Description
Hello,
I hope you are doing well.
I have an assignment, so I need you to do my assignment please. Please don't copy and not plagriasm.
I will really appreciate for that who can do my Assignment
Thanks
Unformatted Attachment Preview
1. In the original classful address scheme, was it possible to determine the class of an address
from the address itself? Explain.
2. If an ISP assigned you a /28 address block, how many computers could you assign an address?
3. If an ISP offers a / 28 address block for 160 dollars per month and a / 27 address block for
160 dollars per month, which has the cheapest cost per computer?
4. Suppose you are an ISP with a / 24 address block. Explain whether you accommodate a
request from a customer who needs addresses for 255 computers.
5. Can a host have more than one IP address? Explain.
6.Your IP address is 121.76.98.18
subnet mask is 255.255.0.0
•
•
•
•
What is subnet address?
Broadcast address?
Number of host on this network?
Host address range?
7. Your IP address is 212.45.66.115
subnet mask is 255.255.255.128
•
•
•
•
What is subnet address?
Broadcast address?
Number of host on this network?
Host address range?
8.Your IP address is 168.195.98.18
subnet mask is 255.255.254.0
•
What is subnet address?
•
•
•
Broadcast address?
Number of host on this network?
Host address range?
9. Your IP address is 45.122.69.115
subnet mask is 255.255.255.128
•
•
•
•
What is subnet address?
Broadcast address?
Number of host on this network?
Host address range?
10. Your IP address is 117.68.35.23
subnet mask is 255.255.255.224
•
•
What is subnet address?
Broadcast address?
•
•
Number of host on this network?
Host address range?
Purchase answer to see full attachment
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.
Explanation & Answer
Review
Review
Anonymous
Nice! Really impressed with the quality.
Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4
24/7 Homework Help
Stuck on a homework question? Our verified tutors can answer all questions, from basic math to advanced rocket science!
Most Popular Content
NTC 320 University of Phoenix West Consulting Data Center Design Paper
To continue the support of the growth expansion plan and proposal for West Consulting, this week you will develop the data ...
NTC 320 University of Phoenix West Consulting Data Center Design Paper
To continue the support of the growth expansion plan and proposal for West Consulting, this week you will develop the data center design and security plan.Design an enterprise data center solution that expands the campus LAN network, which has reached its capacity.The design must include the following:A logically separated WLAN infrastructure that can be integrated into the existing enterprise networkData flows between segments of the enterprise network - public (outside), DMZ, private, and data center Incorporate feedback you received from your instructor on the diagram from the Week Two Individual Assignment, “West Consulting Modular Design Proposal.” Use this revised diagram, and the information from all previous assignments, as the basis for this diagram.Create a high-level network security policy that identifies key network security measures. Include the following components:List of network assets and their use(s)Potential threats and vulnerabilities in which assets need to be protected from including; open ports, malware, viruses, and specific types of attacksDetailed security methods you will use to protect these assets and how they will be implementedA high-level incident handling process for two of the network attacks you identified, including whom to contact (by role), what should happen to the asset, and how to protect dataDiagram your data center design in Microsoft® Visio®.Document your security policy as either:A 2- to 3- page Microsoft® Word documentA Microsoft® Excel® spreadsheet, properly formatted for easy reading and reference
1 page
We Have Studied Various Decision
We have studied various decision-making problems and solution strategies throughout this course. Select a problem and stra ...
We Have Studied Various Decision
We have studied various decision-making problems and solution strategies throughout this course. Select a problem and strategy and discuss how the use ...
University of Nairobi Clothing Sales Statistical Analysis Problems
A retail clothing store wishes to increase sales while maximizing profits. Your task is to analyze a sample of their sales ...
University of Nairobi Clothing Sales Statistical Analysis Problems
A retail clothing store wishes to increase sales while maximizing profits. Your task is to analyze a sample of their sales data. A link to the Clothing_Store.csv dataset (found in the Module folder or by clicking "Next" at the bottom of this page) is provided along with a link to the variables list. You must determine if any of the variables in the dataset have a strong relationship with the sales amount and if any of the variables could serve as predictor variables for future increased sales. After conducting the descriptive and predictive analysis, you are expected to recommend a course of action based your analysis of the existing dataset. That course of action could range from needing additional data for an adequate level of analysis to concrete steps for increasing sales while maximizing profits.Your deliverables for this assignment include a report containing the following:Business question(s)Hypotheses (alternate and Null)Descriptive statistics test results: charts, graphs, and tables including a discussion of your findingsPredictive statistics test results: charts, graphs, and tables including a discussion of your findingsRecommendations for further actionYour paper should be 4-6 pages in length and conform to the CSU Global Writing Center (Links to an external site.). Include at least two scholarly references in addition to the course textbook. The CSU Global Library (Links to an external site.) is a good place to find these references.
Develop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.
For this assignment, you will develop 3 proposals for your development strategy, which include outsourcing (buy), insourci ...
Develop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.
For this assignment, you will develop 3 proposals for your development strategy, which include outsourcing (buy), insourcing (make), or a combination of both. You will present the pros and cons of each, along with a financial analysis. Finally, you will make a recommendation on which is the best proposal or strategy.Development StrategyDevelop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.Present the pros and cons or benefit analysis for each of the 3 proposals.Perform a financial analysis of the total costs for each proposal that includes ongoing support and maintenance.Recommend 1 of these proposals and your reason for selection of that proposal.Development StrategyA proposal with 3 approaches for development strategy: insource, outsource and a hybrid combination of the two.Present the pros and cons for each approach including a benefits analysis.A cost analysis for each of the 3 proposals.A summary with a recommendation for 1 of these proposals to be adopted for the student’s project.The development strategy document shows an example of the above proposals. attachedThe report should be formatted according to APA guidelines.Grammar, spelling, punctuation, and format should be correct and professional.
BSA 375 Anthem College Fundamentals of Business Systems Development PPT
Imagine this scenario:
After your Wk 1 - Signature Assignment: Apply: SDLC Presentation, Pine Valley Furniture’s board o ...
BSA 375 Anthem College Fundamentals of Business Systems Development PPT
Imagine this scenario:
After your Wk 1 - Signature Assignment: Apply: SDLC Presentation, Pine Valley Furniture’s board of directors wants to continue consideration of a new WebStore for the company. They have asked you to assist them in selecting and initiating which project to do. They are considering a WebStore for 1 of their following 3 target markets:
Corporate furniture
Home office furniture
Student furniture
Choose 1 of the following formats for this assignment:
Presentation (10 to 16 slides)
Executive summary (3 to 4 pages)
Address the following components in your presentation or executive summary :
Explain 4 methods for identifying and selecting IS projects.
Compare the characteristics of each method, and identify the strengths and weaknesses of each method.
Identify valuation criteria when classifying and ranking the 3-target market projects.
Rank the 3-target market projects.
Summarize the project initiation and planning process, and identify the next steps for Pine Valley Furniture’s board of directors.
IT Project Management Discussion and Responses
answer the following questions about IT Project Management. In addition to your course textbook (chapter 11), utiliz ...
IT Project Management Discussion and Responses
answer the following questions about IT Project Management. In addition to your course textbook (chapter 11), utilize the UC library for information and examples.
What is a project, and what are its main attributes? How is a project different from what most people do in their day-to-day jobs? Discuss the importance of top management commitment and the development of standards for successful project management. Provide examples to illustrate the importance of these items based on your experience on any type of project. Discuss the unique challenges that an IT project presents.
In your peer responses, be sure discuss your thoughts on project management, your views on project’s attributes, and your thoughts on successful project management. You can take opposing/differing views than your peers but be sure to provide applicable resources as needed. Properly provide examples in your peer responses as well and any additional challenges you see with IT projects.
POST
cool, can you reply to these 2 posts as its part of the question.. 1) Management of ProjectsA project refers to specific tasks that are completed to produce a unique outcome to achieve the set goals. It has different attributes that ensure that business is well run. A project:Involves working towards achieving goals. A project is done in a specific life cycle which leads to change of different organization, tasks, and resources among others from one level to another this enable them to produce a good and successful project.Based on specific goals and outcomes. Every project is planned to achieve specific objectives as address existing problems for better development.Involves unfamiliarity. This is because projects encounter different activities from each other to tackle the project. Thus, it ensures that the organization is involved with the new technology so as to finish their project.It follows a unique time frame with clear definitions of the project starting date as well as the ending date. This enables the organization to finish a project on a specific set time in order to stimulate and produce a quality project which will meet customer expectation.Projects are so different from what most people do and other jobs uses a different procedure and steps. A project is a series of planned actions with a clear scope, budget, time frame, stakeholders, beneficiaries, goals, and objectives while other jobs are just done mostly without planned activities and no clear time scope. Also, a project has a management team that is tasked to oversee different activities and use available resources to ensure success while most of the normal jobs are individually managed. Lastly, while a project aims to address problems, other jobs aim to achieve personal needs. Top management commitment and development of standards for successful project management is important and beneficial to the project phase. It helps the project managers to have a consistent workflow and design guidelines that help them in the management of human resources. It also ensures the full-time availability of project resources and strategies for proper resource maximization for greater chances of success (Meredith et al., 2017). There are a number of unique challenges that an IT project presents such as poor communication with the team, staying in touch with the remote stakeholders, lack of effective project management practices and rapid technological innovation that needs mid-project adjustments. Fast response to these challenges is key as they hinder the achievements of project goals and lowers sustainability.ReferenceMeredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial approach. John Wiley & Sons.2) Project and its Major AttributesA project is a series of activities that need to be carried out to achieve a specific outcome. Just like other many activities, projects have unique attributes that enable one to easily differentiate it from other activities such as business and farming among others. The major attributes of any project are that projects:Needs a management team to ensure it meets its goals and achieves the specific outcomes. It has a better objective which is always SMART and easily understood by all the stakeholders.Is timeliness as projects have a well-defined time frame. A good project defines both a starting and ending dates the projectHas a well-capitalized budget that covers all the required resources, tools, and finances for efficient implementation.It has steps that guide stakeholders in the project cycle that gives the project direction and value.The difference of Projects to Daily JobsThere are major differences between projects and non-project tasks. Project works involve activities that aim to achieve specific goals such as building structures, building capacities of participants and improving security among others. The project also opposed to other activities, it relies on volunteers and a wide range of stakeholders to achieve its objectives. On the other hand, non-project tasks such as daily people’s activities are an on-going process with no timeframe or the management team. Importance of Top Management Commitment and Project standards Development for Successful ManagementThe success of project management relies on many important factors including the commitments of top-level management as well as the development of project standards. Top managers are useful in project management as they source resources to support the project, defines the project standards and support the project managers through encouraging and mentoring. Project standards are also important as they ensure all tasks meet the quality standards, all stakeholders conduct themselves in acceptable conduct and contribute to the achievement of project goals.Key Challenges Presented by an IT ProjectIn the process of planning, implementing and evaluating Information Technology, many project managers face a number of challenges that limit its sustainability. First, these managers lack instant feedback which is an article by Heagney (2016), threatens the success of project management as it limits fast response to risky events and hinders effective collaboration. Secondly, the managers face the issue of limited skills as most of them lack the essential experiences and expertise to manage projects. Lastly, the managers are exposed to a poor working environment that lacks the essential resources and tools to support productivity. Thus, effective project management fails.ReferenceHeagney, J. (2016). Fundamentals of project management. Amacon.
Similar Content
New England College Learning About Cookies as Spyware Essay
Learning About Cookies as Spyware.Research what kind of information cookies store. You might find the following websites ...
application security.
Introduce and discuss a relevant issue regarding Network Security
...
UMUC OS Security Assessment Report Paper
The operating system (OS) of an information system contains the software that executes the critical functions of the infor...
Prepare briefing package with approval drafts of the three required documents, assignment help
Prepare briefing package with approval drafts of the three required documents. Place all three documents in a single MS ...
Assignment and Discussion
Hello, I need help with 1 tasks?Task 1:Discussion: Choose one of the real-world exercises at the end of the chapter on pa...
Comparing keyloggers, assignment help
regarding to the attachment I would like to inform you that I have already selected the second topic which is comparing ke...
Enterprise Resource Planning
Enterprise resource planning systems are information systems that accounts for various business activities linking externa...
User Interface Design
The usage of software relies on the usability and econometrics of the user interface (UI). The users’ skills, knowledge,...
Reviews On Data Center Management
About the management of medium and large datasets. It would be prudent to explore the avenue of cloud computing. It would ...
Related Tags
Book Guides
The Eyes Were Watching God
by Zora Neale Hurston
The Life-Changing Magic of Tidying Up
by Marie Kondo
The Lord of the Flies
by William Golding
Crime and Punishment
by Fyodor Dostoyevsky
The Dispossessed
by Ursula Kroeber Le Guin
Sula
by Toni Morrison
Twilight
by Stephenie Meyer
The President is Missing
by James Patterson, Bill Clinton
Twelve Years A Slave
by Solomon Northrup
Get 24/7
Homework help
Our tutors provide high quality explanations & answers.
Post question
Most Popular Content
NTC 320 University of Phoenix West Consulting Data Center Design Paper
To continue the support of the growth expansion plan and proposal for West Consulting, this week you will develop the data ...
NTC 320 University of Phoenix West Consulting Data Center Design Paper
To continue the support of the growth expansion plan and proposal for West Consulting, this week you will develop the data center design and security plan.Design an enterprise data center solution that expands the campus LAN network, which has reached its capacity.The design must include the following:A logically separated WLAN infrastructure that can be integrated into the existing enterprise networkData flows between segments of the enterprise network - public (outside), DMZ, private, and data center Incorporate feedback you received from your instructor on the diagram from the Week Two Individual Assignment, “West Consulting Modular Design Proposal.” Use this revised diagram, and the information from all previous assignments, as the basis for this diagram.Create a high-level network security policy that identifies key network security measures. Include the following components:List of network assets and their use(s)Potential threats and vulnerabilities in which assets need to be protected from including; open ports, malware, viruses, and specific types of attacksDetailed security methods you will use to protect these assets and how they will be implementedA high-level incident handling process for two of the network attacks you identified, including whom to contact (by role), what should happen to the asset, and how to protect dataDiagram your data center design in Microsoft® Visio®.Document your security policy as either:A 2- to 3- page Microsoft® Word documentA Microsoft® Excel® spreadsheet, properly formatted for easy reading and reference
1 page
We Have Studied Various Decision
We have studied various decision-making problems and solution strategies throughout this course. Select a problem and stra ...
We Have Studied Various Decision
We have studied various decision-making problems and solution strategies throughout this course. Select a problem and strategy and discuss how the use ...
University of Nairobi Clothing Sales Statistical Analysis Problems
A retail clothing store wishes to increase sales while maximizing profits. Your task is to analyze a sample of their sales ...
University of Nairobi Clothing Sales Statistical Analysis Problems
A retail clothing store wishes to increase sales while maximizing profits. Your task is to analyze a sample of their sales data. A link to the Clothing_Store.csv dataset (found in the Module folder or by clicking "Next" at the bottom of this page) is provided along with a link to the variables list. You must determine if any of the variables in the dataset have a strong relationship with the sales amount and if any of the variables could serve as predictor variables for future increased sales. After conducting the descriptive and predictive analysis, you are expected to recommend a course of action based your analysis of the existing dataset. That course of action could range from needing additional data for an adequate level of analysis to concrete steps for increasing sales while maximizing profits.Your deliverables for this assignment include a report containing the following:Business question(s)Hypotheses (alternate and Null)Descriptive statistics test results: charts, graphs, and tables including a discussion of your findingsPredictive statistics test results: charts, graphs, and tables including a discussion of your findingsRecommendations for further actionYour paper should be 4-6 pages in length and conform to the CSU Global Writing Center (Links to an external site.). Include at least two scholarly references in addition to the course textbook. The CSU Global Library (Links to an external site.) is a good place to find these references.
Develop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.
For this assignment, you will develop 3 proposals for your development strategy, which include outsourcing (buy), insourci ...
Develop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.
For this assignment, you will develop 3 proposals for your development strategy, which include outsourcing (buy), insourcing (make), or a combination of both. You will present the pros and cons of each, along with a financial analysis. Finally, you will make a recommendation on which is the best proposal or strategy.Development StrategyDevelop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two.Present the pros and cons or benefit analysis for each of the 3 proposals.Perform a financial analysis of the total costs for each proposal that includes ongoing support and maintenance.Recommend 1 of these proposals and your reason for selection of that proposal.Development StrategyA proposal with 3 approaches for development strategy: insource, outsource and a hybrid combination of the two.Present the pros and cons for each approach including a benefits analysis.A cost analysis for each of the 3 proposals.A summary with a recommendation for 1 of these proposals to be adopted for the student’s project.The development strategy document shows an example of the above proposals. attachedThe report should be formatted according to APA guidelines.Grammar, spelling, punctuation, and format should be correct and professional.
BSA 375 Anthem College Fundamentals of Business Systems Development PPT
Imagine this scenario:
After your Wk 1 - Signature Assignment: Apply: SDLC Presentation, Pine Valley Furniture’s board o ...
BSA 375 Anthem College Fundamentals of Business Systems Development PPT
Imagine this scenario:
After your Wk 1 - Signature Assignment: Apply: SDLC Presentation, Pine Valley Furniture’s board of directors wants to continue consideration of a new WebStore for the company. They have asked you to assist them in selecting and initiating which project to do. They are considering a WebStore for 1 of their following 3 target markets:
Corporate furniture
Home office furniture
Student furniture
Choose 1 of the following formats for this assignment:
Presentation (10 to 16 slides)
Executive summary (3 to 4 pages)
Address the following components in your presentation or executive summary :
Explain 4 methods for identifying and selecting IS projects.
Compare the characteristics of each method, and identify the strengths and weaknesses of each method.
Identify valuation criteria when classifying and ranking the 3-target market projects.
Rank the 3-target market projects.
Summarize the project initiation and planning process, and identify the next steps for Pine Valley Furniture’s board of directors.
IT Project Management Discussion and Responses
answer the following questions about IT Project Management. In addition to your course textbook (chapter 11), utiliz ...
IT Project Management Discussion and Responses
answer the following questions about IT Project Management. In addition to your course textbook (chapter 11), utilize the UC library for information and examples.
What is a project, and what are its main attributes? How is a project different from what most people do in their day-to-day jobs? Discuss the importance of top management commitment and the development of standards for successful project management. Provide examples to illustrate the importance of these items based on your experience on any type of project. Discuss the unique challenges that an IT project presents.
In your peer responses, be sure discuss your thoughts on project management, your views on project’s attributes, and your thoughts on successful project management. You can take opposing/differing views than your peers but be sure to provide applicable resources as needed. Properly provide examples in your peer responses as well and any additional challenges you see with IT projects.
POST
cool, can you reply to these 2 posts as its part of the question.. 1) Management of ProjectsA project refers to specific tasks that are completed to produce a unique outcome to achieve the set goals. It has different attributes that ensure that business is well run. A project:Involves working towards achieving goals. A project is done in a specific life cycle which leads to change of different organization, tasks, and resources among others from one level to another this enable them to produce a good and successful project.Based on specific goals and outcomes. Every project is planned to achieve specific objectives as address existing problems for better development.Involves unfamiliarity. This is because projects encounter different activities from each other to tackle the project. Thus, it ensures that the organization is involved with the new technology so as to finish their project.It follows a unique time frame with clear definitions of the project starting date as well as the ending date. This enables the organization to finish a project on a specific set time in order to stimulate and produce a quality project which will meet customer expectation.Projects are so different from what most people do and other jobs uses a different procedure and steps. A project is a series of planned actions with a clear scope, budget, time frame, stakeholders, beneficiaries, goals, and objectives while other jobs are just done mostly without planned activities and no clear time scope. Also, a project has a management team that is tasked to oversee different activities and use available resources to ensure success while most of the normal jobs are individually managed. Lastly, while a project aims to address problems, other jobs aim to achieve personal needs. Top management commitment and development of standards for successful project management is important and beneficial to the project phase. It helps the project managers to have a consistent workflow and design guidelines that help them in the management of human resources. It also ensures the full-time availability of project resources and strategies for proper resource maximization for greater chances of success (Meredith et al., 2017). There are a number of unique challenges that an IT project presents such as poor communication with the team, staying in touch with the remote stakeholders, lack of effective project management practices and rapid technological innovation that needs mid-project adjustments. Fast response to these challenges is key as they hinder the achievements of project goals and lowers sustainability.ReferenceMeredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial approach. John Wiley & Sons.2) Project and its Major AttributesA project is a series of activities that need to be carried out to achieve a specific outcome. Just like other many activities, projects have unique attributes that enable one to easily differentiate it from other activities such as business and farming among others. The major attributes of any project are that projects:Needs a management team to ensure it meets its goals and achieves the specific outcomes. It has a better objective which is always SMART and easily understood by all the stakeholders.Is timeliness as projects have a well-defined time frame. A good project defines both a starting and ending dates the projectHas a well-capitalized budget that covers all the required resources, tools, and finances for efficient implementation.It has steps that guide stakeholders in the project cycle that gives the project direction and value.The difference of Projects to Daily JobsThere are major differences between projects and non-project tasks. Project works involve activities that aim to achieve specific goals such as building structures, building capacities of participants and improving security among others. The project also opposed to other activities, it relies on volunteers and a wide range of stakeholders to achieve its objectives. On the other hand, non-project tasks such as daily people’s activities are an on-going process with no timeframe or the management team. Importance of Top Management Commitment and Project standards Development for Successful ManagementThe success of project management relies on many important factors including the commitments of top-level management as well as the development of project standards. Top managers are useful in project management as they source resources to support the project, defines the project standards and support the project managers through encouraging and mentoring. Project standards are also important as they ensure all tasks meet the quality standards, all stakeholders conduct themselves in acceptable conduct and contribute to the achievement of project goals.Key Challenges Presented by an IT ProjectIn the process of planning, implementing and evaluating Information Technology, many project managers face a number of challenges that limit its sustainability. First, these managers lack instant feedback which is an article by Heagney (2016), threatens the success of project management as it limits fast response to risky events and hinders effective collaboration. Secondly, the managers face the issue of limited skills as most of them lack the essential experiences and expertise to manage projects. Lastly, the managers are exposed to a poor working environment that lacks the essential resources and tools to support productivity. Thus, effective project management fails.ReferenceHeagney, J. (2016). Fundamentals of project management. Amacon.