 What is the benefit of PERT/CPM? Give an example of how you have or could use PERT/CPM.

Jan 29th, 2015

Question:  What is the benefit of PERT/CPM? Give an example of how you have or could use PERT/CPM.

Answer:

Fundamentally, CPM (Critical Path Method) and PERT (Program Evaluation Review Technique) are undertaking administration strategies, which have been made out of the need of Western modern and military foundations to arrange, timetable and control complex undertakings.

The Framework for PERT and CPM
Basically, there are six steps which are basic to both the systems. The strategy is recorded underneath:

  1. Characterize the Project and every last bit of its critical exercises or undertakings. The Project (made up of a few errands) ought to have just a solitary begin action and a solitary completion movement.
  2. Create the connections among the exercises. Choose which exercises must go before and which must tail others.
  3. Draw the "System" joining all the exercises. Every Activity ought to have extraordinary occasion numbers. Sham bolts are utilized where needed to abstain from giving the same numbering to two exercises.
  4. Dole out time and/or expense evaluations to every action
  5. Process the longest time way through the system. This is known as the basic way.
  6. Utilize the Network to help arrangement, calendar, screen and control the venture. for more information please open me :)                                                  Please Best :)
Jan 29th, 2015

Are you studying on the go? Check out our FREE app and post questions on the fly!
Download on the
App Store
...
Jan 29th, 2015
...
Jan 29th, 2015
Dec 6th, 2016
check_circle
Mark as Final Answer
check_circle
Unmark as Final Answer
check_circle
Final Answer

Secure Information

Content will be erased after question is completed.

check_circle
Final Answer