Competency

Evaluate the concepts of work breakdown structure, coding, forecasting, and scheduling as project control functions.

Scenario Information

You are assuming the role of the project manager for a company called SuperPacks to provide a new backpack product with a built-in refrigeration pouch and radio module. Your customer for this project is the U.S. Army, Ground Forces and Special Operations. As the project manager for your team, you will be submitting to your manager a project management report.

Instructions

As the Project Manager, your manager has asked you to prepare a report on unplanned events that have occurred. You have been asked to present this report to a group of managers, and should discuss your course of action for two unplanned events (below) that have occurred for SuperPacks. You will need to analyze the impact of these events in your project management report as a presentation; this can be PowerPoint, Prezi, or any presentation tool. Make sure you address the following questions in your presentation as you will be giving it to the management team.

Discuss your analysis on the following events:

  1. It is discovered the refrigerated module is too large for the designed refrigerated backpack pouch. What is your course of action?
  2. The subcontractor assigned to build the radio module for the backpack has shut down. What is your course of action?
  3. Discuss four areas affected by these unexpected events. Three of the areas of the project affected by the events should include changes to budget, human capital, and impact to schedule. Identify one additional area affected by these events.

For this assignment please include notes on each slide with in-text citation. The last slide should be the list of references in APA format.

Final Answer

All set. Thank you

UNEXPECTED EVENTS
Your Name
University

Date

Project Manager
for SuperPacks

New backpack
product with builtin refrigeration
pouch and radio
module

Customer:

U.S. Army, Ground
Forces, and
Special Operations

CASE 1: INFORMATION

Project
Management
Report

CASE 1:
REFRIGERATED
MODULE TOO
LARGE FOR
POUCH



Significantly affects four aspects of
project planning and
implementation


Budgeting



Waste of Human Capital



Scheduling



Time



Previous resources wasted concerning...

Mrr426 (397)
UT Austin

Anonymous
I was on a very tight deadline but thanks to Studypool I was able to deliver my assignment on time.

Anonymous
The tutor was pretty knowledgeable, efficient and polite. Great service!

Anonymous
Heard about Studypool for a while and finally tried it. Glad I did caus this was really helpful.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4
Similar Questions
Related Tags

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors