Business Finance
Rasmussen College Music Festival Event WBS & Gantt Chart Assignment

Rasmussen College

Question Description

Using the downloadable software, templates provided, or other preferred software, such as Microsoft Excel:

This list of activities needs to contain enough detail so you can effectively plan and schedule your event.

  • Using the completed WBS as a reference, next complete a Gantt chart of your project using the template provided. If you discover in the process you overlooked activities make sure to include them in the WBS.
    Gantt Chart
  • In a paper that is a minimum of 2 pages long, identify the Critical Path for your project. Using the WBS and the Gantt chart you constructed for this project analyze how much longer you will need to start planning in advance of your event in order to complete the project? Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.).

    Would you like information about how to format in APA? Click here.
  • Papers should be spell-checked and submitted to Grammarly prior to submitting your paper to the drop box. "Grammarly" is a free service for Rasmussen students. Once you've made all of your suggested grammar corrections, submit your paper to the Drop Box, along with your Grammarly PDF report as a separate attachment. Your goal is to obtain a Grammarly score of 90 - 100%.
  • Part 2For this part of the Course Project, you will put together a Quality Plan. In order to provide the highest quality experience possible, attendees of the event were surveyed to determine what was most important to them when attending such an event. The result of this survey is listed below:
    - 90% of those completing the survey felt that having engaging and dynamic speakers is key to a successful event
    - 90% felt that it was important that the accommodations were physically located where the convention is being held; they didn't want to have to take a bus or a shuttle from their hotel to the convention.
    - 85% stated the food provided should be wonderful and meet any dietary restrictions, such as vegetarian or gluten-free.
    For your assignment, you will need to do the following:Complete a scope statement for your project (Use may use the templates for Project Scope and Business Objective Worksheet provided). Your project Scope should be at one page in length.Project Scope and Business Objective Worksheet

Unformatted Attachment Preview

Part 1 Using the downloadable software, templates provided, or other preferred software, such as Microsoft Excel: • Complete a WBS for your project. Work Breakdown Structure This list of activities needs to contain enough detail so you can effectively plan and schedule your event. • • Using the completed WBS as a reference, next complete a Gantt chart of your project using the template provided. If you discover in the process you overlooked activities make sure to include them in the WBS. Gantt Chart In a paper that is a minimum of 2 pages long, identify the Critical Path for your project. Using the WBS and the Gantt chart you constructed for this project analyze how much longer you will need to start planning in advance of your event in order to complete the project? Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.). Would you like information about how to format in APA? Click here. • Papers should be spell-checked and submitted to Grammarly prior to submitting your paper to the drop box. "Grammarly" is a free service for Rasmussen students. Once you've made all of your suggested grammar corrections, submit your paper to the Drop Box, along with your Grammarly PDF report as a separate attachment. Your goal is to obtain a Grammarly score of 90 - 100%. Part 2 For this part of the Course Project, you will put together a Quality Plan. In order to provide the highest quality experience possible, attendees of the event were surveyed to determine what was most important to them when attending such an event. The result of this survey is listed below: - 90% of those completing the survey felt that having engaging and dynamic speakers is key to a successful event - 90% felt that it was important that the accommodations were physically located where the convention is being held; they didn't want to have to take a bus or a shuttle from their hotel to the convention. - 85% stated the food provided should be wonderful and meet any dietary restrictions, such as vegetarian or gluten-free. For your assignment, you will need to do the following: Complete a scope statement for your project (Use may use the templates for Project Scope and Business Objective Worksheet provided). Your project Scope should be at one page in length. Project Scope and Business Objective Worksheet Using the WBS for your project, identify which of the Work Activities listed could potentially impact those items identified by attendees as critical for the success of the project. Complete a Failure Mode and Effects Analysis. Only include those activities that impact the four issues identified by your customers as critical to producing a quality event. For each of the activities listed: - Based on your knowledge of the activity analyze the severity of the impact on the project if the activity failed to produce a quality result as Low, Medium, or High - Also based on your knowledge of the activity analyze the probability of the poor quality result occurring as Low, Medium, or High - For the three activities that were evaluated as having the most severe quality consequences AND having the highest impact generate an action plan to reduce or eliminate these failures from occurring • • In a paper that is a minimum of 2 pages long, clearly and concisely summarize the action items identified through the FMEA that will increase the probability of your project being considered a success with your customers. Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.). Would you like information about how to format in APA? Click here. • Papers should be spell-checked and submitted to Grammarly prior to submitting your paper to the drop box. "Grammarly" is a free service for Rasmussen students. Once you've made all of your suggested grammar corrections, submit your paper to the Drop Box, along with your Grammarly PDF report as a separate attachment. Your goal is to obtain a Grammarly score of 90 - 100%. *Grammarly instructions can be accessed by clicking on this link Grammarly handout Grammarly Student User Guide Submit your completed assignments to the drop box below. Please check the Course Calendar for specific due dates. Save Part 1 of your assignment as a Microsoft Excel document. (Mac users, please remember to append the ".xlsx" extension to the filename.) and the paper as a Microsoft Word document. (Mac users, please remember to append the ".docx" extension to the filename.) Save Part 2 of your assignment as a Microsoft Word document. (Mac users, please remember to append the ".docx" extension to the filename.) The name of the file should be your first initial and last name, followed by an underscore and the name of the assignment, and an underscore and the date. An example is shown below: Jstudent_exampleproblem_101504 Need Help? Click here for complete drop box instructions. Work Breakdown Structure Table Provide basic information about the project including: Project Title – The proper name used to identify this project; Project Working Title - The working name or acronym that will be used for the project; Proponent Secretary - The Project Manager who is responsible for the entire project; Other Agency – Other agency that will be responsible for the management of the project; Prepared by – The person(s) preparing this document; Date/Control Number – The date the plan is finalized and the change or configuration item control number assigned. Project Title: Project Working Title: Project Manager: Other Agency: Prepared by: Date / Control Number: Element Number WBS Elements Activity, Task, or Sub-Task Name Definition of Activity or Task (Description) Responsible Person or Group Estimated (E) or Project Phase Actual (A) Cost (Cross (Cross reference to reference to budget) schedule) Project Scope and Business Objective Worksheet A. General Information Provide basic information about the project including: Project Title – The proper name used to identify this project; Project Working Title - The working name or acronym that will be used for the project; Project Manager- The Project Manager who is responsible for the entire project; Other Agency – Other agency that will be responsible for the management of the project; Prepared by – The person(s) preparing this document; Date/Control Number – The date the plan is finalized and the change or configuration item control number assigned. Project Title: Project Working Title: Proponent Secretary: Proponent Agency: Prepared by: Date / Control Number: B. Project Scope 1. Deliverables Analyze the project scope and objectives outlined in the Project Proposal and Charter to understand the Project Deliverables. Answer these questions: a) What are the Project Deliverables? b) Where, when, and to whom are the Deliverables provided? 1 2. Project Approach and Solution Analyze the project description and scope to understand the solution and approach to the project. Answer the following questions: a) What is the process or technology solution proposed? b) Who will perform the work? c) When and where is the project executed? 2 C. Project Business Objectives Using the objectives outlined in the Charter, list the objectives and any additional detail as necessary to clarify what results the project is intended to attain. 3 ...
Purchase answer to see full attachment

Final Answer

Attached!!!

RUNNING HEAD: Project for music festival event

Project for music festival event
Student’s Name
Course
Date

Work Breakdown Structure Table
Provide basic information about the project including: Project Title – The proper name used to identify this project;
Project Working
- Thefestival
working
name or acronym that will be used for the project; Proponent Secretary2 - The Project
ProjectTitle
for music
event
Manager who is responsible for the entire project; Other Agency – Other agency that will be responsible for the
management of the project; Prepared by – The person(s) preparing this document; Date/Control Number – The date the
plan is finalized and the change or configuration item control number assigned.
Project
Title:

Music festival

Project Working Title:

Project
Manager
:

Other Agency:

Prepared
by:

Date / Control
Number:

Element
Number

Site

WBS Elements
Activity, Task, or
Sub-Task Name

Definition of Activity or
Task (Description)

Selection,
environment,
neighbors,
cleaning,...

Purdue University

Anonymous
Thanks for the help.

Anonymous
Outstanding. Studypool always delivers quality work.

Anonymous
Tutor was very helpful and took the time to explain concepts to me. Very responsive, managed to get replies within the hour.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors