University of the Cumberlands Agile Framework Discussion

User Generated

uneqvx42852000

Business Finance

University of the Cumberlands

Description

Activity 3

Part 1
Your author notes on page 117:  "in the complex project landscape effective integration requires management approaches that allow for a flexible creative and adaptive approach by the project team in response to the changing characteristics of the project, organization, and cultural environment and the dynamics of the organization".  This week you learned about process groups used in the project management lifecycle.  In your experience, are all these deliverables necessary?  Provide two deliverables that all projects, regardless of methodology, should leverage and two deliverables that may not be necessary and why? 

Part 2:

Choose an Agile framework and a project that can be completed using the Agile framework and answer the following:

  1. Describe the model to include a pictorial review of the process
  2. Describe the project
  3. Why do you feel this model is better for this type of project?
  4. What would be the impact of completing the project using a different approach? 

Assignment Requirements:

  1. The assignment is to answer the question provided above in essay form.
  2. Where applicable, students can include diagrams if it will help provide a pictorial view of the solution.   
  3. This is to be in narrative form and should be as thorough as possible.
  4. Bullet points should not be used. 
  5. The paper should be at least 3-4 pages in length.
  6. Times New Roman 12-pt font, double-spaced, 1-inch margins
  7. Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
  8. Do not insert excess line spacing.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

View attached explanation and answer. Let me know if you have any questions.

I.

APA tittle Page
A. Agile Framework

I.

Main Body

#1
Scrum is often used to enable teams to learn from their own experiences and selforganization while working to solve a specific challenge.
Scrum is designed to help teams automatically respond to changing conditions and
customer demands, with built-in reprioritization and quick deployment timelines to keep your
team learning and growing.
#2
When it comes to producing a software program or software engineering, the agile
scrum approach is best used for the project.
#3
The agile scrum structure is ideal for this project since the project is not produced all
at once but rather incrementally in each stage. I feel that the scrum framework can easily
handle the building of a restaurant in any location or area since the process works out
properly with unwaveringly fantastic collaboration.
Scrum introduces synchronization mechanisms that connect the owner's demands with
the reality of the design he or she desires, including material quality, sizes, and quantity.
#4
If a different method were used to finish this project, the results and influence on the
whole project would be different. Due to the uniqueness in team-building aspects that the

AGILE FRAMEWORK
scrum framework provides, a different strategy can create efficiency, but not as great as the
scrum framework.
An agile approach would be more beneficial to businesses given the dynamic nature
of today's firms, where changes happen at a quick speed.
Finally, Scrum is perhaps the most popular of the several frameworks that enable
Agile techniques.

2

AGILE FRAMEWORK

3

References
Hidalgo, E. S. (2019). Adapting the scrum framework for agile project management in
science: case study of a distributed research initiative. Heliyon, 5(3), e01447.
Putta, A., Paasivaara, M., & Lassenius, C. (2018, Nov...


Anonymous
Really great stuff, couldn't ask for more.

Studypool
4.7
Indeed
4.5
Sitejabber
4.4

Related Tags