SCM/Ops Production Question

Apr 27th, 2015
DotaCN
Category:
Business & Finance
Price: $10 USD

Question description

1.  Power Toys, Inc. produces a small remote-controlled toy truck on a worker-paced line consisting of nine work stations with a single worker at each station.  Stations and processing times are summarized in the following table:

Station

Task

Processing Time (seconds)

1

Mount battery units

75

2

Insert remote control receiver

85

3

Insert chip

90

4

Mount front axle

65

5

Mount back axle

70

6

Install electric motor

55

7

Connect motor to battery unit

80

8

Connect motor to rear axle

65

9

Mount plastic body

80

a.  How much time is required to produce a single toy truck?

b.  What is the bottleneck in this process?

c.  What is the steady state capacity, in toy trucks per hour, of the assembly line?

d.  What is the utilization of the worker at work station 2?

e.  How long would it take to produce 100 trucks starting with an empty system?

f.  The following table shows the projected costs associated with reducing the processing time at each work station in 5 second increments.  The theoretical limits on time reduction at each workstation is 15 seconds less than the current processing time (For example, Mount Battery Units could be reduced from 75 seconds  to 60 seconds.  To make that full reduction, the cost would be $1,200.)  Suppose you have $5,000 to invest in improving the throughput of the process.  Show the sequence of steps you would take to allocate these funds and at each step show the number of trucks per hour that will be able to be produced.

g.   

Station

Task

5 Second Reduction Cost

1

Mount battery units

$400

2

Insert remote control receiver

$300

3

Insert chip

$500

4

Mount front axle

$900

5

Mount back axle

$200

6

Install electric motor

$100

7

Connect motor to battery unit

$400

8

Connect motor to rear axle

$500

9

Mount plastic body

$300


Tutor Answer

(Top Tutor) Daniel C.
(997)
School: UCLA
PREMIUM TUTOR

Studypool has helped 1,244,100 students

8 Reviews


Summary
Quality
Communication
On Time
Value
kevin12622
Dec 3rd, 2016
" Goes above and beyond expectations ! "
kiln82
Nov 24th, 2016
" awesome work thanks "
ashleyisgod
Nov 19th, 2016
" Top quality work from this guy! I'll be back! "
likeplum4
Nov 10th, 2016
" Excellent work as usual "
Molly_Moon
Oct 28th, 2016
" AMAZING as always! "
kpcutie
Oct 19th, 2016
" Excellent job "
Hemapathy
Oct 5th, 2016
" all I can say is wow very fast work, great work thanks "
pmallory
Sep 26th, 2016
" Totally impressed with results!! :-) "
Ask your homework questions. Receive quality answers!

Type your question here (or upload an image)

1820 tutors are online

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors