554 WK 10 Managing a Telecom Project

Dec 1st, 2014
HelloWorld
Category:
Computer Science
Price: $100 USD

Question description

If you do not have Microsoft Project do not bid on this assignment, it's a requirement.

For the main paper Include charts or diagrams created in Excel, Visio, MS Project, or one of their equivalents such as Open Project, Dia, and OpenOffice. The completed diagrams/charts must be imported into the Word document before the paper is submitted.

This assignment consists of two (2) sections: a written project plan, and a Gantt chart that is created through the use of MS Project. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Due to your extensive ability and knowledge of project management, you have been promoted as a senior project manager for a national telecom organization. For this role, you will be responsible in managing the launch of a new telecom service that will attract new customers. This project will require:

  • Updating cloud-based systems that interface with customers. This effort requires programmers to update databases and Web interfaces that will include new telecom service details. 
  • Performing billing configurations to financial information systems. This effort includes modifying the back-end programs that calculate billing and financial reports data and include new telecom service rates.
  • Providing training on the new service for the company’s customer service staff. This effort includes developing an online training manual, conducting training for customer service staff, and updating an internal Website with a Frequently Asked Questions section for new telecom service.

Your job is to assist in the development of each described deliverable.

Your team is composed of three (3) Web-based developers, one (1) database manager, one (1) network specialist, two (2) technical trainers, and one (1) technical writer. They are devoted to operational management duties 30% of the time. One of the Web-based developers has recently joined the team and has minimal experience with configuring cloud-based systems.

The service product launch must be completed within six (6) months. Upper management is available to supply the necessary funding required to complete this project.

Section 1: Written Project Plan 

Write a ten to twelve (10-12) page paper in which you:

  1. Select a project management framework / methodology that could be used to develop this project and ensure that project objectives are met. Provide the rationale for your selection. 
  2. Evaluate the possibility of using agile project management for any deliverables of the project.
  3. Develop a WBS that meets the project scope. Provide details at the activity level for the efforts required to achieve each deliverable. Note: WBS must be in indented format as shown in Figure 5.5B in Chapter 5 of the text.
  4. List all possible resources that would be required for completing this project. Assign resources to each activity. Describe each resource’s role and the level of experience each activity would require. 
  5. Utilize estimation techniques to generate estimates of costs, resources, and durations for each activity. Determine the constraints that must be observed and the basis for each estimate.
  6. Determine the monitoring and control process that will be utilized for the project. Include discussion on how you would perform earned value analysis to provide details on project status. Determine the values that could be utilized to calculate planned costs, actual costs, and earned value. 
  7. Develop a quality management plan that will minimize defects for project deliverables. Determine the frequency and metrics that will be utilized for inspections.
  8. Determine the techniques that could be used to enumerate the various risks that may exist within the project. Recommend risk management practices that will mitigate ongoing risks throughout the project. 
  9. Use at least six (6) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. 

Section 1 of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. 
  • Include charts or diagrams created in Excel, Visio, MS Project, or one of their equivalents such as Open Project, Dia, and OpenOffice. The completed diagrams/charts must be imported into the Word document before the paper is submitted.

Section 2: Gantt Chart

Use Microsoft project to create a Gantt chart in which you:

  1. Record the data generated from the estimation process. 
  2. Describe your assumptions and declare the dependencies for the logical succession of each activity. 

Use this template APA_Template_With_Advice_(6th_Ed) .doc


Tutor Answer

(Top Tutor) Daniel C.
(997)
School: UT Austin
PREMIUM TUTOR

Studypool has helped 1,244,100 students

8 Reviews


Summary
Quality
Communication
On Time
Value
Five Star Tutor
Dec 8th, 2016
" Outstanding Job!!!! "
kpcutie
Nov 25th, 2016
" Excellent job "
Joemoe
Nov 16th, 2016
" <3 it, thanks for saving me time. "
Hemapathy
Nov 11th, 2016
" all I can say is wow very fast work, great work thanks "
pmallory
Nov 2nd, 2016
" Totally impressed with results!! :-) "
kevin12622
Oct 20th, 2016
" Goes above and beyond expectations ! "
kiln82
Oct 11th, 2016
" awesome work thanks "
likeplum4
Sep 27th, 2016
" Excellent work as usual "
Ask your homework questions. Receive quality answers!

Type your question here (or upload an image)

1819 tutors are online

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors