I’m first year college student in construction management major and I have questions listed in the attachment down below about the building systems.


CMGT 206 Exam 1 Feb 27, 2018 Name: _______________________ 1. List 4 key players in a construction project and briefly describe their role. 2. List and briefly describe (3) types of documentation utilized by the key players and overseen by the CM/PM while administrating a project as it relates to Mechanical and Plumbing systems. 3. List (3) close-out activities/deliverables for a project as they relate to mechanical and plumbing portions of the project. 4. Fill in the blank. Weak design intent will lead to a ________ buiding. 5. It is estimated the ___ of all water is fresh water. 6a. BTU stands for what? 6b. Utilizing Figure 4.1, list the following items at 70℉ Btu/h Body Heat Generated ___________ Btu/h Body Heat Loss by Convection/radiation _____________ Btu/h Body Heat Loss by Evaporation 7a. In Figure 4.4, as temperature begins to drop and RH% Increases, what should be done to maintain the comfort zone. 7b. In Figure 4.4, as temperature begins to increase and RH% Increases, what should be done to maintain the comfort zone. 8. In your own words, describe the following terms: Dry Bulb Temperature Wet Bulb Temperature Relative Humidity 9. Utilizing Figure 4.7, list the following: - Approximate RH at 77℉ Dry-bulb and 68℉ Wet-bulb - Approximate RH at 77℉ Dry-bulb and 59℉ Wet-bulb 10. List the four major categories discussed in class with respect to major goals of Indoor Air Quality 11. List three Common Air Pollutants along with sources, effects and Control Strategies to deal with the pollutants. 12. Shading windows from solar heat gain is a key design strategy for passive cooling and to __________________________. 13. Buildings that are too sealed at the perimeter could be prone to ____________. 14. Describe the three broad categories of insulations. 15a. The U-Factor is the reciprocal of the sum of _______________. 16b. The U-Factor equation is: U =___________ 17a. Utilizing Tables E.1 and E.3, calculate the simple winter U-factor for the materials in a wall assembly listed below. Use all I-P Units Material R-Value List Page # Gypsum Board (.5 Inch) (Building Board Section E.1) _______ ____ Glass fiber batt insulation (nominal 3.5” of density 1.5) (Insulating Materials Section E.1) _______ ____ Particle Board (1” Low Desnity) (Building Board Section E.1) _______ ____ Wood Siding (.5x8in bevel, lapped) (Siding Materials Section E.1) _______ ____ Inside air Film (Vertical, Non Reflective ε = 0.90) (E.3) _______ ____ TOTAL RESISTANCE 17b. Show Work: U = _______ 18. List (7) uses of water in architecture 19a. Utilizing Chart 20.9 in the text, list the minimum size of a horizontal rainwater pipe that drains an area of 21,400 square feet in a region that receives 2 inch/hour average rainfall and roof with .5 inch/ft slope. 19b. List the predicted flow rate in GPM. 20a. List and describe (4) Physical Characteristics of Water 20b. List and describe (3) Chemical Characteristics of Water 21a. Calculate, in psi, the static pressure at the bottom of a cubic foot of water. (show work) 21b. How much pressure will it take to raise a cubic foot of water 10 feet horizontally? 22. Utilizing Table 21.12, list the approximate expansion per 100 feet of copper that endures a 100 degree F temperature change. 23. Describe the key differences between gray water and dark water. 24. In your own words, describe why traps and ventilation are key components to drainage systems. 25. On properties with high water tables, describe generally how septic systems disperse waste water. 26a. What is the Balance Point temperature of a building describe? 26b. Circle the answer: The lower the balance point of a facility, the (More or Less) the building is said to be efficient. 27. True or false: Facilites with massive amounts of building skin tend to have central HVAC systems? 28. Describe why Electric Resistant heating is not as desirable as other heating methods. 29. List (4) types of infrastructure that compete for space in vertical chases and why management of installation of systems in vertical chases is important 30. Circle one: Freezestats help protect the (Heating or Cooling) coil in Air Handling Units. Extra Credit: Describe why carpet feels different to the skin as opposed to ceramic tile while at the same temperature.

Tutor Answer

michyexcel
School: New York University

Attached.

CMGT 206
Exam 1
Feb 27, 2018
Name:

_______________________

1. List 4 key players in a construction project and briefly describe their role.
i.
The client- the role of the client is to define a suitable method of using building
information model.
ii. The architect – develops theoretical design, construction level information, a
detailed design an analysis as well as the construction documents.
iii. The engineer- also develops a detailed design, and shops drawings with well
detailed elements.
iv.
The contractor- the contractor has a role of performing constructability analysis,
produce cost reliability, and schedule as well as plan using 4D model.
2. List and briefly describe (3) types of documentation utilized by the key players and
overseen by the CM/PM while administrating a project as it relates to Mechanical and
Plumbing systems.
i.
Diaries – contains summaries of the events that took place in each day and are
written in members own words. They help keep track of day to day activities,
observations, conversations, or any other information concerning the project’s
activities that may be relevant.
ii. Logs- they keep track of all the regular activities on the job site such as delivery
logs, phone logs, transmittal logs, and request for information logs.
iii. Daily field reports- this is a more formal way of information recording on the job
site. Information such as daily activities, equipment’s used, delivered materials
and equipment, visitors on the site, and temperature and weather is recorded in
these type of reports.

3. List (3) close-out activities/deliverables for a project as they relate to mechanical and
plumbing portions of the project.
i.
Project analysis- the project participants looks back over the projects success and
failures
ii. Finalizing documentation-, this is the documentation of the whole process from
initial project requirements, developmental phase, as well as the testing records.
iii. Reassigning resources- this involves reassigning those staffs with free time at the
end of the project to other duties or proj...

flag Report DMCA
Review

Anonymous
Outstanding Job!!!!

Similar Questions
Hot Questions
Related Tags

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors