CSIA 485 Project #1 Detailed Assignment Description

Read the Case Study that's attached. Determine the information technology/security gaps and develop a security strategy that includes issues relating to confidentiality, integrity, and availability (CIA), and that includes the key elements relative to People, Process, and Technology.

Step 1: Describe the key issues/challenges/risks from this case study.

Step 2: Based on the information provided in the case study, describe and document the recommended security strategy to mitigate the issues/challenges identified.

Step 3: Describe the proposed security solutions and relationship to the case study.

Step 4: Document a detailed, proposed timeline for addressing each element of the strategy that you identify. Provide estimates for implementing recommended strategies, with rationale. Include what resources are necessary for completing each task in the timeline.

Step 5: Provide a high-level recommendation regarding the next steps to take in mitigating risks identified.

The deliverable for this case study assignment will be a minimum 5 page, double-spaced paper using Times New Roman 12 font and APA style formatting for citations and references. It will also include a minimum of 5 references. The Title/Cover page, illustrations and references are not part of the page count but are required for the assignment. The grading rubric provides additional details as to what should be included in the paper. Your instructor may provide an APA style template to use for this paper.

Unformatted Attachment Preview

Journal of Information Systems Education, Vol. 22(2) Teaching Case Bank Solutions Disaster Recovery and Business Continuity: A Case Study for CSIA 485 Steve Camara Senior Manager, KPMG LLP 1021 E Cary Street, Suite 2000 Richmond, VA 23219 scamara@kpmg.com Robert Crossler Vishal Midha Assistant Professor Computer Information Systems The University of Texas – Pan American recrossler@utpa.edu, vmidha@utpa.edu Linda Wallace Associate Professor Accounting and Information Systems Virginia Tech wallacel@vt.edu ABSTRACT Disaster Recovery and Business Continuity (DR/BC) planning is an issue that students will likely come in contact with as they enter industry. Many different fields require this knowledge, whether employees are advising a company implementing a new DR/BC program, auditing a company’s existing program, or implementing and/or serving as a key participant in a company program. Often times in the classroom it is difficult to find real world practice for students to apply the theories taught. The information in this case provides students with real world data to practice what they would do if they were on an engagement team evaluating a DR/BC plan. Providing students with this opportunity better prepares them for one of the jobs they could perform after graduation. Keywords: Case study, Computer security, Critical thinking, Experiential learning & education, Information assurance and security, Role-play, Security, Team projects 117 Journal of Information Systems Education, Vol. 22(2) 2. CASE TEXT 2. 1 Company Background Bank Solutions, Inc. (a pseudonym), founded in 1973 by the First Presidential Bank, a major bank of its time, is a provider of item processing services i to community banks, savings and loan associations, Internet banks, and small- to mid-size credit unions. It offers a full range of services, including in-clearing and Proof of Deposit (POD) processing, item capture, return and exception item processing, image archive storage and retrieval, and customer statement rendering. Bank Solutions was formed in 1973 when the Chief Operating Officer of First Presidential Bank, a major commercial bank, recognized an opportunity. Since item processing functions are standardized (they have to be in order for originating and receiving financial institutions to clear customer transactions) and scalable with increases in item processing volumes, they were able to offer these services to other financial institutions wishing to reduce operating expense and focus on growth strategies and other core business functions. First Presidential marketed these services under the Bank Solutions brand name. Over the next 15 years, Bank Solutions enjoyed modest growth. By 1988, it served 41 small- to mid-size financial institutions. It had not, however, developed a market presence outside of the Northwestern Region of the United States, as management had hoped. This was primarily because Bank Solutions was unable to compete with other item-processing service providers that had developed proprietary software systems considered “top of the line.” To make matters worse, at the time almost one quarter of Bank Solutions‟ client base was saving and loan associations (saving and loans). As a result of the Savings and Loan crisis, 60% of Bank Solutions‟ savings and loan customer base failed over the six years spanning 1985–1991, thus stunting the outsourcer‟s growth. The related slow down of the financial services and real estate industries and the recession of 1990–1991 presented further headwinds to the growth objectives of First Presidential management. In 1994, First Presidential sold off Bank Solutions. Under new management, Bank Solutions thrived. Keys to the company‟s renewed success included the following: • The development of key strategic partnerships with other industry participants, including data clearing houses and financial institution core processing system ii outsourcers. • The introduction of a new company culture that focused on open door management, mentoring, and enhanced employee benefits. • The development of a proprietary, state of the art item processing system that uses state-of-the-art Optical Character Recognition (OCR) technology to achieve character recognition accuracies that were previously unheard of. • The implementation of “remote capture” technologiesiii to meet electronic banking initiatives and regulations such as “Check 21.” • The upgrade or replacement of other administrative information systems, including the company‟s financial reporting system. This helped to increase operational effectiveness and efficiencies. From 1995–2008, Bank Solutions enjoyed unprecedented growth. During that timeframe, the company expanded operations to 18 item processing facilities, two data centers in which the item processing system was hosted, and 345 financial institutions. 2.2 Current Scenario (2011) Douglas Smith, the Chief Information Officer for Bank Solutions, was one of the original members of “new management” and responsible for many of Bank Solutions‟ past successes. A solid, middle-sized company with continued growth potential, Bank Solutions has become a target for a leveraged corporate buyout. This is an attractive situation for Douglas and other members of executive management. Several of these individuals are close to retirement; and initial indications are that the price of the buyout will be very favorable for members of executive management. The CEO and other influential members of executive management want Bank Solutions to remain an attractive purchase option and, as a result, have contracted the services of your team as an outside consultant to identify operating and regulatory risks and advise them on control measures to mitigate the risks. 2.3 Risk Assessment Task As members of the engagement team performing the risk assessment, your team has been given the task of assessing Bank Solutions‟ incident handling, business continuity, and disaster recovery strategy. In order to perform the assessment, preliminary interviews with Douglas Smith, the Data Center Managers, Systems Engineers and Network Architect in each of Banking Solutions‟ data centers, and the IT Managers and Day and Night Operations Managers from seven of the largest item processing facilities were conducted. Additionally, the following documentation related to Bank Solutions‟ security incident management, DR/BC planning activities was reviewed: • Flow charts that diagram the item processing operations and data flow between Bank Solutions item processing facilities and data centers and outside entities (see Appendix A) • A diagram of Bank Solutions‟ network architecture 118 Journal of Information Systems Education, Vol. 22(2) • Bank Solutions‟ Data Center Disaster Recovery and • • • • • • • • • • • Business Continuity Plan (DRBCP) Policies, procedures, guidelines, and standards related to security incident response Item Processing Facility DRBCPs Results from the most recently completed DRBCP test/exercise Distribution list for the DRBCP Bank Solutions‟ Backup and Recovery Policy. Screen prints of the configurations from Bank Solutions‟ backup utility (these configurations show what server shares are subject to automated backup and the frequency of those backups) Contracts with the off-site storage provider A system-generated listing of access to event logging servers A list of individuals who have been provided access to recall backup tapes from the off-site storage vendor. Screenshots of the Intrusion Detection System (IDS), firewall, and other event logging capability configurations Excerpts from the IDS and firewall event logs and management‟s manually maintained incident tracking log. 2.4 Facts: Risk Assessment Findings Based on the discussions held with the management and a review of the documentation provided, you note the following facts: 1. With the assistance of an external consultant, Bank Solutions wrote its current data center DRBCP in 2007. It was last updated in January 2009. 2. According to Douglas, the data center DRBCP was last tested in 2007. Testing activities consisted of a conceptual, table-top walkthrough of the DRBCP conducted by Douglas with the Data Center Managers and Network and Systems Engineers. Item processing facility DRBCPs have not yet been tested. 3. Site-specific DRBCPs have been written for the five largest item processing facilities. The remaining item processing facilities have a generic “small center” DRBCP template that was distributed to and customized by facility management in June 2010. Four item processing facilities have not yet completed the customization exercise. 4. DRBCPs contain several sections, including the following: • Emergency/crisis response procedures • Business recovery procedures • “Return to normal” procedures • Various appendices Recovery Time Objectives and Recovery Point iv Objectives for each critical business process and system were not identified in the DRBCP. The following details, most of which are included in the DRBCP appendices, are also documented in the text of the DRBCP: 119 • Critical systems, including detailed hardware and software inventories • Critical business processes and process owners • Alternative processing facility addresses and directions • “Calling Trees” (notification listings) • Critical plan participant roles, responsibilities, and requirements Critical vendor contact listings Key business forms Specific recovery procedures for key systems Procedures for managing public relations and communications Based on a review of DRBCP distribution lists, it appears that not all key plan participants have a copy of the plan. When this was discussed with Douglas, he responded that copies of all DRBCPs are stored on the network (which is replicated across both data centers and via backup tape). Critical plan participants have not been trained to use DRBCPs. Bank Solutions has implemented a robust host-based IDS, including detailed event logging and reporting capabilities. However, neither the DRBCP nor any other policy, standard, guideline, or procedure addresses security incident handling steps, including escalation points of contact and procedures for preserving the forensic qualities of logical evidence. Event logging is also performed when power users perform specific privileged activities on production servers and selected administrative back office systems. Interestingly, it was noted that several of the same power users whose actions are recorded onto event logs also have write access to the logs themselves. A review of the network diagram and conversations with the Network Architect reveal that redundancies have been implemented at the network perimeter (e.g., routers, firewalls, IDS, load balancers, etc.). Banking Solutions has organized their DR/BC program according to a “sister center” format; that is, each data center serves as the other‟s “hot site” processing location and each item processing facility has been assigned a corresponding item processing facility to serve as a backup processing location. Neither the DRBCPs nor any other documentation outline specific processing responsibilities for backup facilities. On a daily basis, transaction detail and item image files from the current day‟s processing operations are uploaded from each item processing facility to their regional data center (see Appendix A). At the data centers, electronic vaulting has been established whereby all e-mail, file, and application servers and databases at the data center are continuously backed up to the other data center via dual dedicated fiber optic lines. A data backup and recovery utility has been implemented in each data center and the item processing facilities. Full backups of critical data files, software programs, and configurations are performed • • • • 5. 6. 7. 8. 9. 10. 11. 12. 13. Journal of Information Systems Education, Vol. 22(2) once a week and incremental backups are performed on a daily basis Monday through Friday. 14. At one item processing facility, backup jobs have routinely failed due to unknown causes. When the topic was discussed with the IT Manager on duty, he shrugged the failures off noting that the core financial institution transaction data and images are transmitted to and archived at the Bank Solutions Data Center East on a daily basis. 15. At the item processing facilities, the management has been tasked with contracting the off-site storage of backup tapes. At one of the item processing facilities, management has contracted the bank across the street to store its backup tapes in a safety deposit box. At another item processing facility, the night Operations Manager stores the backup tapes in a safe at his home. At a third item processing center, tapes are stored in a shed at the back of the building. ii 120 Journal of Information Systems Education, Vol. 22(2) This is individual project. As a member of an engagement team in charge of performing the incident handling, DR/BC risk assessment for Bank Solutions. you should read the case background and the facts identified in the interviews. Individual Work: For all of the facts/ findings, prepare a written report that lists the condition(s) that present risks to Bank Solutions as well as proposed recommendations for addressing those conditions. 121 Journal of Information Systems Education, Vol. 22(2) Appendix A This case was developed solely for class discussion. While the situation described in this case is based on realistic events, the Bank Solutions is a fictional organization. Further, the names, product/service offerings, and the names of all individuals in the case are fictional. Any resemblance to actual companies, offerings, or individuals is accidental. 122 Copyright of Journal of Information Systems Education is the property of Journal of Information Systems Education and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use.
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Running head: CASE STUDY- GAP ANALYSIS

Case Study-Gap Analysis
Institution Affiliation
Date

1

CASE STUDY- GAP ANALYSIS

2
Introduction

As the use of computers and other digital devices have become very important for
businesses like Bank solutions Inc, they have also become targets for attacks. It is therefore
very important for businesses to ensure that they all the devices and systems that are used are
not compromised in any way. Farooq et al. (2015) note that information security is all about
protecting information and all the systems that are related to information from unauthorized
access. The information security triad is made up of three aspects i.e. confidentiality, integrity
and availability (CIA). Confidentiality is about ensuring that the information is not accessed
or made available to people who do not have the authorization. Integrity is the surety that the
information has not been compromised in any way. According to Farooq et al., (2015),
availability means that the information can be accessed easily by those who have
authorization
Key Issues
There are several issues that come out of the case study for Bank Solutions Inc.
Failures in the backup process at one item processing center have not been solved and that
means there could be irregularities in the backups. There is also the issue of there not being a
clear policy on how the backups should be stored with some being stored in areas where they
could easily be accessed or lost for example some are stored in safety deposit box, in a shed
at the back of the building or in a safe at home. There has also not been any training that has
been done for the critical participants on the use of DRBCPs. Power users in the organization
have access and write passwords to the event logs. There is also no documentation regarding
responsibilities of backup facilities. Key participants do not have a copy of the DRBP plan
even though it is stored on the network.

CASE STUDY- GAP ANALYSIS

3
Challenges

One of the challenges that were faced by Bank Solutions Inc. was the inability for it to
grow despite the fact that there was the opportunity for it to do so. For close to 15 years they
enjoyed modest growth but were unab...


Anonymous
Really helped me to better understand my coursework. Super recommended.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags