Algebra word problem

Mathematics
Tutor: None Selected Time limit: 1 Day

A contractor mixes concrete from bags of pre-mix for small jobs.  How many bags with 3% cement should be mix with 5 bags of 30% cement to produce a mix containing 12% cement?

Apr 28th, 2015


(3*b+30(5))/(b+5)  =12.  Cross-multiplying, 12(b+5)=3b+30*5; 12b+60=3b+150; 9b=90; b=10.

Check work: (3*10+30(5))/15 is (30+150)/15 is 180/15 is 12 as desired. 10 bags.