Description
Read the Chapter 9 Case Study "Facility Layout at Wheeled Coach Ambulance" and watch the video, then write a summary of at least 300 words using the accompanying discussion questions to guide your essay written in APA style, with a reference page and a cover page.
https://www.mathxl.com/Student/MediaPopup.aspx?typ...
Facility Layout at Wheeled Coach
When President Bob Collins began his career at Wheeled Coach, the
world’s largest manufacturer of ambulances, there were only a handful of
employees. Now the firm’s Florida plant has a workforce of 350. The
physical plant has also expanded, with offices, R&D, final assembly,
and wiring, cabinetry, and upholstery work cells in one large building.
Growth has forced the painting work cell into a separate building,
aluminum fabrication and body installation into another, inspection and
shipping into a fourth, and warehousing into yet another.
Like many growing companies, Wheeled Coach was not able to design its
facility from scratch. And while management realizes that
material-handling costs are a little higher than an ideal layout would
provide, Collins is pleased with the way the facility has evolved and
employees have adapted. The aluminum cutting work cell lies adjacent to
body fabrication, which, in turn, is located next to the body-
installation work cell. And while the vehicle must be driven across a
street to one building for painting and then to another for final
assembly, at least the ambulance is on wheels. Collins is also
satisfied with the flexibility shown in design of the work cells. Cell
construction is quite modular and can accommodate changes in product mix
and volume. Additionally, work cells are typically small and moveable,
with many work benches and staging racks borne on wheels so that they
can be easily rearranged and products transported to the assembly line.
Assembly-line balancing is one key problem facing Wheeled Coach and
every other repetitive manufacturer. Produced on a schedule calling for
four 10-hour work days per week, once an ambulance is on one of the six
final assembly lines, it must move forward each day to the next
workstation. Balancing just enough workers and tasks at each of the
seven workstations is a never-ending challenge. Too many workers end up
running into each other; too few can’t finish an ambulance in 7 days.
Constant shifting of design and mix and improved analysis has led to
frequent changes.
Discussion Questions*
1. Develop a layout model for Wheeled Coach. Include in your model each
step in the process. Assigned the steps with predecessors. Use minutes
as your time increment. Calculate a cycle time, theoretical time,
balance the line using the longest task time rule and determine the
efficiency from your simulated data.
2. What other analytical techniques are available to help a company like Wheeled Coach deal with layout problems?
3. What suggestions would you make to Bob Collins about his layout?
4. How would you measure the “efficiency” of this layout?
Explanation & Answer
Attached.
1
Facility Layout at Wheeled Coach Ambulance
Student name:
Institutional affiliation:
2
Facility Layout at Wheeled Coach Ambulance
The attached word document addresses the question “Read the Chapter 9 Case Study "Facility
Layout at Wheeled Coach Ambulance" and watch the video, then write a summary of at least
300 words using the accompanying discussion” as follows:
1. Layout for Ambulance manufacturing at Wheeled Coach:
•
•
•
•
•
Aluminum
cutting cell
Body Fabrication
Body installation
•
Painting
•
•
•
•
•
•
Cabinetry
upholstery work
Wiring
Final assembly
R&D
Offices
Inspection
Shipping
•
Warehousing
2. Some other analytical techniques available to assist Wheeled Coach and other companies
in solving layout problems include...