FINC 423 Financial Models Final Exam
Cory Materials R&D department developed a new caulking compound for use in the residential
construction industry. The R&D department incurred $75,000 of expenses to develop the new
caulking compound. While Cory Materials sells other building materials, the caulking compound is a
new product for the company. Cory Materials intends to utilize an existing storage building that it
already owns, but leases to another firm for $50,000 per year. Cory Materials’ marketing manager
spent $25,000 on an industry study of the caulking market and expects to sell the product for a sixyear period, after which the R&D should have a different caulking product. At the end of year 6,
Cory Materials plans to liquidate the assets from the caulking compound in anticipation of a different
product. In addition to the facts and assumptions below, assume that working capital must be
invested immediately (in year 0) and will be fully recovered at the end of year 6. Note that the
difference between the selling price of the equipment at the end of year 6 and the equipment's book
value at the time of the liquidation is a taxable gain. Identify the relevant cash flows, then calculate
the investment’s net present value and internal rate of return, and MIRR.
Facts and assumptions
Initial cost of new equipment
Installation and shipping of equipment
Expected life of project (years)
Depreciation method (5 Year Equipment Class)
Selling (salvage) price of equipment at the end of year 6
Price per tube of caulking
Number of tubes that can be sold in year 1
Unit growth rate in tubes sold (after year 1)
Unit Cost per tube
Incremental fixed annual selling and administrative expenses
Tax rate
Working capital required (percent of sales at time 1 invested at time 0)
Minimum required rate of return (WACC)
Base
$450,000
$50,000
6
MACRS
$120,000
$5.00
100,000
2%
$2.00
$100,000
20%
15%
10%
Compute NPV, IRR, and MIRR to decide if Corry Materials should add the new
caulking compound to its product lineup of building materials.
1. Build your financial model to solve the above problem. Make sure you consider color
scheme, design layout, and documentation. Your model is being evaluated on its user
functionality as well as correct calculations. Your model structure should be similar to the
Freshly Frozen Fish example from class with an input section, project capital
requirements section, pro forma income statement section, cash flows section, and finally
Fall21
a results section. This is to be your own work as this is an EXAM, not a group
assignment.
2. Sensitivity Analysis
Use a data table to compute the sensitivity of the NPV and MIRR to a change in unit price from
$4.00 - $6.00.
Use a data table to compute the sensitivity of the NPV and MIRR to a change in the total
installed equipment cost from $400,000 - $600,000.
3. Scenario Analysis
Run the Scenario Manager for the following cases:
Facts and assumptions
Initial cost of new equipment
Installation and shipping of equipment
Expected life of equipment (years)
Depreciation method
Selling price of new equipment at the end of year 6
Unit Price
Units
Unit growth rate (after year 1)
Unit Cost
Incremental fixed annual selling and administrative expenses
To compute the NPV, IRR, MIRR for each case.
Finally, you need to create an organized output Tab.
4. Dashboard
Fall21
$
Base
Best
Worst
$450,000 $350,000 $550,000
$50,000
6
MACRS
$120,000 $150,000 $100,000
$5.00
$6.00
$4.00
100,000
150,000
75,000
2%
5%
0%
$2.00
$1.50
$2.50
100,000 $ 80,000 $ 120,000
Create a dashboard to analyze the project results
a.
b.
c.
d.
e.
f.
Include the scenario manager summary table (with range names not cell numbers)
Include a column graph for NPV of each case scenario
Include a column graph for IRR of each case scenario
Include a scatter graph for the NPV as the unit price changes from $4 to $6.
Include a scatter graph for the IRR as the unit price changes from $4 to $6.
Include a scatter graph for the NPV as the total installed new equipment cost changes
from $400,000 – 600,000.
g. Include a scatter graph for the IRR as the new equipment cost changes from $400,000 –
600,000.
5. Due Uploaded to Blackboard by 11:59pm on 12/15/21
BONUS (7 Extra Points Possible)
What do you do with all the information that you have computed for this project? What is your
recommendation? There are three potential solutions that you could recommend. Choose your
recommendation/request (you can only choose 1!) and support it with the data from the problem
or results from your model.
1. You recommend that Cory Materials should add the new caulking compound to its
product lineup of building materials. Why? Support your solution with the data from the
problem or results from your model. If you could only choose 1, what graphic from the
Dashboard would you choose to put on a PowerPoint slide to justify your
recommendation? Why?
2. You recommend that Cory Materials should NOT add the new caulking compound to its
product lineup of building materials. Why? Support your solution with the data from the
problem or results from your model. If you could only choose 1, what graphic from the
Dashboard would you choose to put on a PowerPoint slide to justify your
recommendation? Why?
3. You respectively request that Cory Materials provide you additional information to
further your analysis. Why? What additional information would you request and support
your request with the data from the problem or results from your model. If you could
only choose 1, what graphic from the Dashboard would you choose to put on a
PowerPoint slide to justify your request for additional information? Why?
Fall21
A
1
B
C
D
E
F
G
Year 4
Year 5
Frozen Catfish Fillet Project Inputs
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Cost of Land
Cost of Buildings & Equipment
MACRS Class
Life of Project (Years)
Terminal Value of Land
Terminal Value of Buildings & Equipment
First Year Catfish Sales (lbs)
Price per Pound
Unit Sales Growth Rate
Variable Costs as % of Sales
Fixed Costs
Tax Rate
WACC
250,000
400,000
20
5
350,000
200,000
200,000
2.50
8%
60%
80,000
25%
10%
16
17
18
19
20
21
22
23
24
25
Investments Schedule for Frozen Catfish Fillet Project
Year 0
Year 1
Year 2
Year 3
Investment in Plant/Equipment
MACRS
Depreciation
Book Value
Salvage Value
Tax on Salvage
Net Salvage
26 Net Investment in Fixed Assets
27
28 Investment in Net Working Capital
Chapter 12-13
Capital Budgeting Under Risk
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be
scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
What is Capital Budgeting?
• Capital budgeting is the term used to describe the process of determining
how a firm should allocate scarce capital resources to available long-term
investment opportunities
• Because the goal of the firm is to maximize shareholder’s wealth, managers
are responsible for selecting only those investments that are expected to
increase shareholder wealth
• Ultimately, we will be concerned with the comparison of costs versus benefits
• The benefits are the cash flows provided by the investment, and the cost is
the amount spent to acquire it (all in present value terms)
• Only projects where the benefit equals or exceeds the cost should be
accepted
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Making the Decision
• Once the relevant cash flows have been determined, it is time to calculate
the profitability measures
• There are six commonly used profitability measures:
• Net Present Value
• Internal Rate of Return
• Modified Internal Rate of Return
• Payback Period
• Discounted Payback Period
• Profitability Index
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Net Present Value (NPV)
• The NPV is a direct comparison of the benefit of the project with its cost
• It is calculated as:
N
CFt
− IO = Benifit − Cost
t
t =1 (1 + WACC )
NPV =
• Excel has an NPV function, but beware that it actually calculates the present value
of uneven cash flows, not the net present value (so, use it to calculate the first term
above, and then subtract the IO)
• The project should be accepted if NPV ≥ 0
• If NPV = 0 the project will earn exactly its WACC and the shareholders of the firm will be
satisfied
• If NPV > 0 then the project will earn more than its WACC
• If NPV 1then the project will earn more than its WACC
• If PI < 1 then the project will earn less than its WACC and shareholder wealth will
decline, so the project would be rejected
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Optimal Capital Budget
• Optimal Capital Budget Without Capital Rationing
• The projects are listed in Table 12-6.
• Sort & Filter
• Enter the data from Table 12-6 into your RMM worksheet beginning with the labels in
A22:C22. The cumulative cost can be calculated by entering: =SUM(A$23:A23) into
B23 and then copying the formula to the other cells. The first step in determining the
optimal capital budget is to sort all of the projects by their IRR. Select A22:C32 and
click the Sort & Filter button on the Home tab. Because we want to sort based on the
third column (instead of the first column, which is the default), we need to choose
Custom Sort from the menu. Choose IRR from the “Sort by” list and Largest to Smallest in the Order list. This sorted list of IRRs is known as the Investment Opportunity
Schedule (IOS).
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Optimal Capital Budget Without Capital
Rationing
Sorted Investment Opportunity Schedule
Cost
Cumulative Cost
407,769
407,769
396,209
803,978
439,207
1,243,185
271,477
1,514,662
445,529
1,960,191
189,921
2,150,112
74,950
2,225,062
146,661
2,371,723
201,843
2,573,566
138,298
2,711,864
Optimal Capital Budget is where MCC and
IOS intersect
IRR
16.51%
16.16%
15.87%
15.38%
15.02%
13.82%
13.00%
12.19%
11.69%
11.48%
As was shown on page 361, we can make the IOS line into a step function. The process is exactly
the same as before in Chapter 11: We must add additional data points for the cumulative cost and
IRR, so that we have two points at each change in the IRR.
Monczka/Handfield/Giunipero/Patterson, Purchasing & Supply Chain Management, 6th Edition. © 2016 Cengage. All Rights
Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Optimal Capital Budget
• Optimal Capital Budget Under Capital Rationing
• Let’s look at an example
• Because of declining demand for high-pressure frammis valves, the Frammis Valve
Corporation of America (FVCA) is considering expanding into a number of other
businesses. The managers of FVCA have determined that it has 13 potential new
investments (see Exhibit 12-10). The total cost of these investments would be
$7,611,990, but they are limited to a maximum total investment of only $3,000,000.
Your job is to determine the combination of the projects the company should choose.
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Optimal Capital Budget Under Capital Rationing
The Optimal Capital Budget
Under Capital Rationing
Project
Cost
NPV
Include
A
237,005
84,334
1
B
766,496
26,881
1
C
304,049
23,162
1
D
565,178
82,598
1
E
108,990
20,590
1
F
89,135
90,404
1
G
795,664
18,163
1
H
814,493
97,682
1
I
480,321
52,063
1
J
826,610
53,911
1
K
734,830
56,323
1
L
910,598
88,349
1
M
978,621
69,352
1
Total
7,611,990
763,812
13
Constraint 3,000,000
Because each project will either be selected or not, this is
a perfect use for a binary variable. A binary variable can
take on one of two values, most commonly 0 or 1. We will
set up a column with 0s and 1s, where 1 indicates that a
project is selected, and 0 indicates rejection. Because each
project will either be selected or not, this is a perfect use
for a binary variable. A binary variable can take on one of
two values, most commonly 0 or 1. We will set up a
column with 0s and 1s, where 1 indicates that a project is
selected, and 0 indicates rejection.
Due to nature of problem, we need to use sumproduct
function since some projects cannot be accepted
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Optimal Capital Budget Under Capital Rationing
• To restate the problem, we want to maximize the total NPV in C17 by changing the
cells in D4:D16 subject to two constraints. The first constraint is that the total cost, in
B17, must be less than or equal to 3,000,000. Next we must constrain the values in
D4:D16 to be either 0 or 1, but they cannot take on any noninteger values (i.e., they
must be binary values).Launch the Solver from the Analysis group on the Data tab
• If you don’t see the Solver button, then you need to activate the Solver add-in. Click
the File tab and then click Options. You can activate Solver from the Add-Ins section.
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Excel Solver
•
•
•
•
•
•
Objective Cell
MAX, MIN, or Value
Cells to Change
Constraints (ADD)
Non-Negative
Solving Method
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Optimal Solution 12-11
The Optimal Capital Budget
Under Capital Rationing
Project
Cost
NPV
Include
A
237,005
84,334
1
B
766,496
26,881
0
C
304,049
23,162
1
D
565,178
82,598
1
E
108,990
20,590
0
F
89,135
90,404
1
G
795,664
18,163
0
H
814,493
97,682
1
I
480,321
52,063
0
J
826,610
53,911
0
K
734,830
56,323
0
L
910,598
88,349
1
M
978,621
69,352
0
Total
2,920,458
466,529
6
Constraint 3,000,000
Selected
A
C
D
F
H
L
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Relevant and Irrelevant Cash Flows
• In order to be considered relevant for capital budgeting, the cash flows must be:
• Incremental – That is, over and above any cash flows that the firm already has-think
new project cash flows minus existing cash flows
• After-tax – Shareholders are not concerned with before-tax cash flows because they
can’t be reinvested or paid out as dividends until the taxes have been paid
• The cash flows must not be:
• Sunk costs - These are cash flows that have occurred in the past and cannot be
recovered regardless of the investment decision, so they cannot affect our decision
• Additional financing costs – While financing costs are relevant to the decision, we
don’t want to count them as cash flows because we will account for them when
discounting the cash flows at the WACC (i.e., we don’t want to double count financing
costs as that would unnecessarily penalize the project)
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows
• The image at right shows the three types of cash
flows that we are concerned with:
• Initial Outlay (IO) – The net, upfront nonoperating cash
flows required to acquire the project
• Annual After-Tax Cash Flows (ATCF) – The annual
operating cash flows that the project will provide after
taxes
• Terminal Cash Flow (TCF) – The nonoperating cash
flows associated with the end of the life of the project
• Note that the ATCF will occur each year during the
life of the project (it will generally be different each
year), while the IO and TCF each occur only once
• With these Cash Flows and the WACC,
we can compute the NPV and make the
project decision
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows
• Relevant Cash Flows are incremental FREE CASH FLOWS
• Free Cash Flow Model
• Free Cash Flow = Operating Cash Flow – Change in Operating Assets
•
•
•
•
Recall define after-tax operating cash flow as:
After-Tax Operating Cash Flow = NOPAT + Noncash Expenses
NOPAT = EBIT(1-tax rate)
The most significant Noncash Expense is Depreciation, so
• After-Tax Operating Cash Flow = EBIT(1-tax rate) + Depreciation
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Free Cash Flow Model
• The required investment in operating assets:
• Change in Operating Assets = Change in NOWC + Change in Operating Fixed Assets
• where NOWC is net operating working capital.
• A simplification (for our purposes) is to use NWC ~ NOWC and change in operating assets ~
net capital expenditures.
• Change in Operating Assets = Change in NWC + Net Capital Expenditures
• Free Cash Flow = Operating Cash Flow – Change in Operating Assets
• Free Cash Flow = EBIT(1-tax rate) + Depreciation – Change in NWC –Net Capital
Expenditures
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Free Cash Flow Model
• Free Cash Flow = EBIT(1-tax rate) + Depreciation – Change in NWC –Net
Capital Expenditures
• To determine the operating cash flow, we usually generate a pro forma income
statement with incremental operating cash flows
• To determine the change in operating fixed assets, we generate a portion of a pro
forma balance sheet
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows IO
• Let’s apply the Free Cash Flow Model to the project timeline
•
• Initial Outlay (I O) – The net, upfront nonoperating cash flows required to acquire the project
• Note that at time 0 there is no operating cash flow;
• Thus the free cash flow at time 0, the IO equals
• IO = - (Change in NWC + Net Capital Expenditures)
• The sign on IO is usually negative as this is an investment
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows IO
Initial Outlay (IO) – The net, upfront nonoperating cash flows required to acquire the project
• The following is a rough guideline as to how to calculate the IO cash flow
IO = - [ΔNWC + Price of Project Equipment/Buildings + Shipping + Installation + Training −
(Salvage Value − Taxes on Salvage) of existing equipment]
• Note that Shipping, Installation, and Training are relevant cash flows
• Note that every project is different, and the formula is a guide to possible components of the initial
outlay
• For “new” projects there are no “existing” cash flows so there is no net salvage value of existing
equipment
• For “replacement” projects we must consider net salvage value of existing equipment (we will
discuss the details of net salvage value later)
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows ATCF
• Let’s apply the Free Cash Flow Model to the project timeline
•
• Annual After-Tax Cash Flows (ATCF) – The annual operating cash flows
that the project will provide after taxes
• Usually there is no additional annual required investment in operating assets during the operating
period of the project ;
• Thus the free cash flow during the operating period of the project (assuming no additional annual
required investment in operating assets) simplifies to
• ATCF = EBIT(1-tax rate) + Depreciation
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows ATCF
• Annual After-Tax Cash Flows (ATCF) – The annual operating cash flows
that the project will provide after taxes
• Incremental ATCF = incremental EBIT(1-tax rate) + incremental Depreciation
• The sign on ATCF is usually positive as these are usually inflows. Some exceptions are projects
when we have to select the “best” negative project.
• We will always generate a pro forma income statement in this class, but the following is a rough
guideline formula
• ATCF = (ΔRevenues − ΔNet Expenses − ΔDepreciation) × (1 − tax rate) + ΔDepreciation
• Again for “new” projects, there is no existing cash flow. For “replacement” projects we must
consider the existing cash flow
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows TCF
• Let’s apply the Free Cash Flow Model to the project timeline
•
•Terminal Cash Flow (TCF) – The nonoperating cash flows
associated with the end of the life of the project
• Since we are accounting for the nonoperating cash flows associated with the end of the life of the
project the free cash flow at the end of the life of the project simplifies to
TCF = ( NOWC ) − (Shut-down Expenses (1 − tax rate)) + Salvage Value − Taxes on Salvage of New Machine
• The sign on TCF is usually positive since we are recovering (sell) the investment
in Net Working Capital and recovering (sell) some of the investment in capital by
Salvage
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Calculating the Relevant Cash Flows TCF
•
Terminal Cash Flow (TCF) – The nonoperating cash flows
associated with the end of the life of the project
• Some typical assumptions regarding the terminal cash flow
• Although we almost always assume zero salvage value for Depreciation Calculation purposes,
generally we assume some positive salvage value for the equipment at the end of the project.
• Since taxes are a relevant cash flow, we estimate the taxes on salvage for the equipment (we will
discuss the details of taxes on salvage later)
• The typical assumption is that the company will recover (liquidate and sell) ALL of the net working
capital that was invested over the project life. Most analysts will simply estimate the initial
investment in net working capital (a negative cash flow for IO) and then recover that investment at
the end of the project (a positive cash flow for TCF)
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Freshly Frozen Fish Company Example
The Freshly Frozen Fish Company currently markets frozen fish fillets and other
related products. While seeking expansion ideas, the company decided to look
into the possibility of a line of frozen cat-fish fillets. Entry into this business
would require the purchase of an existing 80-acre catfish farm in western
Alabama at a cost of $250,000 for the land and $400,000 for the buildings and
equipment. The buildings and equipment will be depreciated using MACRS with
a class life of 20 years. At the end of the five years, management anticipates that
the farm will be sold for $550,000 ($350,000 for the land and $200,000 for the
buildings and equipment).The marketing department estimates that the firm will
be able to sell 200,000 pounds of fillets at an average wholesale price of $2.50 per
pound during the first year. Unit demand is expected to grow at a rate of 8%
annually thereafter. Variable operating expenses are expected to average 60% of
gross sales, and fixed costs (not including depreciation) will be $80,000 per year.
The company’s marginal tax rate is 25% and its WACC is 10%.
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Freshly Frozen Fish Company Example
Frozen Catfish Fillet Project Inputs
Cost of Land
250,000
Cost of Buildings & Equipment
400,000
MACRS Class
20
Life of Project (Years)
5
Terminal Value of Land
350,000
Terminal Value of Buildings & Equipment
200,000
First Year Catfish Sales (lbs)
200,000 x
Price per Pound
2.50 x
Unit Sales Growth Rate
8%
Variable Costs as % of Sales
60% x
Fixed Costs
80,000
Tax Rate
25%
WACC
10%
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Freshly Frozen Fish Company Example IO
• IO Cash Flow
• IO = - [ΔNWC + Price of Project Equipment/Buildings + Shipping +
Installation + Training − (Salvage Value − Taxes on Salvage) of existing
equipment]
• The project is a “new” so there is no existing equipment
• For this simplified example there is no Shipping, Installation, Training, or
investment in working capital
• IO = - ( Cost of Project Equipment/Buildings + Land)
Timothy R. Mayes, Financial Analysis with Microsoft Excel, 9th Edition. © 2021 Cengage. All Rights Reserved. May not be scanned,
copied or duplicated, or posted to a publicly accessible website, in whole or in part.
The Freshly Frozen Fish Company Example ATCF
• ATCF Cash Flow
• ATCF = EBIT(1-tax rate) + Depreciation
• The project is a “new” so there are no existing cash flows
• For this project, we must compute the depreciation using MACRS
• MACRS uses IRS tables for the allowable depreciation expense period (Class Life)
based on the type of asset
• MACRS depreciates to a terminal value of zero (and this assumption is usually used
for Straight Line Depreciation as well)
• Class Life
Purchase answer to see full
attachment