Software Engineering Institute (SEI) created a taxonomy approach to identify risks based on these assumptions: • • • • • Software development risks are generally known by the development staff but not always communicated. A structured and repeatable method of risk identification will encourage consistent risk management. Effective risk management must cover all key development and support areas of the project. The risk identification process must create and sustain a non-judgmental, objective environment so that tentative or controversial views are heard. No overall judgment can be made about the success or failure of a project based solely on the number of risks uncovered. The software taxonomy is organized into three major classes: • • Product Engineering covers the technical aspects of the work to be accomplished. Development Environment covers the methods, procedures, and tools used to produce the product. • Program Constraints are the contractual, organizational, and operational factors within which the software is developed, but which are generally outside of the direct control of local management. The classes are organized into 13 elements and 64 attributes. The next item contains a video that provides a brief overview of software taxonomy. Analysis Risk analysis assigns a quantitative value to identified risks. A quantitative value is preferred over low, medium, and high, although this range is often uses. Analysis is conducted to discover the cause, effect, and magnitude of the perceived risk. It is common to analyze risk in terms of the Risk Factor (Rf) which is determined by estimating the Probability of Failure (Pf) and the Consequences of Failure (Cf). Pf is determined by considering the maturity (m), complexity (c), and dependency (d) factors in the equation: Pf = (Pm + Pc + Pd) / 3 where: Probability of Failure Calculation Magnitude Pf Maturity Factor Complexity Factor Pm Pc Dependency Factor Pd Independent of existing system, facility, or associate contractor 0.1 (low) Existing design Simple design 0.5 (medium) Major design change Moderate increase in complexity Performance dependent on existing system performance, facility, associate contractor 0.9 (high) State of art, some research complete Extremely complex Performance dependent on new system schedule, facility, or associate contractor Cf is determined by considering the technical (t), cost (c), and schedule (s) factors in the equation: Cf = (Ct + Cc + Cs) / 3 where: Consequences of Failure Calculation Technical Factor Ct Cost Factor Cc Schedule Factor Cs 0.1 (low) Minimal or no consequences Budget estimates not exceeded, some $ transfer Negligible impact on program, slight schedule change, compensated by available slack 0.5 (medium) Some reduction in technical Cost estimates increased by 5% to 20% Small slip in schedule Magnitude Cf Technical Factor Ct Magnitude Cf Cost Factor Cc Schedule Factor Cs performance 0.9 (high) Technical goals cannot be achieved Cost estimates increased by > 50% Large schedule slip, affects segment milestones or possible affect on system milestones Then the resulting Risk Factor is defined as Rf = Pf + Cf − (Pf * Cf), for example: Pf Cf Rf .7 .7 .7 + .7 − (.7*.7) = .90 .5 .7 .5 + .7 − (.5*.7) = .85 .5 .3 .5 + .3 − (.5*.3) = .65 .4 .2 .4 + .2 − (.4*.2) = .52 Be aware that the Risk Factor is less meaningful when either probability or consequences of failure approach one or zero. For example: the consequences of failure of the fuel gauge in an airplane are technically unacceptable; hence, consequences could be assessed as one. Even if the probability of failure is zero, that is, the Risk Factor is one: Rf = Pf + Cf − (Pf * Cf) = 0 + 1 − (0 * 1) = 1 Other factors should be considered for these situations in regions "A" and "B": The product of the analysis step includes a list of quantified risk items with attributes. Each risk item must be saved and routinely maintained as in the example. Attribute Description Risk item number Program unique identifier Risk item name Name of risk item Attribute Description Description Textual description of risk item Potential impact Description of impact to the program if the risk comes true, in terms of cost, schedule, performance Risk factor Numeric value based on probability and consequences of risk Specific activities to mitigate or Current recover from the risk, including mitigation/contingency status of plans and responsible plans organization Monitoring thresholds Specific values on a scale which defines success or requires additional action Scale Measurement scale relevant to monitoring thresholds for risk item A monitoring threshold which results in a reduction of the risk factor to a low level is the success threshold; while a monitoring threshold which requires additional risk related activity is an action threshold. Prioritization In risk prioritization, the Risk Factor is used to sort the risks where the highest values get highest priority. Each risk factor is evaluated to determine most appropriate risk management plans to prioritize implementation strategies. Consider this sample data: Risk Item Rf Cf Pf 1. Low probability, low consequences 0.19 0.10 0.10 2. Low probability, high consequences 0.73 0.70 0.10 3. High probability, low consequences 0.73 0.10 0.70 4. High probability, high consequences 0.91 0.70 0.70 The plans for Risk Item 2 should focus on reducing the consequences of the risk; the plans for Risk Item 3 should focus on reducing the probability of the risk, and further evaluation should concentrate on the components of the probability or consequences of failure. Risk Control Planning The first step in Risk Control is Risk Planning. Feasible options are identified for managing the risk; examples of risk management options include: Note that some strategies are aimed at avoiding risk including (2) prototyping, (4) scope down requirements, and (6) modelling and simulation, while others are aimed at transferring risk including (3) subcontractor performance and cost incentives, (7) shift function to hardware, and (8) leave function to operator. You need to compare effectiveness and the cost of various options. One method is to apply the Risk Reduction Leverage (RRL), a quality for price ratio, which is defined as: RRL = (Risk Exposure Before − Risk Exposure After) / Risk Reduction Cost For example, assume the loss due to a software interface error is estimated at $100,000 and the probability of error being introduced is estimated at 0.3 or 30%. Then the Risk Exposure Before = $100,000 x (.3) = $30,000. Your research shows that there are three approaches for eliminating the error: • • • An interface (I/F) checking tool that costs $5,000 and reduces the probability to 0.2 or 20%, An I/F testing approach that costs $15,000 and reduces the probability to 0.1 or 10%, or Reusing tried and proven interface software that costs $3,000 and reduces the probability to 0.1 or 10% Using this data, we can solve the equations for the RRL as: RRL = (Risk Exposure Before − Risk Exposure After) / Risk Reduction Cost Option 1: RRL (checker) = [$30K − ($100K x (.2))] / $5K = 2 Option 2: RRL (testing) = [$30K − ($100K x (.1))] / $15K = 1.33 Option 3: RRL (reuse) = [$30K − ($100K x (.1))] / $3K = 6.66 (Best Solution) Now with this quality for price data, specific action plans including the implementation criteria for success and/or action thresholds can be developed for the options. The risk management plans may be contingency plans, in case the failure occurs, or mitigation plans, to proactively reduce the likelihood that the risk will occur, or both. Project management then reviews the risk management plans, refines them, and the appropriate approach is selected. The plans must answer the following questions for each risk item: • • • • • Why? Answering risk item importance and relation to project objectives What? When? Answering risk resolution deliverables, milestones, and activities Who? Where? Answering responsibilities and organization How? Answering the approach How much? Answering budget, schedule, and key personnel Resolution Effective risk resolution often hinges on finding a creative solution to the specific risk. Thus the solution depends on the risk. There are eight (8) generic methods to resolve risks. Avoid the risk Do not do the risky activity: negotiate elimination of the requirement or hire a consultant (specialist) to do the risky work Transfer the risk Buy special purpose hardware rather than develop software or find a COTS solution Buy information about the risk Spend money to investigate the risk: prototype, bring in a consultant to evaluate your design, or establish an IR&D project well ahead of time Eliminate the root cause of the risk Analyze the risk to look for underlying causes using techniques such as Kaizen, Lean, or Six Sigma; and minimize or eliminate root causes Assume the risk If the consequences are small and the cost to avoid the risk is large, simply accept the consequences if the risk occurs Publicize the risk Notify upper management, marketing, and the customers about the risk and consequences: minimize the surprise if it occurs and get buy in for resolutions Control the risk Accept that the risk might occur and develop plans to handle it if it does Remember the risk Build a collection of risk management plans and resolutions for use on future projects Monitoring In Risk Monitoring, the software manager tracks the status of open and potential risk areas. Technical, cost, and schedule performance of each implemented risk plan is qualitatively assessed at internal periodic project management reviews to: • • • Verify outcomes were as envisioned, Identify opportunities for refinement of risk plan, and Provide feedback to those making programmatic decisions Customer personnel are apprised of each risk area at the monthly progress reviews and major technical reviews. Risk monitoring techniques include collecting metrics, reviewing risks, and tracking the top ten risks as in the chart. Top 10 Risk Tracking: Third Week This Last Weeks weekweek on list Risk Item Risk resolution progress 1 1 3 Scoping product to fit required schedule Working session with customer 2 4 3 Resolving subcontractor OS I/F uncertainties New changes proposed by subcontractor 3 2 3 Algorithm boundary checking Prototype on schedule 4 6 2 Workstation availability Delay in delivery reported 5 5 3 User I/F definition User study complete, awaiting prototype 6 3 3 Staffing lead developer for control software Candidate identified, offer extended 7 - 1 Reusable text-formatting software uncertainties Evaluation underway 8 7 3 Application performance risk Benchmark to complete this week This Last Weeks weekweek on list Risk Item Risk resolution progress 9 9 2 CM procedures for incremental development CM procedures identified, SEPG tailoring 10 8 2 Staffing programmer for control software Programmer accepted offer; reports on 08/01 Risk