CPMGT303 Phoenix JP Phentar Construction Management Case Study Paper

User Generated

whfoaq14

Business Finance

CPMGT303

University of Phoenix

Description

Resource: A Comprehensive Guide to Project Management Schedule and Cost Control, Ch. 11

Review the JP Phentar Construction: Case Study in Ch. 11.

Complete the following:

  • Determine what information-gathering tools would be most effective on this project and what activities would need to be monitored.
  • Based on data that would be generated from work activities, what types of analytical tools could be used to determine project status?
  • Can any corrective actions be initiated? And if so, how?

Answer the questions in a 1,050- to 1,400-word paper.

Format your paper consistent with APA guidelines.

Click the Assignment Files tab to submit your assignment.

Include Introduction, Conclusion, and resources

please use the info below as your resource.

*******************************************************************************************************************************************************************

Applications Exercise

JP Phentar Construction: Case Study JP Phentar has owned and operated his construction company for 27 years and is currently interested in building a custom home for his own family. Phentar Construction has specialized in large and exotic custom homes built in areas that present challenges, such as heavily wooded and rocky terrain, hillsides, and sandy beach sites. Phentar Construction has built large custom homes for executives, heads of state, and movie stars around the world; those projects generally include interesting and challenging amenities for construction companies to manage in the course of building homes. Phentar is pulling out all the stops on this construction project to include things in his own home that his family can enjoy although they are typically out of the norm for most family residences. Phentar has purchased three acres of foothill terrain that include several large rock outcroppings that have to be removed for the construction of an 8,500 square foot six-bedroom, six-bathroom home. This home will also include an elaborate game room with professional pool table and arcade games, a large family room with rock fireplace, and a fully functional home theater room with large-screen TV and surround sound and theater seating. The home will also feature as its primary centerpiece a 35,000-gallon saltwater fish tank that will start at the main floor in the center of the house and extend for two stories to the ceiling. This fish tank will include a large rock wall covered with all manner of coral and sea urchins, flowing water movement, and it will be stocked with an elaborate display of tropical fish. The exterior of the home will include a large pool with spa and a covered patio with full outdoor kitchen, including a fully functional brick fire oven. Because Phentar has built homes with similar amenities in the past, he knows all too well several of the contractors required to outfit these types of amenities can present challenges in cost estimation, level of quality, and ability to stay on schedule. Concerns with this particular project lie within clearing the initial acreage of large rock, and specialized amenities such as the game room, theater room, and fish tank that can present challenges during the scheduling of these activities in the course of building the home. There can be serious issues in the timing of these activities because they can affect other areas of the home during construction. Phentar is confident this project can be completed if proper project management tools and techniques are implemented to monitor and control critical activities through the course of this project life cycle.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Running Head: REVIEW QUESTIONS PAPER

Review Questions Paper
Name
Course
Instructor
Date

1

REVIEW QUESTIONS PAPER

2

Introduction
Project management is the application and use of the appropriate knowledge, skills, tools
as well as techniques to the project activities with the aim of meeting or exceeding the various
needs and expectations of the project. JP Phentar Construction project should also expect the
continual trade-offs, and it will be the responsibility of the company’s managers to manage these
trade-offs. Nevertheless, the efficient project management cycle will ensure some appropriate
tools and techniques will ensure that the project metrics, as well as the projected trade, offs such
as scope versus time, cost versus quality together with the different needs and expectations, are
met or achieved. Besides, it will also be necessary to monitor different and essential activities to
avoid being caught off-guard by the various risks and eventualities in the execution and
completion of the project. Deployment of useful analytical tools and techniques in measuring the
status from the data which are generated from the activities of the project will also be essential in
ensuring the success of the project. Upon the analysis and examination of the progress of the
project, it will be necessary if the management takes appropriate corrective actions based on the
recommendation of the project manager and the available engineers. The successful fulfillment
of a project depends on the useful t...