Project Closure, Deployment and Maintenance

User Generated

U_Z_U_L

Programming

Description

1. Summarize the steps that are required for closure of the project, including final release verification and sign-off. 2. Release candidate of application. 3. submit a PPT (at least 8-12 slides) presentation to present the most important takeaway based on the tasks assigned to him/her.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Find attached.

Most Important Takeaway
Bayside Sandwich Co Online Ordering System
Project
Student’s Name
Colorado Technical University (CTU)
Professor Abbas

Introduction- Important takeaway from Coding
Successful development of an online ordering system requires coding
➢ Coding is a critical part of software development
➢ Coding has to be efficient to achieve effective software product
➢ It is essential to a bind by Coding standards which include:

– Procedure sequence
– The right programming language
– Programming style
– Programing methods

Successful Coding
• Successful coding is anchored in doing
the following tasks effectively:
–Effective Code building
–Code testing
–Debugging the code and correcting errors
–Code deployment

Best Practices In System Deployment
➢After coding and programing, the resultant system
should be deployed.
➢The deployment should adhere to the following
universal best practices in system deployment;
• Ensure the installation structure simple
• Keep the system and everything updated
• Have an effective roll back strategy

Best Practices In System Deployment Cont-d
• Rely on automation for repeatable processes:
• Deployment procedures and scripts on-...


Anonymous
Excellent! Definitely coming back for more study materials.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags