Description
1.)
Topic: Skill Gap and Lack of Knowledge - NCR Azure Cloud
You are hired as NCR Azure Cloud Administrator. You are hired to solve the challenge of skill gap and lack of knowledge. Write 2 pages paper in APA format on how to solve the challenge
(For 1st question, write minimum 2 pages answer excluding cover and references page)
2.)
Topic: Computer Security: Security Techniques, Data Availability, Security Controls, & Security Functions
Unformatted Attachment Preview
Purchase answer to see full attachment
Explanation & Answer
View attached explanation and answer. Let me know if you have any questions.
View attached explanation and answer. Let me know if you have any questions.
1
Deepwater Horizon Accident- Preliminary Hazard Analysis (PHA)
Student’s Name
Institution Affiliation
2
Deepwater Horizon Accident- Preliminary Hazard Analysis (PHA)
Preliminary Hazard Analysis (PHA) Chart
Preliminary Hazard List
No.
PHL
-1
System Item
Pipelines
System: Deepwater
Horizon
Haza
rd
Pipelines may be harmed
due to installation issues or
Hazard Effects
Physical damage to the
pipelines causes oil to leak.
pipeline quality.
PHL
-2
PHL
-3
PHL
-4
Casing
Centralizer
There are not enough
centralizers in place. As per
the experiment, there should
be 21 centralizers; however
the corporation only placed
6.
Due to a lack of a
centralizer, the casing
suffered physical
deterioration, which caused
an oil or hydrocarbon leak.
Shoe
Track
Mechani
cal
Barrier
PHL
-5
The strength of the casing
may be impacted by
various installation
techniques.
Float Collar
Valves
The hydrocarbons cannot
be isolated using shoe
tracks.
Float Collar valves fail to
seal.
The casing become physical
damaged due to huge
pressure and lead to oil or
hydrocarbonsleak.
Due to a lack of a
centralizer, the casing
suffered physical
deterioration, which
caused an oil or
hydrocarbon leak.
Potential fire generators can
cause hydrocarbon to run up
through the pipe and catch
on fire.
The valves could be bypassed
by hydrocarbon.
3
The cement shield is
unable to keep the
hydrocarbons isolated and
crumbles.
PHL
-6
Cement Barrier
PHL
-7
Cement Barrier
Cement may be
contaminated.
PHL
-8
Cement Barrier
The cement barrier couldn't
have solidified in the
allotted time.
PHL
-9
Pressure
sensor
(reading)
As the hydrocarbon rises
through the pipe, it is likely
to catch fire from nearby
sources.
The cement barrier's
quality has been
damaged, and it is unable
to do its role.
The pressure cannot be
The kill line system
pressure may not be
accurate if the viscous
spacer crosses the BOP.
maintained by the
cement barrier due to
its weakness.
The anomalous readings go
unnoticed by the operators.
As you can see, this drilling process is fraught with a number of risks. First and foremost, it is
crucial to closely monitor and evaluate the equipment's quality and configuration to ensure that it
will always operate properly. For instance, poor pipeline quality or improper installation could
cause the pipeline to deteriorate, bend under specific conditions, and prevent the other equipment
from sealing the well (Fisher et al., 2014). On the other side, improper installation could cause
physical damage to the casing, which could cause an oil or hydrocarbon leak. Furthermore, only
6 centralizers were present while the experiment called for 21 to hold the casing, which may
have contributed to the casing's failure to resist the pressure (Beyer et al., 2016). Additionally, to
make sure it can operate normally, cement barrier, one of the process' crucial components,
should be examined and constructed in accordance with best practices. Second, a number of
system parts could malfunction suddenly. For instance, the float collar valves and show track
barriers could stop sealing the well or isolating the hydrocarbon.
4
As well, the flow sensor could malfunction or return false readings, which would prevent the
staff from carrying out the proper emergency procedures in a timely manner. Thirdly, when a
situation arises that is outside the paramete...