VoIP Part 3 (Quality)

User Generated

Xfghqlcbby

Computer Science

Description

Suppose the VoIP project sponsor wants you to present the project to the board of directors. Particularly, the sponsor would like you to discuss the quality of the project. It is worth noting that during the deployment of the VoIP system the quality control team tracked forty (40) of the deployments. The following problems were documented:

Five (5) of the deployments experienced delays due to the unique configuration of the office space which required modification to install the proper wiring.

Twelve (12) of the users called the help desk to get additional training on the new system.

Two (2) of the new devices were defective.

Prepare a fifteen to twenty (15-20) slide digital presentation with the software of your choice (e.g., PowerPoint, Google slides, Prezi, etc.) in which you:

1.Explain quality and its importance to project success.

2.Explain quality management planning.

3.Contrast quality assurance and quality control.

4.Describe the different quality activities involved in this project and each of their outcomes.

5.Describe Pareto diagrams and their use in project management.

6.Present the data in the provided scenario using a Pareto diagram (Use the software of your choosing to prepare the diagram).

7.Use appropriate key points and / or graphics to professionally convey the information.

8.Include presenter notes to explain each slide.

Your assignment must follow these formatting requirements:

Include the title of the assignment, the student’s name, title, and the date in the presentation.

Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Include the references used in the assignment in the presentation.

Import charts, graphs, and / or the Pareto diagram into the presentation. The completed works must be imported into the presentation.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Please let me know if there is anything needs to be changed or added. I will be also appreciated that you can let me know if there is any problem or you have not received the workGood luck in your study and if you need any further help in your assignments, please let me knowCan you please confirm if you have received the work? Once again, thanks for allowing me to help youRMESSAGE TO STUDYPOOLNO OUTLINE IS NEEDED AS IT IS A POWERPOINT

https://www.studypool.com/discuss/5160443/voip-part3-quality-1
by Robert F

Submission date: 27-Nov-2017 09:19AM (UT C-0500)
Submission ID: 885646594
File name: VOIP_PART _3.pptx (778.33K)
Word count: 847
Character count: 4464

https://www.studypool.com/discuss/5160443/voip-part-3-quality-1
ORIGINALITY REPORT

1

%

SIMILARIT Y INDEX

1%

0%

0%

INT ERNET SOURCES

PUBLICAT IONS

ST UDENT PAPERS

PRIMARY SOURCES

1

1%

brage.bibsys.no
Int ernet Source

Exclude quotes

On

Exclude bibliography

On

Exclude matches

Of f


VOIP PART 3

Name:
Institutional Affiliation:

Date:

INTRODUCTION
• When deploying a given piece of project, it is
important to consider all possible areas that may be
challenging to both the users and the project
developers.
• Some areas may not be detected during
development and may not have developmental
solutions.

QUALITY
• Why is quality important in any given project?
• The quality of a project is important in that it helps the
developers to come up with the best systems which
are in line with the set quality standards.
• There are various advanced Quality Management
approaches that are put I place that enhance
productivity and ensure customer order fulfillment.

PROJECT MATRICES
• When developing projects that are of high quality,
the users of the systems developed benefit from the
use of a system that is free off any doubts as far as
the guarantee is concerned.
• A system that has been developed without
observing the set quality standards may present a
challenge to the user which may also be a huge
contributing factor towards the project failure.

QUALITY MANAGEMENT
PLANNING
• Quality management planning revolves around two
primary aspects.
• Customer

• Processes

QUALITY MANAGEMENT
• Quality management planning can be seen as the act of defining the
various needs of the customers as far as the quality of the system being
developed is concerned which must be in line with the set standards and
the overall processes that the project must follow in order to guarantee the
set quality standards.
• The manner with which the project is to achieve the set standards as far as
the quality and customer needs are concerned is the primary point of
concern in quality management planning.

QUALITY ASSURANCE AND
QUALITY CONTROL
• While both the aspects may seem to be inclined towards the same thing, it is
important to note that the two aspects are not the same.
• There are two distinction factors that may be used in distinguishing between
the two.
• These aspects may be differentiated b...


Anonymous
Really helped me to better understand my coursework. Super recommended.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags