Description
attached is the grading rubrics and the excel sheet. i flew a paper plane 30 times and recorded the data.
Unformatted Attachment Preview
Purchase answer to see full attachment
Explanation & Answer
Attached.
1
Running Head: STATISTICAL PROCESS CONTROL METHODS
Statistical Process Control Methods
Student’s Name
Institutional Affiliation
Submission Date
2
STATISTICAL PROCESS CONTROL METHODS
The control chart shows that this is a scenario that is out of control and is referred to as
Type I error or alpha risk. In this case, alpha risk has been used to outline has been used to
show how the frequency varies with the size of the bin. On the other hand, when the control
chart does not highlight the process in control, it is articulated as Type II error or beta risk.
Additionally, requesting for the process is in control when it is uncontrollable is referred to as
the beta risk. There are a number of myths indicating on utilizing SPC charts ...