Management Panel Large programs/projects often create a Risk Management Panel (RMP) which should be documented in the appropriate Project Instruction. The purpose of the RMP is to provide accurate current data and multidisciplinary inputs to Program/Project Management to make informed decisions about managing the risks. The panel typically includes the Deputy Program/Project Manager who acts as the RMP chair, the Chief System Engineer, the Quality Assurance Office Manager, the Software Development Manager, the Operations and Maintenance Manager, the Independent Test Office Manager, the Commercial off the Shelf (COTS) Procurement Manager and a Customer Representative. The RMP acts as a reviewing body at each checkpoint of the risk management process: identification, analysis, prioritization, planning, resolution, and monitoring. The outputs of the RMP are approvals and redirections for each checkpoint in the risk management process. Decisions of the RMP are reported to other relevant management forums such as the Project Review, Configuration Control Boards (CCBs), and monthly status meetings. Issues or feedback from these forums may require the RMP to deliberate further. Risk Management Summary In summary, the risk engineering process is defined as: Organizations have a choice. They can take a risk based management approach or they can choose not to invest in reducing risk. There are positives and negatives to both approaches, but the software industry's current stance is the risk based management approach is better and cheaper in the long run. Risk-based Management Orientation "Realistically oriented", risks set up boundary conditions, foresee and contain possible failure, proactive not reactive • Problems • • • Benefits • • Risk analysis may be inaccurate, underestimation can cause major problems, overestimation can lead to excessive mitigation effort Takes resources away from other tasks Effects of risk engineering hard to measure: total avoidance removes proof that cost was justified Better perception of risks & options for management: reduction in project exposure to risk Improved credibility of plans More proactive U.S. software development Example: Think of the car industry in the 1990s • • • Change to meet user-requested requirements, independent of component availability More functional, higher cost, less reliable Greater need for risk-based management approach No Risk Investment "Success oriented", "can do" attitude, minimize thought of possible failure, leave little extra to handle contingencies • • • Reactive No planning No options for management consideration • Funds are not diverted to risk mitigation activities "Can do" attitude • Japanese software development • • • Change functionality in response to availability of components Less functional yet more reliable Less need for risk management Software Engineering Institute Risk Taxonomy Risk Identification Engineering for Professionals Product Engineering Class   Element   Product  Engineering   Requirements   Design   Code  &  Unit  Test   Integra6on  &  Test   Engineering  Special6es   -­‐  Stability   -­‐  Func'onality   -­‐  Feasibility   -­‐  Environment   -­‐  Maintainability   -­‐  Completeness   -­‐  Difficulty   -­‐  Tes'ng   -­‐  Product  Integra'on   -­‐  Reliability   -­‐  Clarity   -­‐  Interfaces   -­‐  Coding/Implementa'on   -­‐  System  Integra'on   -­‐  Safety   -­‐  Validity   -­‐  Performance   -­‐  Security   -­‐  Feasibility   -­‐  Testability   -­‐  Hunan  factors   -­‐  Precedent   -­‐  HW  constraints   -­‐  Specifica'ons   -­‐  Scale   -­‐  Non-­‐developmental  SW   AIribute   Engineering for Professionals Development Environment Development  Environment   Development  Process   Development  System   Management  Process   Management  methods   Work  environment   -­‐  Formality   -­‐  Capacity   -­‐  Planning   -­‐  Monitoring   -­‐  Quality  aOtude   -­‐  Suitability   -­‐  Suitability   -­‐  Project  organiza'on   -­‐  Personnel  management   -­‐  Coopera'on   -­‐  Process  Control   -­‐  Usability   -­‐  Management  experience   -­‐  Quality  assurance   -­‐  Communica'on   -­‐  Familiarity   -­‐  Familiarity   -­‐  Program  interfaces   -­‐  Configura'on  mgmt   -­‐  Morale   -­‐  Product  control   -­‐  Reliability   -­‐  System  support   -­‐  Deliverability   Engineering for Professionals Program Constraints Program  Constraints   Resources   Contract   -­‐  Schedule   -­‐  Type  of  contract   -­‐  Staff   -­‐  Restric'ons   -­‐  Budget   -­‐  Dependencies   -­‐  Facili'es   Engineering for Professionals Program  Interfaces   Customer  -­‐   -­‐  Corporate  Mgmt   Associate  contractor  -­‐   -­‐  Vendors   Subcontractors  -­‐   -­‐  Poli'cs   Prime  contractor  -­‐  
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Running Head: PROJECT RISK MANAGEMENT

Project Risk Management
Student’s Name
University Affiliation

1

PROJECT RISK MANAGEMENT

2
Introduction

Risks in a project may be foreseen or unforeseen. In either of the cases, good project
managers should be prepared with adequate ways of solving them. Some risk management plans
only address risks that can be foreseen and fail to offer solutions to the ones that may not be seen
(Businessedge, 2016). In this regard, project planning should encompass some degree of
schedule, cost and the margin of scope.
Risk Identification in a Project
Risk identification during a project timespan is not something that may be done once.
Th...