SIU Business Contingency Plan and Disaster Recovery Plan Essay

User Generated

Guhaqrefgebz

Engineering

Schiller International University

Description

Pick an industry/company to focus on for this assignment. Based upon the given information you can find on the company and any past issues/breaches the company has gone through, create a Disaster Recovery plan using the template provided. Project selection is submitted for approval and an outline is to be provided showing which sections for the DR plan each group member is responsible for.

Unformatted Attachment Preview

INFORMATION TECHNOLOGY DISASTER RECOVERY PLAN Revision History Revision Change Date Official copies of the document are available at the following locations:   Department of Information Technology Office Office and home of the Chief Information Officer 1 Contents Revision History..............................................................................................................................................1 Official copies of the document are available at the following locations:......................................................1 Contents...........................................................................................................................................................2 Section 1: Introduction....................................................................................................................................3 Section 2: Scope..............................................................................................................................................3 Section 3: Assumptions...................................................................................................................................3 Section 4: Definitions......................................................................................................................................3 Section 5: Teams..............................................................................................................................................3 5.0.1 Incident Commander...................................................................................................................3 5.0.2 Incident Command Team............................................................................................................3 5.1 Datacenter Recovery Team................................................................................................................3 5.2 Desktop, Lab, and Classroom Recovery Team..................................................................................4 5.3 Enterprise Systems Recovery Team...................................................................................................4 5.4 Infrastructure and Web Recovery Team............................................................................................4 5.5 Telecommunications, Network, and Internet Services Recovery Team............................................4 Section 6: Recovery Preparations....................................................................................................................5 6.1 Data Recovery Information:...............................................................................................................5 6.2 Central Datacenter and Server Recovery Information:......................................................................5 6.3 Network and Telecommunication Recovery Information:.................................................................5 6.4 Application Recovery Information:...................................................................................................5 6.5 Desktop Equipment Recovery Information:......................................................................................5 Section 7: Disaster Recovery Processes and Procedures.................................................................................5 7.1 Emergency Response:........................................................................................................................5 7.2 Incident Command Team:..................................................................................................................5 7.3 Disaster Recovery Teams:..................................................................................................................5 7.4 General System/Application Recovery Procedures/Outline:.............................................................5 8.0 Network & Telecommunication Recovery Guidelines:............................................................................7 Appendix A. IT Contact List...........................................................................................................................7 Appendix B. Crisis Management Team Contact List......................................................................................7 Appendix C: IT Recovery Priority List...........................................................................................................7 C.1 IT Infrastructure Priorities:.................................................................................................................7 C.2 IT System Priorities:...........................................................................................................................8 C.3 Consortium, Outsourced, and Cloud-based IT System Priorities:.....................................................8 C.4 IT Facility Priorities...........................................................................................................................9 Appendix D: Vendor Information...................................................................................................................9 Appendix E: Disaster Recovery Signoff Sheet..............................................................................................10 2 Section 1: Introduction Provide an introduction to the company/situation... A copy of this plan is stored in the following areas: • Department of Information Technology Office • Office and home of the Chief Information Officer Section 2: Scope Determine/explain the scope of this plan. Section 3: Assumptions Section 4: Definitions Section 5: Teams 5.0.1 Incident Commander Chief Information Officer Home Phone: Cell Phone: 5.0.2 Incident Command Team Chief Information Officer Manager, User Support Manager, Infrastructure Services Manager, Information Systems Manager, Classroom and Media Services 5.1 Datacenter Recovery Team All Contact Information is located in Appendix A 3 Team Lead: Team Members: Manager, Infrastructure Services System Administrators (2) Desktop Systems Administrator Network Communications Technicians (2) 5.2 Desktop, Lab, and Classroom Recovery Team All Contact Information is located in Appendix A Commander. Team Lead: Team Members: Manager, User Services Manager, Classroom and Media Services Desktop Systems Administrator Computing Coordinators (7) Lab and Student Computing Coordinator Equipment Systems Specialist 5.3 Enterprise Systems Recovery Team All Contact Information is located in Appendix A Team Lead: Team Members: Manager, Information Systems Manager, Infrastructure Services Programmer/Analysts (4) Web Programmer/Analyst System Administrator Computing Coordinators supporting affected areas (business services, payroll, enrollment services, etc.) Key Business Unit Personnel as needed by type of incident (payroll clerk, accountant, registrar, etc.) 5.4 Infrastructure and Web Recovery Team All Contact Information is located in Appendix A Commander. Team Lead: Team Members: Manager, Infrastructure Services System Administrators (2) Desktop Systems Administrator Web Programmer/Analyst 5.5 Telecommunications, Network, and Internet Services Recovery Team All Contact Information is located in Appendix A Commander. Team Lead: Manager, Infrastructure Services 4 Team Members: Communications Technicians (2) System Administrator Section 6: Recovery Preparations 6.1 Data Recovery Information: 6.2 Central Datacenter and Server Recovery Information: 6.3 Network and Telecommunication Recovery Information: 6.4 Application Recovery Information: 6.5 Desktop Equipment Recovery Information: Section 7: Disaster Recovery Processes and Procedures 7.1 Emergency Response: 7.2 Incident Command Team: 7.3 Disaster Recovery Teams: 7.4 General System/Application Recovery Procedures/Outline: 8.0 Network & Telecommunication Recovery Guidelines: Appendix A. IT Contact List Appendix B. Crisis Management Team Contact List Appendix C: IT Recovery Priority List The following priorities have been established by the department of Information Technology with consultation from the campus community. C.1 IT Infrastructure Priorities: 5 C.2 IT System Priorities: C.3 Consortium, Outsourced, and Cloud-based IT System Priorities: Application/System Name Priority RTO RPO (1) (2) (3) (4) (5) Critical – Basic infrastructure and must be restored as soon as possible. High – Systems of extreme importance, but do not provide infrastructure. Medium – Important systems and applications, but do not have university-wide impact. Low – Systems important to specific departments or specific small populations of users. Full –Systems that may not be restored to functional status until normal operations are reestablished. Note: RTO is recovery time objective, RPO is recovery point objective 6 C.4 IT Facility Priorities Building Name Priority Note: building list continues on next page. (1) Critical, needed for maintenance of public health and safety, communications. (2) High, needed for income maintenance for students, employees; payments to vendors; requirements for compliance or regulation; effect on cash flow; effect on production and delivery of services (housing, dining, student services). (3) Medium, needed for mission of university, delivery of classes. (4) Low, everything else Appendix D: Vendor Information 7 Appendix E: Disaster Recovery Signoff Sheet I have been briefed and given an overview of the Disaster Recovery Plan and I am familiar with my responsibilities. Name Signature Date 8
Purchase answer to see full attachment
Explanation & Answer:
20 Pages
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Please view explanation and answer below.

1

Business contingency plan & disaster recovery plan

Your name
Instructor’s name
Course
Date of submission

2

Business contingency plan & disaster recovery plan
Section 3: Assumptions

The Automobile Industry Company: Tesla is an American company dealing with electric
vehicles and clean energy. The company designs and manufactures electric cars, battery energy
storage generated from home to grid-scale, solar panels and roof tiles, and related products and
services (Prabantoro & Aji, 2021). The company has adopted the business contingency plan
and disaster recovery plans. This will aid in fulfilling its assumptions of ensuring that its business
continues even during and after the disaster. This assumption will help the company to continue
generating huge sales from battery electric vehicles and vehicles.

The other assumption is that the company will develop, build, and equip a newly
established assembly line, which will boost production. This assumption is projected to occur
within the stipulated time and projected costs; thus, this will improve business continuity even
after a disaster. The other assumption is to finish the designs and the engineering plans
effectively and ensure delivery of the various designs is achieved within the stipulated timeline;
thus, this is an effective way to boost the production of the company and also to have some
contingency plans which can aid overcoming any duress or interruption that may occur during
the business operation. The other assumptions made by the company are to offer job
opportunities to recruit, hire and train qualified professionals. This is an effective way to aid in
increasing the production level and help in producing quality products and services, which will
aid in encountering the interruption that may arise during the operation of the business. The last
assumption is that the company focuses on establishing an online Gigafactory which will boost
production and aid in offering the products on time to its customers.

3

6.4 Application Recovery Information
The company has adopted a recovery plan from utilizing fuel consumption. The company
has adopted the utilization of electric vehicles due to the development of the full power and
transportation ecosystem from solar generation and energy storage (Sawalha, 2021). This plan
aids in minimizing the carbon dioxide emission to the air, which is a recovery plan to avoid
unnecessary costs contributed by the fuel-driven vehicles' substantial maintenance costs. Electric
vehicles offer better performance, comfort, and speed, making them more effective in
overcoming interruptions during operations.
Electric vehicles aid in saving energy costs which have been the central issue in the
regular maintenance of these vehicles. Thus, these vehicles have aided in boosting efficiency,
performance, and reliability, which have helped the company meet its targets and satisfy the
customers' needs by offering them quality and affordable products. This recovery information
has been at the forefront in helping the company maintain the ecosystem, which thus has aided
adequately in protecting the environment. Hence, this ensures that there is a proper and favorable
environment for undertaking the environment where production costs will be lowered.
The technology adopted by Automobile Industry Company-Tesla in the production of
electric vehicles has been recovering information. It has aided in achieving a competitive
advantage against the other automobile companies. Thus this ha...


Anonymous
Great content here. Definitely a returning customer.

Studypool
4.7
Indeed
4.5
Sitejabber
4.4

Related Tags