Task Name
Duration
Start
Finish
Commercial Construction
344
days
Mon 19-09-30
Thu 21-0121
17 days
Mon 19-09-30 Tue 19-10-22
Receive notice to proceed and sign contract
3 days
Mon 19-09-30 Wed 19-10-02
Submit bond and insurance documents
2 days
Thu 19-10-03
Prepare and submit project schedule
2 days
Mon 19-10-07 Tue 19-10-08
Prepare and submit schedule of values
2 days
Wed 19-10-09 Thu 19-10-10
Obtain building permits
4 days
Thu 19-10-03
Submit preliminary shop drawings
2 wks
Wed 19-10-09 Tue 19-10-22
1 day
70 days
Thu 19-10-03
Fri 19-10-04
Thu 19-10-03
Thu 20-01-09
2 wks
Fri 19-10-04
Thu 19-10-17
2 wks
Wed 19-10-23 Tue 19-11-05
2 wks
Wed 19-10-23 Tue 19-11-05
2 wks
Wed 19-10-23 Tue 19-11-05
2 wks
Wed 19-10-23 Tue 19-11-05
2 wks
Wed 19-10-23 Tue 19-11-05
12 wks
Fri 19-10-18
Thu 20-01-09
10 days
Thu 19-10-03
Wed 19-10-16
Install temporary power
Install temporary water service
2 days
2 days
Thu 19-10-03
Thu 19-10-03
Fri 19-10-04
Fri 19-10-04
Set up site office
3 days
Mon 19-10-07 Wed 19-10-09
Set line and grade benchmarks
3 days
Thu 19-10-10
Mon 19-10-14
Prepare site - lay down yard and temporary fencing
2 days
Tue 19-10-15
Wed 19-10-16
35 days
Thu 19-10-17
Wed 19-12-04
3 days
Thu 19-10-17
Mon 19-10-21
General Conditions
Submit monthly requests for payment
Long Lead Procurement
Submit shop drawings and order long lead items steel
Submit shop drawings and order long lead items roofing
Submit shop drawings and order long lead items elevator
Submit shop drawings and order long lead items plumbing
Submit shop drawings and order long lead items electric
Submit shop drawings and order long lead items HVAC
Detail, fabricate and deliver steel
Mobilize on Site
Site Grading and Utilities
Clear and grub site
Fri 19-10-04
Tue 19-10-08
Stone site access and temporary parking area
2 days
Tue 19-10-22
Wed 19-10-23
Rough grade site (cut and fill)
1 wk
Thu 19-10-24
Wed 19-10-30
Install storm drainage
2 wks
Thu 19-10-31
Wed 19-11-13
Install exterior fire line and building fire riser
2 wks
Thu 19-10-31
Wed 19-11-13
Perform final site grading
2 wks
Thu 19-11-14
Wed 19-11-27
Erect building batter boards and layout building
1 wk
Thu 19-11-28
Wed 19-12-04
33 days
Thu 19-12-05
Mon 20-01-20
Excavate foundations
2 wks
Thu 19-12-05
Wed 19-12-18
Excavate elevator pit
Form column piers and spread foundations
Rough-in electric and plumbing in elevator
2 days
4 days
4 days
Thu 19-12-05 Fri 19-12-06
Thu 19-12-19 Tue 19-12-24
Mon 19-12-09 Thu 19-12-12
Form elevator pit walls
4 days
Fri 19-12-13
Set reinforcing and anchor bolts
4 days
Wed 19-12-25 Mon 19-12-30
Pour column piers and foundations
5 days
Tue 19-12-31
Mon 20-01-06
Pour concrete elevator walls
1 day
Thu 19-12-19
Thu 19-12-19
Cure elevator wall concrete
7 days
Fri 19-12-20
Mon 19-12-30
Cure piers and foundations
7 days
Tue 20-01-07
Wed 20-01-15
Strip wall forms
1 day
Tue 19-12-31
Tue 19-12-31
Strip column piers and foundation forms
3 days
Thu 20-01-16
Mon 20-01-20
Install pneumatic tube in elevator pit
3 days
Wed 20-01-01 Fri 20-01-03
Prepare and pour concrete floor in elevator pit
1 day
Mon 20-01-06 Mon 20-01-06
45 days
Tue 20-01-21
Mon 20-03-23
2 wks
Tue 20-01-21
Mon 20-02-03
2 wks
Tue 20-02-04
Mon 20-02-17
2 wks
Tue 20-02-04
Mon 20-02-17
2 wks
Tue 20-02-18
Mon 20-03-02
Foundations
Steel Erection
Erect steel columns, beams and joist - 1st and 2nd
floors
Erect steel columns, beams and joist - 3rd floor and
roof
Install miscellaneous iron and bracing - 1st and 2nd
floors
Install miscellaneous iron and bracing - 3rd floor and
roof
Wed 19-12-18
Install stairs and miscellaneous iron railing
2 wks
Tue 20-03-03
Mon 20-03-16
Touch-up paint on steel
1 wk
Tue 20-03-17
Mon 20-03-23
85 days
Tue 20-02-04
Mon 20-06-01
5 days
Tue 20-03-24
Mon 20-03-30
5 days
Tue 20-02-04
Mon 20-02-10
4 days
7 days
2 days
Tue 20-03-31 Fri 20-04-03
Mon 20-04-06 Tue 20-04-14
Wed 20-04-15 Thu 20-04-16
Form 3rd floor including all floor openings
5 days
Wed 20-04-15 Tue 20-04-21
Install rebar and in-floor utilities (including
mechanical, electrical, plumbing)
5 days
Wed 20-04-15 Tue 20-04-21
Pour 3rd floor slab
4 days
Wed 20-04-22 Mon 20-04-27
Cure 3rd floor slab
7 days
Tue 20-04-28
Wed 20-05-06
Strip forms from 3rd floor slab
2 days
Thu 20-05-07
Fri 20-05-08
Form roof slab including all floor openings
5 days
Thu 20-05-07
Wed 20-05-13
5 days
Thu 20-05-07
Wed 20-05-13
4 days
7 days
Thu 20-05-14 Tue 20-05-19
Wed 20-05-20 Thu 20-05-28
Strip forms from roof slab
2 days
Fri 20-05-29
Mon 20-06-01
Form 1st floor
4 days
Fri 20-04-17
Wed 20-04-22
Install electrical underground
Install plumbing underground
1 wk
1 wk
Fri 20-04-17
Fri 20-04-17
Thu 20-04-23
Thu 20-04-23
Install rebar and in-floor utilities
4 days
Fri 20-04-17
Wed 20-04-22
Pour 1st floor slab
4 days
Fri 20-04-24
Wed 20-04-29
Cure 1st floor slab
Strip forms from 1st floor slab
7 days
2 days
Thu 20-04-30 Fri 20-05-08
Mon 20-05-11 Tue 20-05-12
15 days
Tue 20-06-02
Mon 20-06-22
3 wks
Tue 20-06-02
Mon 20-06-22
110 days Tue 20-03-03
Mon 20-08-03
Form and Pour Concrete - Floors and Roof
Form 2nd floor including all floor openings
Install rebar and in-floor utilities (including
mechanical, electrical, plumbing)
Pour 2nd floor slab
Cure 2nd floor slab
Strip forms from 2nd floor slab
Install rebar and in-floor utilities (including
mechanical, electrical, plumbing)
Pour roof slab
Cure roof slab
Carpentry Work
Install exterior sheathing and metal studs
Masonry Work
Rough-in plumbing at toilets and masonry walls
4 wks
Wed 20-05-13 Tue 20-06-09
Lay masonry at core, mechanical, and toilets
4 wks
Tue 20-03-03
Mon 20-03-30
Install exterior masonry work
5 wks
Tue 20-06-23
Mon 20-07-27
Install roof drains
2 days
Tue 20-07-28
Wed 20-07-29
Install tile in toilet rooms
2 wks
Wed 20-06-10 Tue 20-06-23
Clean masonry
1 wk
Tue 20-07-28
Mon 20-08-03
Clean toilet room tile
Roofing
Install flashing at parapet walls
Pour lightweight concrete roof fill
Install seamless roofing material
Spread stone ballast on seamless roof
Set rooftop equipment
1 wk
31 days
4 days
2 days
5 days
5 days
2 wks
Wed 20-06-24
Tue 20-07-28
Tue 20-07-28
Mon 20-08-03
Wed 20-08-12
Wed 20-08-19
Wed 20-08-26
Tue 20-06-30
Tue 20-09-08
Fri 20-07-31
Tue 20-08-04
Tue 20-08-18
Tue 20-08-25
Tue 20-09-08
Window wall and store front closures
60 days
Tue 20-07-28
Mon 20-10-19
Install window wall aluminum and glass
5 wks
Tue 20-07-28
Mon 20-08-31
Install interior stud walls and drywall
5 wks
Tue 20-09-01
Mon 20-10-05
Install interior doors and hardware
2 wks
Tue 20-10-06
Mon 20-10-19
Install store front doors and hardware
3 wks
Tue 20-07-28
Mon 20-08-17
80 days
Tue 20-09-01
Mon 20-12-21
Install millwork and wood trim
3 wks
Tue 20-10-06
Mon 20-10-26
Paint walls and woodwork
4 wks
Tue 20-10-27
Mon 20-11-23
Install conduit at ceiling plenum space
3 wks
Tue 20-09-01
Mon 20-09-21
Install duct in ceiling plenum space
3 wks
Tue 20-10-06
Mon 20-10-26
Install ceiling grid
2 wks
Tue 20-10-27
Mon 20-11-09
Install ceiling tile
2 wks
Tue 20-11-10
Mon 20-11-23
Hang wallpaper
2 wks
Tue 20-11-10
Mon 20-11-23
Install building carpet
4 wks
Tue 20-11-24
Mon 20-12-21
Install hardware and accessories
3 wks
Tue 20-11-24
Mon 20-12-14
Building Finishes
Complete interior and exterior sod and plantings
2 wks
Tue 20-11-24
Mon 20-12-07
Pave, curb, and stripe parking lot
2 wks
Tue 20-12-08
Mon 20-12-21
40 days
Tue 20-03-31
Mon 20-05-25
Set elevator equipment in shafts
4 wks
Tue 20-03-31
Mon 20-04-27
Set equipment in mechanical room
2 wks
Tue 20-04-28
Mon 20-05-11
Test and align doors and equipment
2 wks
Tue 20-05-12
Mon 20-05-25
90 days
Tue 20-08-04
Mon 20-12-07
Rough-in plumbing in drywall walls
4 wks
Tue 20-09-01
Mon 20-09-28
Tie-in fire line riser and set valves
2 wks
Tue 20-08-04
Mon 20-08-17
Set plumbing fixtures and trim
3 wks
Tue 20-09-29
Mon 20-10-19
Flush, test, and clean piping and fixtures
2 wks
Tue 20-11-24
Mon 20-12-07
Elevators
Plumbing
Electrical
139 days Wed 20-05-13 Mon 20-11-23
Rough-in electrical in masonry walls
4 wks
Wed 20-05-13 Tue 20-06-09
Rough-in electrical in drywall walls
4 wks
Tue 20-09-01
Mon 20-09-28
Pull wire in conduit and set area transformers
3 wks
Tue 20-09-22
Mon 20-10-12
Install and terminate electrical devices
3 wks
Tue 20-10-13
Mon 20-11-02
Make electrical terminations for HVAC equipment
2 days
Tue 20-10-13
Wed 20-10-14
Install light fixtures - test and clean
2 wks
Tue 20-11-10
Mon 20-11-23
180 days Tue 20-03-31
Mon 20-12-07
Set equipment in mechanical room
2 wks
Tue 20-03-31
Mon 20-04-13
Rough-in mechanical in masonry walls
4 wks
Wed 20-05-13 Tue 20-06-09
Rough-in mechanical in drywall walls
2 wks
Tue 20-09-01
Mon 20-09-14
Install duct in building chase
3 wks
Tue 20-09-01
Mon 20-09-21
Set HVAC trim and test and balance system
4 wks
Tue 20-11-10
Mon 20-12-07
Heating and Ventilating - AC
Final Clean-up and Occupancy
60 days
Tue 20-10-06
Mon 20-12-28
Install hard tile flooring in common areas
1 wk
Tue 20-10-06
Mon 20-10-12
Clean hard tile floors
4 days
Tue 20-10-13
Fri 20-10-16
Remove debris from building and do final clean-up
4 days
Tue 20-12-22
Fri 20-12-25
Substantial completion date
1 day
Mon 20-12-28 Mon 20-12-28
6 days
Mon 20-12-28 Mon 21-01-04
Complete elevator inspection and certification
3 days
Mon 20-12-28 Wed 20-12-30
Perform architect's inspection
1 day
Thu 20-12-31
Thu 20-12-31
Perform local building agency inspection
1 day
Fri 21-01-01
Fri 21-01-01
Perform Fire Marshal's inspection
1 day
Mon 21-01-04 Mon 21-01-04
Complete punch list items from all inspections
2 wks
Tue 21-01-05
Mon 21-01-18
Obtain certificate of occupancy
2 days
Tue 21-01-19
Wed 21-01-20
Issue final completion documents including warranties
1 day
Tue 21-01-19
Tue 21-01-19
Issue final request for payment
1 day
Thu 21-01-21
Thu 21-01-21
Complete Final Inspections
Predecessors
Resource Names
G.C. General Management
2 G.C. Project Management,G.C. General Management[25%]
3 G.C. Project Management[25%],G.C. Scheduler
4 G.C. General Management[10%],G.C. Project Management
2 G.C. Project Management[50%],G.C. Procurement[50%]
6 G.C. Project Management[50%],G.C. Procurement[50%]
2
8 Steel Erection Contractor Management
7 Roofing Contractor Management
7 Elevator Contractor Management
7 Plumbing Contractor Management
7 Electric Contractor Management
7 HVAC Contractor Management
10
Steel Erection Contractor Management[50%],Steel Erection
Contractor[50%]
2 Electric Contractor
2 Plumbing Contractor
18,19
G.C. Superintendent,G.C. Labor Crew[10%]
20 G.C. Survey Crew
21 Site Grading Contractor,G.C. Labor Crew[10%]
20,22
Site Grading Contractor
24,22
Site Grading Contractor
25 Site Grading Contractor
26 Site Grading Contractor
26 Plumbing Contractor
27FF+1 day,28
Site Grading Contractor
29 G.C. Survey Crew
30 Site Grading Contractor[50%]
30 Site Grading Contractor
32 G.C. Rough Carpenter Crew
33 Plumbing Contractor,Electric Contractor
35 G.C. Rough Carpenter Crew
34 G.C. Rough Carpenter Crew
37 G.C. Concrete Crew
36 G.C. Concrete Crew
39 G.C. Labor Crew[10%]
38 G.C. Labor Crew[10%]
40 G.C. Labor Crew[10%]
41 G.C. Labor Crew
42 Elevator Contractor
44 G.C. Concrete Crew
43,16
Steel Erection Contractor
47 Steel Erection Contractor
47 Steel Erection Contractor[75%]
48 Steel Erection Contractor[75%]
50 Steel Erection Contractor[50%]
51 Steel Erection Contractor[20%]
52,13,14,15,47
G.C. Rough Carpenter Crew,G.C. Labor Crew[20%]
G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric
Contractor[33%]
G.C. Concrete Crew
56 G.C. Labor Crew[10%]
57 G.C. Labor Crew
47
55,54
57 G.C. Rough Carpenter Crew[50%],G.C. Labor Crew[20%]
57
60,59
G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric
Contractor[33%]
G.C. Concrete Crew
61 G.C. Labor Crew[10%]
62 G.C. Labor Crew
62 G.C. Rough Carpenter Crew,G.C. Labor Crew[20%]
G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric
Contractor[33%]
G.C. Concrete Crew
66 G.C. Labor Crew[10%]
62
65,64
67 G.C. Labor Crew
58 G.C. Rough Carpenter Crew
58 Electric Contractor
58 Plumbing Contractor
G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric
58
Contractor[33%]
69,72,70,71
G.C. Concrete Crew
73 G.C. Labor Crew[10%]
74 G.C. Labor Crew
63,68
Drywall Contractor
75,13
Plumbing Contractor
49,50
Masonry Contractor
77 Masonry Contractor
81 Roofing Contractor
79 Tile Contractor
81 Masonry Contractor[50%]
83 Tile Contractor[50%]
11,82,87
88FS+5 days
81 Roofing Contractor
Roofing Contractor
Roofing Contractor
89 Roofing Contractor
90 HVAC Contractor
81 Window Contractor
93 Drywall Contractor
94 G.C. Finish Carpenter Crew
81 Window Contractor
96,94
G.C. Finish Carpenter Crew
98,95
Painting Contractor
93 Electric Contractor
94.100 HVAC Contractor
94.101 Drywall Contractor
102 Drywall Contractor
102 Painting Contractor
99 Carpet Contractor
99 G.C. Finish Carpenter Crew
99 Landscape Contractor
107 Paving Contractor
80,45,12
Elevator Contractor
110 Elevator Contractor
111 Elevator Contractor
93 Plumbing Contractor
84 Plumbing Contractor
85,114,79
Plumbing Contractor
99.115.116 Plumbing Contractor
75,14
Electric Contractor
93 Electric Contractor
119.100 Electric Contractor
121.120 Electric Contractor
121,91
Electric Contractor
102.122 Electric Contractor
80,15
HVAC Contractor
75 HVAC Contractor
93 HVAC Contractor
126,127,93
HVAC Contractor
102.129.123 HVAC Contractor
94 Tile Contractor
132 Tile Contractor[50%]
105.104.106.107.117.000.000.000 G.C. Labor Crew
134 G.C. Superintendent
134.112 Elevator Contractor
134.108.137 G.C. Superintendent[50%],G.C. Project Management[50%]
138 G.C. Project Management[50%],G.C. Superintendent[50%]
139 G.C. Superintendent[50%],G.C. Project Management[50%]
G.C. Superintendent[11%],G.C. Labor Crew[11%],Plumbing
Contractor[11%],Electric Contractor[11%],HVAC
140 Contractor[11%],Drywall Contractor[11%],Carpet
Contractor[11%],Paving Contractor[11%],Painting
Contractor[11%]
141 G.C. Project Management
141 G.C. Project Management
142.143
G.C. Project Management[33%],G.C. Accounting[33%],G.C.
General Management[33%]
Editable Version:
PRO JEC T MANAG EMENT PLAN
Project Title:Click here to enter text.
Date Prepared: Click here to enter a date.
Project Life Cycle:Click here to enter text.
Phase
Key Activities
Key Deliverables
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
How will you monitor
and
control?
Click
here
to enter text.
to text.
ClickWhat
here needs
to enter
happen before Phase
starts?
Click here
to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Same
Phases
as
Click here to enter text.
above.
Phase
Reviews
Entry Criteria
Exit Criteria
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
What are you
delivering
yourtext.
Click
here to to
enter
“Customer”?
Click here to enter text.
What has to be
completed to
Click here to enter text.
consider the Phase
Click here tocomplete?
enter text.
Click here to enter text.
Development Approaches:
Deliverable
Click here to enter text.
How are you going
Click here to enter text.
to deliver it?
Click here
to enter
text.
(Project
Charter)
(Project Charter)
Development Approach
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Subsidiary Management Plans:
Name
Read the introduction to each
here to enter text.
Knowledge Area in Click
PMBOK.
Summarize your approach here.
Click here to enter text.
Look at Book of Forms for more
ideas.
Comment
Scope
Time
Click here to enter text.
Cost
Click here to enter text.
Quality
Click here to enter text.
Resource
Click here to enter text.
Communications
Click here to enter text.
Risk
Click here to enter text.
Procurement
Click here to enter text.
Stakeholder
Click here to enter text.
Other Plans
Click here to enter text.
Variance Thresholds:
Scope Variance Threshold
Scope Baseline Management
Click here to enter text.
Ignore the “Variance
Thresholds and
baselines” Until next
class.
Schedule Variance Threshold
Schedule Baseline Management
Click here to enter text.
Click here to enter text.
Cost Variance Threshold
Cost Baseline Management
Click here to enter text.
Click here to enter text.
Baselines:Click here to enter text.
Attach all project baselines.
PROJECT MANAGEMENT PLAN
Project Title:Click here to enter text.
Date Prepared: Click here to enter a date.
Project Life Cycle:Click here to enter text.
Phase
Key Activities
Key Deliverables
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Phase
Reviews
Entry Criteria
Exit Criteria
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Development Approaches:
Deliverable
Development Approach
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Subsidiary Management Plans:
Name
Comment
Scope
Click here to enter text.
Time
Click here to enter text.
Cost
Click here to enter text.
Quality
Click here to enter text.
Resource
Click here to enter text.
Communications
Click here to enter text.
Risk
Click here to enter text.
Procurement
Click here to enter text.
Stakeholder
Click here to enter text.
Other Plans
Click here to enter text.
Variance Thresholds:
Scope Variance Threshold
Scope Baseline Management
Click here to enter text.
Click here to enter text.
Schedule Variance Threshold
Schedule Baseline Management
Click here to enter text.
Click here to enter text.
Cost Variance Threshold
Cost Baseline Management
Click here to enter text.
Click here to enter text.
Baselines:Click here to enter text.
Attach all project baselines
For instructions on using this template, please see Notes to Author/Template Instructions on page 17.
Notes on accessibility: This template has been tested and is best accessible with JAWS 11.0 or higher.
For questions about using this template, please contact CMS IT Governance. To request changes to the
template, please submit an XLC Process Change Request (CR).
Centers for Medicare & Medicaid Services
CMS eXpedited Life Cycle (XLC)
Project Management Plan
Version X.X
MM/DD/YYYY
Document Number:
Contract Number:
CMS XLC
Table of Contents
Table of Contents
1. Introduction .............................................................................................................. 1
1.1
1.2
Purpose of the Project Management Plan ....................................................... 1
Project Characterization .................................................................................. 1
2. Executive Summary of Project Charter .................................................................. 1
3. Overview ................................................................................................................... 1
4. Assumptions/Constraints/Risks ............................................................................. 2
4.1
4.2
4.3
Assumptions.................................................................................................... 2
Constraints ...................................................................................................... 2
Risks ............................................................................................................... 2
5. Project Scope ........................................................................................................... 2
5.1
5.2
5.3
5.4
5.5
5.6
Requirements Management ............................................................................ 2
Scope Statement ............................................................................................. 3
Scope Management ........................................................................................ 3
Work Breakdown Structure ............................................................................. 3
Deployment Plan ............................................................................................. 3
Change Control Management ......................................................................... 3
6. Overall Project Management Approach ................................................................. 3
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
Estimating ....................................................................................................... 3
Schedule Management ................................................................................... 4
6.2.1
Milestones.......................................................................................... 4
6.2.2
Project Schedule ................................................................................ 4
Financial Management (Cost/Budget Management) ....................................... 5
Earned Value Management............................................................................. 5
Performance Measurement ............................................................................. 5
Non-EVM Metrics ............................................................................................ 6
Quality Management ....................................................................................... 6
Staff Management ........................................................................................... 6
6.8.1
Project Team Training ....................................................................... 7
Communication Management ......................................................................... 7
6.9.1
Communications Matrix ..................................................................... 7
Risk Management ........................................................................................... 7
6.10.1 Risk Register (Risk Log) .................................................................... 8
Configuration Management ............................................................................. 8
Development Approach ................................................................................... 8
Issue Management .......................................................................................... 8
6.13.1 Issues List (Issue Log) ....................................................................... 9
Records Management ..................................................................................... 9
Acquisition Strategy ........................................................................................ 9
Project Management Plan Version X.X
ii
CMS XLC
6.16
6.17
6.18
List of Figures
6.15.1 Subcontractor Management............................................................... 9
Software Process Improvement (SPI) ........................................................... 10
Security ......................................................................................................... 10
Compliance Related Training ........................................................................ 10
Appendix A:
Record of Changes ........................................................................ 12
Appendix B:
Acronyms ....................................................................................... 13
Appendix C:
Glossary ......................................................................................... 14
Appendix D:
Referenced Documents ................................................................. 15
Appendix E:
Approvals ....................................................................................... 16
Appendix F:
Notes to the Author / Template Instructions ............................... 17
Appendix G:
XLC Template Revision History .................................................... 18
Appendix H:
Additional Appendices .................................................................. 19
List of Figures
No table of figures entries found.
List of Tables
Table 1: Project Characterization .................................................................................... 1
Table 2: Milestones ......................................................................................................... 4
Table 3: Record of Changes ......................................................................................... 12
Table 4: Acronyms ........................................................................................................ 13
Table 5: Glossary .......................................................................................................... 14
Table 6: Referenced Documents ................................................................................... 15
Table 7: XLC Template Revision History....................................................................... 18
Project Management Plan Version X.X
iii
CMS XLC
Introduction
1. Introduction
This Project Management Plan (PMP) provides detailed plans, processes, and
procedures for managing and controlling the life cycle activities of the project. It describes the processes and approaches for managing (i.e.,
planning, monitoring, and controlling) the project. The information in this PMP provides the basis for communication and
understanding among project team members and all other stakeholders.
1.1
Purpose of the Project Management Plan
Instructions: Provide the purpose of the project management plan.
The intended audience of the PMP is all project
stakeholders including the project sponsor, senior leadership and the project team.
1.2
Project Characterization
Instructions: Characterize the project by identifying the following key project attributes:
CMS Strategic Goals, CMS Enterprise Architecture Business Segment(s), CMS
Program(s), IT Investment (s), and IT Systems that are associated with this project.
Table 1: Project Characterization
CMS Strategic Goals
Enter the specific CMS strategic goals to which this project aligns.
CMS Enterprise
Architecture Segment
Enter the CMS Segment Enterprise Architecture that this Project
supports.
CMS Programs
Enter the program(s) that this project impacts.
CMS IT Investments
Enter specific investment(s) in the CMS Portfolio Management Tool
that are funding this project
CMS IT Systems
Enter any IT systems that will be impacted by this project.
2. Executive Summary of Project Charter
Instructions: Provide an executive summary of the approved project charter. Provide a
reference to the approved Project Charter. Elaborate on any sections within the Project
Charter that need further detail contained within the PMP.
3. Overview
Instructions: Provide a high-level overview of the project. Focus on the process and
deliverable aspects of the project, including contract type, start and end dates, major
Project Management Plan Version X.X
1
CMS XLC
Assumptions/Constraints/Risks
milestones, and stakeholders. Reference the Project Charter, if one exists.
4. Assumptions/Constraints/Risks
4.1
Assumptions
Instructions: Describe any assumptions or dependencies regarding the project that
impact this PMP. If this PMP includes detail sections, include all assumptions for all
approaches. If separate subsidiary plans accompany this PMP, you may include all
assumptions/dependencies here or in the individual subsidiary plans as appropriate.
4.2
Constraints
Instructions: Describe any limitations or constraints that have a significant impact on this
PMP. If separate subsidiary plans accompany this PMP, you may include all constraints
here or in the individual subsidiary plans as appropriate.
4.3
Risks
Instructions: Describe any risks associated with the content of this PMP and proposed
mitigation strategies. If separate subsidiary plans accompany this PMP, you may
include all risks here or in the individual subsidiary plans as appropriate. Remember to
include any identified risks in your project’s Risk Register.
5. Project Scope
5.1
Requirements Management
Instructions: Describe the approach for managing requirements during the project life
cycle to ensure that requirements are controlled to establish a baseline for
development, acquisition, or management, and to ensure plans, work products, and
activities are consistent with the requirements. Describe the approach to identifying,
developing, maintaining, and managing requirements. Discuss inputs, processes,
outputs, timing, entrance and exit criteria, events and other information as appropriate.
Include a description of the methods and tools that will be used, including the
requirements numbering convention that will be employed. Also identify the roles and
responsibilities specific to requirement management, and how participants will interface
with each other. Describe the traceability strategy, and how the requirements will be
structured in the requirements management tool or repository based on that strategy,
identifying the relationship, interface, or dependency on data in other tools.
If a separate, standalone Requirements Management Plan is created for the project,
refer to that plan in this section. If appropriate, also refer to other applicable PMP
subsidiary plans (e.g., Change Management Plan, Configuration Management (CM)
Plan, etc.). For guidance on requirements classification, refer to the CMS Requirements
Writers Guide, which is published on the CMS website located at:
Project Management Plan Version X.X
2
CMS XLC
Overall Project Management Approach
https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-InformationTechnology/XLC/Downloads/RequirementsWritersGuide.zip .
5.2
Scope Statement
Instructions: Describe the products and services to be provided for this project. The
scope statement provides a documented basis for making project decisions and for
confirming or developing a common understanding of the project among stakeholders. If
this PMP covers a portion of the SDLC, identify which SDLC phases are covered and
explain why the other phases are not included.
5.3
Scope Management
Instructions: Describe how the project scope will be defined, developed, verified, and
managed by the Project Management Team.
5.4
Work Breakdown Structure
Instructions: Provide the WBS down to the level at which control will be exercised, as a
baseline scope document. If appropriate, refer back to the corporate SDMP. The WBS
may be included in this section or referenced as an Appendix. Describe how the WBS
was created and defined.
5.5
Deployment Plan
Instructions: An example of a deployment plan includes an application launched to state
health partners. This section would discuss the approach for rolling out the application
to the end users, including conducting environment assessments, developing
memorandums of understandings, hardware/software installation and data conversion.
5.6
Change Control Management
Instructions: An example of a Change Control includes the development server for your
project administered by another organization that is responsible for installing machine
upgrades and there are scheduled outages that will impact your project schedule.
Changes to the project will need to be made to deal with the potential impact of the
scheduled outage.
6. Overall Project Management Approach
Instructions: Describe the overall project management approach or strategy. Refer to
PPA as appropriate.
6.1
Estimating
Instructions: Describe the process for estimating software development cost, effort, and
schedule for the project. Also, describe the process for estimating software size (e.g.,
function points, source lines of code), computer resources (e.g., millions of instructions
Project Management Plan Version X.X
3
CMS XLC
Overall Project Management Approach
per second (MIPS)), communications network capacity (e.g., local area network (LAN)
and wide area network (WAN) utilization, and data storage). If appropriate, refer to your
corporate SDMP for some or all of the content of this section. If a standalone Schedule
Management Plan is created and the subject of estimating is expanded or tailored in
that plan, refer to the Schedule Management Plan.
6.2
Schedule Management
Instructions: Describe the approach for how the Project Schedule will be established
and managed. This section should describe the approach for task definition, estimating
level of effort, resource allocation, methods and tools. It should also address schedule
management, including how schedule changes will be determined, obtaining agreement
on schedule changes, managing schedule changes, and measuring and reporting
schedule performance.
An example of schedule management approach is to establish a baseline within the first
two weeks of the project and monitor progress against the baseline on a weekly basis.
The Project Manager will be responsible for ensuring the project schedule is updated
with the latest information and never more than three business days out of date. For
variances on executive milestones greater than 10%, the project may choose to use
guidance specified by CPIC.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Schedule Management Plan is created for the project,
refer to that plan in this section. A template for a Schedule Management Plan is
available from the CMS website located at: https://www.cms.gov/Research-StatisticsData-and-Systems/CMS-Information-Technology/XLC/index.html. The template
provides further guidance as to content that should be considered for inclusion in this
section of the PMP or for inclusion in a standalone plan.
6.2.1 Milestones
The table below lists the milestones for this project, along with their estimated
completion timeframe.
Table 2: Milestones
Milestones
Estimated Completion Timeframe
6.2.2 Project Schedule
Instructions: Insert the project’s schedule or provide a reference to where it is stored.
Project Management Plan Version X.X
4
CMS XLC
6.2.2.1
Overall Project Management Approach
Dependencies
Instructions: Insert the schedule/project dependencies (both internal and external).
6.3
Financial Management (Cost/Budget Management)
Instructions: Document the agreed to Financial Measurement Baseline (FMB) for the
project and define how it will be tracked. Define the reviews that will be established for
reporting on the financial health of the project. Also define the invoicing requirements
and timelines for the project. This section should describe the financial management
approach for the project, including methods and tools, roles and responsibilities, and
training requirements, as well as the requirements and procedures for financial status
reporting, and the requirements and procedures for invoicing, if applicable.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Financial Management Plan is created for the project,
refer to that plan in this section. A template for a standalone Financial Management
Plan is available from the CMS website located at: https://www.cms.gov/ResearchStatistics-Data-and-Systems/CMS-InformationTechnology/XLC/Downloads/FinancialMgmtPlan.docx . The template provides further
guidance as to content that should be considered for inclusion in this section of the PMP
or for inclusion in a standalone plan. Insert the project’s cost management plan here or
provide a reference to where it is stored.
6.4
Earned Value Management
Instructions: Describe the Earned Value Management System (EVMS) that will be
employed to provide an integrated view of cost and schedule performance for the
project. If appropriate, refer back to the corporate SDMP. Describe the approach for
determining how EVM methods will be applied to control accounts and work packages.
For example, identify for what types of work packages will the various EVM methods
(e.g., level of effort, weighted milestones, percent complete, units complete, fixed
formula (0/100% , 50%/50%, etc.)) be applied . If subcontractors are involved, also
describe how the prime contractor will ensure an integrated EVM approach across the
entire project team. If appropriate, refer to your corporate SDMP for some or all of the
content of this section. If you create other subsidiary plans (e.g., Performance
Measurement Plan) that impact your EVM approach, refer to the respective plan.
6.5
Performance Measurement
Instructions: Describe the approach for performance measurement to include objectives
and standards, methods and tools, roles and responsibilities, as well as a time-phased
plan against which project performance will be measured. Also describe the data that
will be collected, where it will be stored, and the approach for analyzing the data.
Include a description of the approach for reporting metrics and for identifying and
addressing deficiencies.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Performance Measurement Plan is created for the
Project Management Plan Version X.X
5
CMS XLC
Overall Project Management Approach
project, refer to that plan in this section. A template for a standalone Performance
Measurement Plan is available from the CMS website located at:
https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-InformationTechnology/XLC/index.html. The template provides further guidance as to content that
should be considered for inclusion in this section of the PMP or for inclusion in a
standalone plan.
6.6
Non-EVM Metrics
Instructions: Describe the approach for identifying objective measures to assess
software design complexity and quality for the project. Describe all metrics to be
collected, when they will be collected, how they will be collected, how they will be
reported (e.g., graph, table, etc.), and how they will be analyzed and used to manage
the project. Project Service Level Agreements and Award Fee Plan metrics should also
be addressed. If appropriate, refer to your corporate SDMP for some or all of the
content of this section. If a standalone Performance Measurement Plan is created for
this project, refer to that plan as appropriate.
6.7
Quality Management
Instructions: Document the necessary information required to effectively manage quality
during the life cycle of the project. Define the project’s quality policies, procedures,
areas of application and associated criteria. Document the quality management
approach to include the quality objectives and standards, methods and tools, and roles
and responsibilities. Describe the operational techniques and activities that will be used
to provide quality assurance, including identification of the assessments, reviews, and
audits that will be conducted, the process for quality analysis, how quality will be
determined and measured, and how corrective actions will be handled.
An example for an information system, controlling the consistency of screen layouts
would include reviewing all screens to make sure they match the standards. Quality
measures may be no bugs or defects for certain critical requirements, consistent screen
layouts, or correctly calculating variables. Quality may be ensured through inspections,
audits, formal testing and documentation of defects in a defect tracking system to
ensure defects are fixed, retested and closed. Some projects may choose to use a
traceability matrix to determine if critical requirements have been met.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Quality Management Plan is created for the project,
refer to that plan in this section. A template for a standalone Quality Management Plan
is available from the CMS website located at: https://www.cms.gov/Research-StatisticsData-and-Systems/CMS-Information-Technology/XLC/index.html. The template
provides further guidance as to content that should be considered for inclusion in this
section of the PMP or for inclusion in a standalone plan.
6.8
Staff Management
Instructions: Insert the project’s human resource management plan or staff
management plan or provide a reference to where it is stored.
Project Management Plan Version X.X
6
CMS XLC
Overall Project Management Approach
6.8.1 Project Team Training
Instructions: Insert the project team training plan or provide a reference to where it is
stored.
6.9
Communication Management
Describe the protocol for conducting effective project communications to help manage
project team and stakeholder expectations and prevent un-channeled communication.
Document the methods and activities needed to ensure timely and appropriate
collection, generation, dissemination, storage, and ultimate disposition of project
information among the project team and stakeholders. Identify the primary stakeholder
groups and the specific communication goals and objectives for each. Also define which
groups do not have access to certain information and what type of information will not
be widely distributed.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Communication Management Plan is created for the
project, refer to that plan in this section. A template for a standalone Communication
Management Plan is available from the CMS website located at:
https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-InformationTechnology/XLC/Downloads/CommunicationsMgmtPlan.docx. The template provides
further guidance as to content that should be considered for inclusion in this section of
the PMP or for inclusion in a standalone plan.
6.9.1 Communications Matrix
Instructions: Describe the approach for identifying communication items, and include a
Communications Matrix found in the appendix of the communication management plan
that defines the details of the communication items.
6.10 Risk Management
Instructions: Define the process details for managing risks during the life of the project.
Describe the approach for risk management to include the protocol for risk identification,
risk analysis, risk response planning, and risk monitoring, control, and reporting, as well
as identify roles and responsibilities and mechanisms for process improvement. Include
an initial Risk Register, if appropriate.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Risk Management Plan is created for the project, refer
to that plan in this section. A template for a standalone Risk Management Plan is
available from the CMS website located at: https://www.cms.gov/Research-StatisticsData-and-Systems/CMS-Information-Technology/XLC/Downloads/RiskMgmtPlan.docx.
The template provides further guidance as to content that should be considered for
inclusion in this section of the PMP or for inclusion in a standalone plan.
Project Management Plan Version X.X
7
CMS XLC
Overall Project Management Approach
6.10.1 Risk Register (Risk Log)
Instructions: The Risk Register is normally maintained as a separate document. Provide
a reference to where it is stored.
6.11 Configuration Management
Instructions: Describe the configuration management (CM) approach for the project to
include methods and tools, roles and responsibilities, and the CM environment. Also
describe the process for CM administration to include configuration identification (i.e.,
naming standard, types of baselines, and project inventory storage and retention),
configuration control (i.e., change requests and tracking and controlling changes), and
configuration integrity (i.e., configuration status accounting and configuration audits).
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone CM Plan is created for the project, refer to that plan in
this section. A template for a standalone CM Plan is available from the CMS website
located at: https://www.cms.gov/Research-Statistics-Data-and-Systems/CMSInformation-Technology/XLC/index.html. The template provides further guidance as to
content that should be considered for inclusion in this section of the PMP or for inclusion
in a standalone plan.
For additional guidance, refer to the CMS Policy for Configuration Management, which
is published on the CMS website located at: https://www.cms.gov/Research-StatisticsData-and-Systems/CMS-Information-Technology/XLC/index.html.
6.12 Development Approach
Instructions: Describe the approach for development of the system to include the
identification of the selected development methodology, a description of the approach
for lifecycle management and transition, methods and tools, and roles and
responsibilities.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Development Approach Plan is created for the
project, refer to that plan in this section. A template for a standalone Development
Approach Plan is available from the CMS Integrated IT Investment & System Life Cycle
Framework website located at: http://www.cms.gov/Research-Statistics-Data-andSystems/CMS-Information-Technology/SystemLifecycleFramework/index.html . The
template provides further guidance as to content that should be considered for inclusion
in this section of the PMP or for inclusion in a standalone plan.
For additional guidance, refer to Selecting a Development Approach, which is published
on the CMS website located at: https://www.cms.gov/Research-Statistics-Data-andSystems/CMS-InformationTechnology/XLC/Downloads/SelectingDevelopmentApproach.pdf
6.13 Issue Management
Instructions: Insert the project’s issue management plan or provide a reference to where
it is stored.
Project Management Plan Version X.X
8
CMS XLC
Overall Project Management Approach
6.13.1 Issues List (Issue Log)
Instructions: The Issues List is normally maintained as a separate document. Provide a
reference to where it is stored.
6.14 Records Management
Instructions: Describe the approach for ensuring proper and adequate records
management for the project in accordance with the HHS Office of the Chief Information
Officer (OCIO) Policy for Records Management, which is published on the HHS Internet
website at: http://www.hhs.gov/ocio/policy/. Records management applies to the
management of all records, regardless of medium (i.e., paper, electronic, microfiche,
data files or other) on which the records are created, used, filed, or retrieved
(databases, file cabinets, database management systems, etc.).
Describe the objectives, responsibilities, standards, guidelines, and instructions for
records creation, maintenance and use (including access rights), adequate
documentation, and proper records disposition. Much of the records management
process may be documented in other PMP subsidiary plans (e.g., Configuration
Management Plan, Quality Management Plan, etc.) and/or other sections of this
document (e.g., Security), which may be referenced here. As applicable, describe the
retention, transfer, retirement, or destruction of project records in accordance with CMS
Records Schedules, which are published on the CMS Intranet website at:
http://cmsnet.cms.hhs.gov/hpages/oics/records/tblcont.htm).
6.15 Acquisition Strategy
Instructions: An example of an acquisition strategy is that this can include information
such as ensuring project team members are assigned computers, how development
and test servers are procured or can go into more detail and include an acquisition
strategy that details how the project will be staffed (e.g., performance based fixed price
contract, CITS contractors).
6.15.1 Subcontractor Management
Instructions: If applicable, describe the approach or strategy for subcontractor
management, to include a description of the methods and tools, roles and
responsibilities, plans for measuring and reporting performance, and managing nonconformance.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Subcontractor Management Plan is created for the
project, refer to that plan in this section. A template for a standalone Subcontractor
Management Plan is available from the CMS website located at:
https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-InformationTechnology/XLC/index.html. The template provides further guidance as to content that
should be considered for inclusion in this section of the PMP or for inclusion in a
standalone plan.
Project Management Plan Version X.X
9
CMS XLC
Overall Project Management Approach
6.16 Software Process Improvement (SPI)
Instructions: Describe the approach for continued software development process
improvement during the life cycle of the project. Identify the specific actions that will be
taken to improve the software process, and outline the plans for implementing those
actions. Provide a brief history of any formal appraisals, audits, or other process reviews
conducted, including a description of the process review methodology, findings, and
recommendations. Describe the SPI approach to include the goals, methodology, and
roles and responsibilities.
If appropriate, refer to your corporate SDMP for some or all of the content in this
section. If a separate, standalone Software Process Improvement Plan (SPIP) is
created for the project, refer to that plan in this section. A template for a standalone
SPIP is available from the CMS website located at: https://www.cms.gov/ResearchStatistics-Data-and-Systems/CMS-Information-Technology/XLC/index.html. The
template provides further guidance as to content that should be considered for inclusion
in this section of the PMP or for inclusion in a standalone plan.
For additional guidance, refer to the CMS Policy for Capability Maturity Model
Integration (CMMI) ®, which is published on the CMS website located at:
https://www.cms.gov/Research-Statistics-Data-and-Systems/CMS-InformationTechnology/XLC/index.html.
6.17 Security
Instructions: Describe how the integrity, availability, and confidentiality of all data, files,
and records, including client records, related to the project will be satisfied in
accordance with applicable state and federal laws, rules and regulations, and CMS
program-specific supplemental protocols. Describe the security organization, physical
security controls, logical controls, policies, and standards that are in place to ensure the
protection and confidentiality of protected data and information, including those for
security incident response/handling and breach notification.
The security approach must also address security awareness training, network security,
data security, data transmission, data storage, data encryption, data re-use, segregation
of duties, security monitoring, personnel security controls, business continuity, disaster
recovery controls, and closeout for the project. Describe the secure coding best
practices and security testing tools that will be employed during development. Identify
the security risks that exist and the mitigation strategies that are in place. If appropriate,
refer to your corporate SDMP for some or all of the content of this section. Reference to
the System Security Plan should be made from this section.
6.18 Compliance Related Training
Instructions: Insert a list of compliance related processes the project must adhere to.
Compliance related processes may include:
•
•
•
Capital Planning and Investment Control (CPIC)
Security (including the C&A process)
Enterprise Architecture
Project Management Plan Version X.X
10
CMS XLC
•
•
•
•
Overall Project Management Approach
Section 508 Compliance
Records Management
Privacy Impact Assessment (PIA)
PHIN related requirements (PHIN Vocabulary and PHIN Messaging)]
Project Management Plan Version X.X
11
CMS XLC
Record of Changes
Appendix A: Record of Changes
Instructions: Provide information on how the development and distribution of the Project
Management Plan will be controlled and tracked. Use the table below to provide the
version number, the date of the version, the author/owner of the version, and a brief
description of the reason for creating the revised version.
Table 3: Record of Changes
Version
Number
Date
Author/Owner
Project Management Plan Version X.X
Description of Change
12
CMS XLC
Acronyms
Appendix B: Acronyms
Instructions: Provide a list of acronyms and associated literal translations used within
the document. List the acronyms in alphabetical order using a tabular format as
depicted below.
Table 4: Acronyms
Acronym
Literal Translation
CMS
Centers for Medicare & Medicaid Services
EVM
Earned Value Management
PMP
Project Management Plan
SDMP
System Development Management Plan
PPA
Project Process Agreement
CM
Configuration Management
SPIP
Software Process Improvement Plan
WBS
Work Breakdown Structure
Project Management Plan Version X.X
13
CMS XLC
Glossary
Appendix C: Glossary
Instructions: Provide clear and concise definitions for terms used in this document that
may be unfamiliar to readers of the document. Terms are to be listed in alphabetical
order.
Table 5: Glossary
Term
Definition
Records Management
The planning, controlling, directing, organizing, training,
promoting, and other managerial activities involved with
respect to records creation, records maintenance and
use, and records disposition in order to achieve
adequate and proper documentation of the policies and
transactions of the Federal Government and effective
and economical management of agency operations. (44
U.S.C. 2901 [2]).
Work Breakdown Structure (WBS)
A deliverable-oriented grouping of project components
that organizes and defines the total scope of the
project; work not in the WBS is outside the scope of the
project. A WBS is normally presented in chart form.
Each descending level represents an increasingly
detailed description of the project deliverables.
Project Management Plan Version X.X
14
CMS XLC
Referenced Documents
Appendix D: Referenced Documents
Instructions: Summarize the relationship of this document to other relevant documents.
Provide identifying information for all documents used to arrive at and/or referenced
within this document (e.g., related and/or companion documents, prerequisite
documents, relevant technical documentation, etc.).
Table 6: Referenced Documents
Document Name
Project Management Plan Version X.X
Document Location and/or URL
15
Issuance
Date
CMS XLC
Approvals
Appendix E: Approvals
The undersigned acknowledge that they have reviewed the Project Management Plan
and agree with the information presented within this document. Changes to this Project
Management Plan will be coordinated with, and approved by, the undersigned, or their
designated representatives.
Instructions: List the individuals whose signatures are desired. Examples of such
individuals are Business Owner, Project Manager (if identified), and any appropriate
stakeholders. Add additional lines for signature as necessary.
Signature:
Date:
Print Name:
Title:
Role:
Signature:
Date:
Print Name:
Title:
Role:
Signature:
Date:
Print Name:
Title:
Role:
Project Management Plan Version X.X
16
CMS XLC
Notes to the Author / Template Instructions
Appendix F: Notes to the Author / Template Instructions
This document is a template for creating a Project Management Plan for a given
investment or project. The final document should be delivered in an electronically
searchable format. The Project Management Plan should stand on its own with all
elements explained and acronyms spelled out for reader/reviewers, including reviewers
outside CMS who may not be familiar with CMS projects and investments.
This template includes instructions, boilerplate text, and fields. The developer should
note that:
•
Each section provides instructions or describes the intent, assumptions, and
context for content included in that section. Instructional text appears in blue
italicized font throughout this template.
•
Instructional text in each section should be replaced with information specific to
the particular investment.
•
Some text and tables are provided as boilerplate examples of wording and
formats that may be used or modified as appropriate.
When using this template, follow these steps:
1. Table captions and descriptions are to be placed centered, above the table.
2. Modify any boilerplate text, as appropriate, to your specific investment.
3. Do not delete any headings. If the heading is not applicable to the investment,
enter “Not Applicable” under the heading.
4. All documents must be compliant with Section 508 requirements.
5. Figure captions and descriptions are to be placed centered, below the figure.
All figures must have an associated tag providing appropriate alternative text
for Section 508 compliance.
6. Delete this “Notes to the Author / Template Instructions” page and all
instructions to the author before finalizing the initial draft of the document.
Project Management Plan Version X.X
17
CMS XLC
XLC Template Revision History
Appendix G: XLC Template Revision History
The following table records information regarding changes made to the XLC template
over time. This table is for use by the XLC Steering Committee only. To provide
information about the controlling and tracking of this artifact, please refer to the Record
of Changes section of this document.
Table 7: XLC Template Revision History
Version
Number
Date
Author/Owner
Description of Change
1.0
12/17/2008
K. Maenner,
OIS/EASG/DITPPA
Baseline version.
2.0
08/14/2014
Celia Shaunessy, XLC
Steering Committee
Changes made per CR 14-012.
2.1
02/02/2015
Surya Potu,
CMS/OEI/DPPIG
Updated CMS logo
Project Management Plan Version X.X
18
CMS XLC
Additional Appendices
Appendix H: Additional Appendices
Instructions: Utilize additional appendices to facilitate ease of use and maintenance of
the document. Suggested appendices include, but are not limited to, WBS and
subsidiary plans, if appropriate.
Project Management Plan Version X.X
19
Assignment Name: House Renovation
Group Number: Group 11
A00208210 Sharma, Kamakshi
A00227059 Vemuganti, Sai Saketh
A00221880 Vurugonda, Vijay Kumar
A00223608 Davis, Giovonni
BUS-1099 Project Integration Management
Submitted to: Kevin Bryanton
Submitted on: May 25, 2021
Table of Contents
PROJECT CHARTER .................................................................................................................... 1
Project Purpose:........................................................................................................................... 1
High-Level Project Description: ................................................................................................. 1
Project Boundaries: ..................................................................................................................... 1
Key Deliverables: ........................................................................................................................ 1
High-Level Requirements: .......................................................................................................... 2
Overall Project Risk .................................................................................................................... 2
Scope: .......................................................................................................................................... 2
Time: ........................................................................................................................................... 2
Project Objectives ....................................................................................................................... 3
Preapproved Financial Resources: .............................................................................................. 3
Stakeholders and Role: ................................................................................................................ 3
Project Exit Criteria:.................................................................................................................... 3
Project Manager Authority Level: .................................................................................................. 4
Staffing Decisions: ...................................................................................................................... 4
Budget Management and Variance: ............................................................................................ 4
Technical Decisions: ................................................................................................................... 4
Conflict Resolution: .................................................................................................................... 4
Sponsor Authority: ...................................................................................................................... 4
ASSUMPTION LOG .....................................................................Error! Bookmark not defined.
GROUP LOG .................................................................................................................................. 8
References ..................................................................................................................................... 10
PROJECT CHARTER
Project Title: House Renovation
Project Sponsor: Vurugonda, Vijay Kumar
Date Prepared: 5/21/2021
Project Manager: Vemuganti, Sai Saketh
Project Customer: Real Estate Broker
Sharma, Kamakshi & Davis Giovonni
Project Purpose:
Entire house must be painted, bedroom walls needed a re-insulation as the old have aged.
Kitchen needs a new countertop. Basement walls and foam insulation need to be painted with
fire-resistant chemical. Changing of bathroom tiles, tub and update the toilet fixtures.
High-Level Project Description:
•
•
•
Exterior and interior walls of the house need to be painted as its chipping of.
One of the bedroom walls will be reinsulated with foam as the old is resisting cold.
The present kitchen counter will be replaced with an epoxy countertop.
Sai Saketh received a notice from fire department regarding the fire-resistant paint
coat on the walls. Entire basement will be painted with fire resistant paint.
Project Boundaries:
The entire renovation must be completed in 25 days as Mr. Jones will be moving out of town.
• As the basement will be painted all the items need to be placed outside. There are
high chances of rain which might damage the items.
Key Deliverables:
•
•
•
•
•
•
Provide best quality renovation.
Implementing any day-to-day changes provided by Sai Saketh in course of
construction.
Making sure the bedroom walls are insulated perfectly so that it can resist cold
weather.
Replacing the counter with epoxy countertop which needs to be tough and resistant.
Re-arranging all the items when the work is done.
Completing the work on time.
1
High-Level Requirements:
•
•
•
•
Completing the work on time with use of more manpower.
Making sure basement meets the fire department guidelines.
Ensuring renovations are done to clients request and time.
Professionalism at the highest peak.
Overall Project Risk:
•
•
As the unit is situated on high altitude chances of rain and storm are higher. However,
as the work is carried out in spring the chances are less.
Any kind of injuries or personal health reasons of the workers will delay the project
as no heavy machinery involved.
Scope:
Summary Milestones
•
•
•
Selection of paint color, countertop
design.
Design approval from Sai Saketh for
the countertop.
Basement works.
Success Criteria
•
•
•
•
Viewing the site for better
understanding of the project
Finishing interior and exterior paint
work.
Pouring and fixing the countertop.
Items from basement needs to be rearranged.
Time:
25 days for the completion
Delivering finished product on or before
scheduled time.
Cost:
$25.000
Making sure the budget is not exceeded by
$5,000
2
Project Objectives
Due Date
Demolition of the bedroom interior walls for insulation.
Hardwood and Plasterboard works.
Painting interior and exterior.
Basement works
Fixing Kitchen countertop
Bathroom renovations
Rearranging the items in respective rooms
Final inspection
31/05/2021
03/06/2021
11/06/2021
18/06/2021
23/06/2021
29/06/2021
01/07/2021
02/07/2021
Preapproved Financial Resources:
Funds are being allocated by Vurugonda, Vijay Kumar for the House renovation, any
exceed in cost. Vemuganti, Sai Saketh will be informed prior the purchase or decision.
Stakeholders and Role:
Stakeholder(s)
Vemuganti, Sai Saketh
Charles Brown
May Williams
James Carpentry Co.
Vurugonda, Vijay Kumar
Role
Project manager (manages or overlooks
from start to finish)
Supply of labors.
Purchase of hardware items
Interior and exterior painting works
(Including Basement)
Countertop Purchase and fixing.
Project Exit Criteria:
Project must be completed in 25 days and needs to meet Sharma, Kamakshi expectations.
The basement must fall under fire department guidelines and bedroom wall needs to be
insulated perfectly, to mitigate future problems.
3
Project Manager Authority Level:
Staffing Decisions:
Project Manager Vemuganti, Sai Saketh is responsible for entire work from start to
finish. All the stakeholders will be reporting under PM for any decisions.
Budget Management and Variance:
The allocated budget for the build is $25,000. In case the budget is increasing by
$4,000 - $5,000 PM can take the decision. Any amount above the threshold limit
needs to be discussed and approved by Sharma, Kamakshi.
Technical Decisions:
PM and the contractors are responsible for the technical decisions to be made for the
project so that the project is on schedule
Conflict Resolution:
PM is solely responsible for any kind of issues or concerns raised by the team
members during the project.
Sponsor Authority:
House owners Mr. & Mrs. Mark and Vanessa Green will look over along with the
realtors Sharma, Kamakshi & Davis Giovonni for any kinds of approvals or changes
in project.
4
Approvals:
XXX
XXX
Project Manager Signature
Sponsor or Originator Signature
XXX
XXX
Project Manager Name
Sponsor or Originator Name
Date: 5/31/2021
Date: 7/2/2021
5
Project Title: House Renovation
Date Prepared: 5/1/2021
ID
Category
Assumption/Constraint
Responsible Party
Due Date
Actions
Status
1. .
Demolition
of the
bedroom
interior
walls for
insulation.
The demolition is to be
very precise and should
be done on time as it is
the initial step to
complete the project
Vemuganti, Sai
Saketh
5/31/2021
Check
whether the
demolition is
done safely
and on time
Pending
1. Click
here
to
Hardwood
enter and
text. Plasterboard
works.
Selection of the
hardwood and
arrangement of all
plasterboard works
before hand
May Williams
3/6/2021
Arranging and
selecting all
the hardwood
beforehand
and by choice
of the
customer
Pending
2. Click Painting
here interior and
to
exterior.
enter
text.
Selection on the colors
and the type of Paint to
be used.
James Carpentry Co.
6/18/2021
Including the
basement, the
paint should
be done on
time and the
color
Pending
6
combinations
should be
selected
beforehand
3. Click Fixing
here Kitchen
to
countertop
enter
text.
Purchasing and fixing of
the countertop should be
long lasting and keeping
in mind the precautions
in the kitchen
Vurugonda, Vijay
Kumar
6/23/2021
With the
choice of the
customer
buying the
material in
budget
4. Click
here
to
enter
text.
As rain is expected
throughout the process,
taking precautionary
measures so that the
project doesn’t lag
behind
Vemuganti, Sai Saketh
Till the
project is
completed
Taking into
Ongoing
consideration
all the external
factors like
shortage of
labor supply
or
unavailability
of the material
or
environmental
factors each
team should
have a backup
Timeline
not effected
by external
factors
Pending
7
GROUP LOG
ID
Category
Task
Date
Actions
Comments
1.
Sharma,
Kamakshi
Assumption log, Project
Manager Authority level,
Formatting
24-25th May 25,
2021
Making of
assumption log
taking reference
from Moodle
-
2.3
Vemuganti,
Sai Saketh
Assumption log, Project
Charter, formatting
23-24th May
2021
Collaborating with
Kamakshi and
discussing the
assumption log
-
3.
Vurugonda,
Vijay
Kumar
Project Charter, References,
Formatting
24-25th May
2021
Discussing the
charter while
consulting the
Moodle documents
submitted by the
Professor
-
8
4.
Davis
Giovonni
Title page, Index, Project
Charter, Formatting
23-25th May
2021
Making of the title
page and Index at
the end to get an
idea and finally
formatting the
whole assignment
-
9
References
Project Management Institute. (2017). A guide to the Project Management Body of Knowledge.
(PMBOK guide)
(6th ed.). Project Management Institute
https://moodle.cambriancollege.ca/pluginfile.php/1801995/mod_resource/content/0/1.1_PROJE
CT%20CHARTER%20Explained.pdf
https://moodle.cambriancollege.ca/pluginfile.php/1871094/mod_resource/content/0/1.2_ASSUM
PTION%20LOG%20Explained.pdf
10
Editable Version:
PRO JEC T MANAG EMENT PLAN
Project Title:Click here to enter text.
Date Prepared: Click here to enter a date.
Project Life Cycle:Click here to enter text.
Phase
Key Activities
Key Deliverables
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
How will you monitor
and
control?
Click
here
to enter text.
to text.
ClickWhat
here needs
to enter
happen before Phase
starts?
Click here
to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Same
Phases
as
Click here to enter text.
above.
Phase
Reviews
Entry Criteria
Exit Criteria
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
What are you
delivering
yourtext.
Click
here to to
enter
“Customer”?
Click here to enter text.
What has to be
completed to
Click here to enter text.
consider the Phase
Click here tocomplete?
enter text.
Click here to enter text.
Development Approaches:
Deliverable
Click here to enter text.
How are you going
Click here to enter text.
to deliver it?
Click here
to enter
text.
(Project
Charter)
(Project Charter)
Development Approach
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Subsidiary Management Plans:
Name
Read the introduction to each
here to enter text.
Knowledge Area in Click
PMBOK.
Summarize your approach here.
Click here to enter text.
Look at Book of Forms for more
ideas.
Comment
Scope
Time
Click here to enter text.
Cost
Click here to enter text.
Quality
Click here to enter text.
Resource
Click here to enter text.
Communications
Click here to enter text.
Risk
Click here to enter text.
Procurement
Click here to enter text.
Stakeholder
Click here to enter text.
Other Plans
Click here to enter text.
Variance Thresholds:
Scope Variance Threshold
Scope Baseline Management
Click here to enter text.
Ignore the “Variance
Thresholds and
baselines” Until next
class.
Schedule Variance Threshold
Schedule Baseline Management
Click here to enter text.
Click here to enter text.
Cost Variance Threshold
Cost Baseline Management
Click here to enter text.
Click here to enter text.
Baselines:Click here to enter text.
Attach all project baselines.