VoIP part 1 work breakdown structure (wbs)

User Generated

Xfghqlcbby

Business Finance

Description

VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word)

1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA.

Include a cover page containing the title of the assignment, name, the course title, and the date.

The cover page and the reference page are not included in the required assignment page length.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Please let me know if there is anything needs to be changed or added. I will be also appreciated that you can let me know if there is any problem or you have not received the work Good luck in your study and if you need any further help in your assignments, please let me know Can you please confirm if you have received the work? Once again, thanks for allowing me to help you R MESSAGE TO STUDYPOOL NO OUTLINE IS NEEDED Do you want me to do the chart n a large scale

VOIP
by Robert F

Submission date: 04-Nov-2017 12:27PM (UT C-0400)
Submission ID: 874308921
File name: VOIP_work_breakdown_structure_PART _1.docx (65.92K)
Word count: 464
Character count: 2414

VOIP
ORIGINALITY REPORT

5

%

SIMILARIT Y INDEX

4%

0%

4%

INT ERNET SOURCES

PUBLICAT IONS

ST UDENT PAPERS

PRIMARY SOURCES

1
2

4%

Submitted to Excelsior College
St udent Paper

2%

www.studymode.com
Int ernet Source

Exclude quotes

On

Exclude bibliography

On

Exclude matches

Of f


Running Head: WORK BREAKDOWN STRUCTURE

Work breakdown structure
Name:
Institutional Affiliation:
Date:

1

2

WORK BREAKDOWN STRUCTURE
Work breakdown structure
Introduction
The development of every project is driven by the need to produce the best quality
project as far as the attainment of the set goals and objectives is concerned. Considering the
project at hand, the project involves deplo...