Work Breakdown Structure.edited

Content type
User Generated
Subject
Management
School
University Arizona Global Campus Ashford University
Type
Homework
Rating
Showing Page:
1/4
Running Head: WORK BREAKDOWN STRUCTURE 1
Work Breakdown Structure
Name
Institution
Course
Date

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/4
WORK BREAKDOWN STRUCTURE 2
Construction of a Warehouse Project
There are three main deliverables in the project of constructing a warehouse. The first
deliverable is the laying of the foundations, which will only be possible after the excavation of
the ground, construction of the foundation walls, and then a slab laid on the stones. Once the
foundation is complete, the next deliverable will be the erection of the wall, which will entail
arranging the brick and motor, erecting the windows and doors, and then erecting the roof.
Finality, the landscaping deliverable, will be the last task which will attract activities such as
planting trees and grass, laying cabro blocks on the footpaths, and erecting street lighting and
other decorations. Figure 1 below is a diagrammatic illustration of the WBS that explains the
relationship between these tasks in the construction of a warehouse project.
Laying Foundation
Excavation
Construction of the foundation stones
Laying the Foundation Slab
Erecting Walls
Arranging brick and motor
Fitting Windows and Sliding Doors
Erecting the roof
Landscaping
Planting Grass and trees on the lawns
Laying Cabro blocks on the footpaths
Street lighting and decoration
Work Breakdown Structure

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/4

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 4 pages?
Access Now
Unformatted Attachment Preview
Running Head: WORK BREAKDOWN STRUCTURE Work Breakdown Structure Name Institution Course Date 1 WORK BREAKDOWN STRUCTURE Construction of a Warehouse Project There are three main deliverables in the project of constructing a warehouse. The first deliverable is the laying of the foundations, which will only be possible after the excavation of the ground, construction of the foundation walls, and then a slab laid on the stones. Once the foundation is complete, the next deliverable will be the erection of the wall, which will entail arranging the brick and motor, erecting the windows and doors, and then erecting the roof. Finality, the landscaping deliverable, will be the last task which will attract activities such as planting trees and grass, laying cabro blocks on the footpaths, and erecting street lighting and other decorations. Figure 1 below is a diagrammatic illustration of the WBS that explains the relationship between these tasks in the construction of a warehouse project. Laying Foundation • Excavation • Construction of the foundation stones • Laying the Foundation Slab Erecting Walls • Arranging brick and motor • Fitting Windows and Sliding Doors • ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Really useful study material!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Documents