Rasmussen College Completing a Gantt Chart & a Quality Plan Assignment

User Generated

RzEvyrl

Other

Rasmussen University

Description

Part 1

Using the downloadable software, templates provided, or other preferred software, such as Microsoft Excel:

This list of activities needs to contain enough detail so you can effectively plan and schedule your event.

  • Using the completed WBS as a reference, next complete a Gantt chart of your project using the template provided. If you discover in the process you overlooked activities make sure to include them in the WBS.
    Gantt Chart
  • In a paper that is a minimum of 2 pages long, identify the Critical Path for your project. Using the WBS and the Gantt chart you constructed for this project analyze how much longer you will need to start planning in advance of your event in order to complete the project? Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.).

    Would you like information about how to format in APA? Click here.

  • Papers should be spell-checked and submitted to Grammarly prior to submitting your paper to the drop box. "Grammarly" is a free service for Rasmussen students. Once you've made all of your suggested grammar corrections, submit your paper to the Drop Box, along with your Grammarly PDF report as a separate attachment. Your goal is to obtain a Grammarly score of 90 - 100%.

Part 2

For this part of the Course Project, you will put together a Quality Plan. In order to provide the highest quality experience possible, attendees of the event were surveyed to determine what was most important to them when attending such an event. The result of this survey is listed below:

- 90% of those completing the survey felt that having engaging and dynamic speakers is key to a successful event
- 90% felt that it was important that the accommodations were physically located where the convention is being held; they didn't want to have to take a bus or a shuttle from their hotel to the convention.
- 85% stated the food provided should be wonderful and meet any dietary restrictions, such as vegetarian or gluten-free.

For your assignment, you will need to do the following:

Complete a scope statement for your project (Use may use the templates for Project Scope and Business Objective Worksheet provided). Your project Scope should be at one page in length.

Project Scope and Business Objective Worksheet

Using the WBS for your project, identify which of the Work Activities listed could potentially impact those items identified by attendees as critical for the success of the project.

Complete a Failure Mode and Effects Analysis. Only include those activities that impact the four issues identified by your customers as critical to producing a quality event. For each of the activities listed:

- Based on your knowledge of the activity analyze the severity of the impact on the project if the activity failed to produce a quality result as Low, Medium, or High
- Also based on your knowledge of the activity analyze the probability of the poor quality result occurring as Low, Medium, or High
- For the three activities that were evaluated as having the most severe quality consequences AND having the highest impact generate an action plan to reduce or eliminate these failures from occurring
  • In a paper that is a minimum of 2 pages long, clearly and concisely summarize the action items identified through the FMEA that will increase the probability of your project being considered a success with your customers.
  • Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.).

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Gantt Chart

Version 1.7.3

© 2006-2014 Vertex42 LLC

0

HELP

Event Management Project
JM Company

Today's Date:

4/19/2018

Thursday

(vertical red line)

Project Lead: [Name]
Start Date: 4/1/2018

[42]

Sunday

1.2.1

Arranging of flowers

4/4/18

4/8/18

5

0%

3

0

5

1.2.2

Stages decorartion

4/6/18

4/10/18

5

0%

3

0

5

4/7/18

4/11/18

5

0%

3

0

5

4/11/18

4/15/18

5

0%

3

0

5

1.3

Food preparation

1.4

Cleaning and clearing
the area

2

Recruit executive
committee

4/3/18

4/7/18

5

25%

4

1

4

2.1

Developing lists of
expert

4/1/18

4/5/18

5

25%

4

1

4

2.2

Sending invitation

4/4/18

4/8/18

5

25%

3

1

4

2.3

Sending cards

4/9/18

4/13/18

5

25%

5

1

4

2.4

Training

4/14/18

4/18/18

5

25%

3

1

4

3

Train Volunteers

4/1/18

4/8/18

8

50%

5

4

4

3.1

Hiring process

4/1/18

4/6/18

6

50%

5

3

3

3.2

Preparing the new hired

4/4/18

4/9/18

6

50%

4

3

3

3.3

Assigning of tasks

4/9/18

4/14/18

6

50%

5

3

3

3.4

Assessment of training

4/14/18

4/19/18

6

50%

4

3

3

4

Develop budegt

4/12/18

4/18/18

7

0%

5

0

7

4.1

Assigning of auditor

4/1/18

4/5/18

5

0%

4

0

5

4.2

Listing of foods costs

4/4/18

4/8/18

5

0%

3

0

5

4.3

Suming up of total cost

4/9/18

4/13/18

5

0%

5

0

5

4.4

Financial expert
assesssment

4/14/18

4/18/18

5

0%

3

0

5

[Name]

[Name]

[Name]

19 - Nov - 18

12 - Nov - 18

29 - Oct - 18

05 - Nov - 18

22 - Oct - 18

15 - Oct - 18

08 - Oct - 18

01 - Oct - 18

24 - Sep - 18

17 - Sep - 18

10 - Sep - 18

03 - Sep - 18

27 - Aug - 18

20 - Aug - 18

13 - Aug - 18

30 - Jul - 18

06 - Aug - 18

23 - Jul - 18

5

16 - Jul - 18

0

09 - Jul - 18

5

02 - Jul - 18

0%

25 - Jun - 18

5

18 - Jun - 18

4/6/18

11 - Jun - 18

4/2/18

04 - Jun - 18

5

Formulate the tables

1.2

28 - May - 18

0

21 - May - 18

7

4

14 - May - 18

0

0%

End

30 - Apr - 18

Days Remaining

5

5

Start

07 - May - 18

Days Complete

0%

4/12/18

[Name]

23 - Apr - 18

Working Days

7

4/8/18

1.1

Task
Lead

16 - Apr - 18

% Complete

4/1/18

Arrage the chairs

Tasks
Secure Venue

09 - Apr - 18

Duration (Days)

4/1/18

WBS
1

2

02 - Apr - 18

First Day of Week (Mon=2):

[42]

TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on which level you want to use (formulas are different for different WBS levels)
1
1.1
1.1.1
1.1.1.1

Media Collaboration
Contacting the media

4/1/18

4/9/18

9

0%

6

0

9

4/5/18

4/11/18

7

0%

5

0

7

Training for media

4/6/18

4/12/18

7

0%

5

0

7

Arraging the
media position

4/15/18

4/21/18

7

0%

5

0

7

Gantt Chart Template by Vertex42.com

© 2008 Vertex42 LLC

Gantt Chart Template Pro
Gantt Chart Template Pro is similar to this free version,
but it is unlocked, more feature-packed, and includes other
bonus content such as sample project schedules.
Already spent a lot of time working with this free version?
That's okay. In addition to downloading the Gantt Chart Template Pro
files, you will be given the password for unlocking this spreadsheet.

Learn More About Gantt Chart Template Pro
http://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html

- View screenshots
- Watch demo videos

Benefits and Features of Gantt Chart Template Pro
Unlocked (worksheets are not password-protected)
By unlocking the free version or using Gantt Chart Template Pro, you will be able to use
all of the functions and features available in Excel, such as formatting cells, inserting
columns, and grouping rows.

More Ways to Define a Task
Choose from a larger set of template rows that provide more options for
defining the Start date, End date, duration, and dependency of tasks.
Define a task based on the …
- Start date and End date
- Start date and Work days
- Start date and Calendar days
- Predecessor and End date
- Predecessor and Work days
- Predecessor and Calendar days

Easily Create Task Dependencies
Though you ca...


Anonymous
Very useful material for studying!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags