SCOPE STATEMENT
Instructions: Continuing to use the Week 2 Business Case project, the exercise this week will
require you to complete a scope statement similar to Exhibit 7.4 on page 219 of the textbook.
Copy and paste the Business Case you completed on Week 2 into the section below.
Draft a one or two sentence scope description for this project.
Provide six (6) key deliverables that are required to consider the project to have been completed
successfully. Then state what the Acceptance Criteria entails to consider these Key Deliverables
completed.
The final step will to be to define and identify Exclusions, Constraints and Assumptions. First,
briefly define what these concepts are and then identify these within the scope of your project.
Business Case (copy and paste):
The WSP's resilience project aims at providing a safer environment for citizens of
Virginia Beach by improving life quality. The project's objective is to protect against sea-level
rise, impacts of extreme weather such as damages to property, which might occur due to the
increased precipitation. The ultimate goal is to protect against adverse economic effects by
ensuring stakeholder coordination. The project is working on a standard design for future
stormwater pump stations and tide protection for Virginia Beach. This project proposed three
stormwater pump stations and tide facilities in urban areas and a pump station at a city park.

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/3
SCOPE STATEMENT
Project Scope Statement
Scope Description:
This project will be dealing with the construction and installation of three stormwater
stations and tide and current flumes in Norfolk, Chesapeake, Hampton, and Newport News. The
project will also construct a pump station at the City of Virginia Beach parks.
Key Deliverables with acceptance criteria (product scope):
KEY DELIVERABLES
1.Formulation of a detailed project plan
2.Presentation of essential equipment and
staff to the CDC
3.Identification of funding sources
4.Comprehensive analysis of the scope
for DRM in Virginia
5.Construction of the stormwater stations
6.construction of the tide and current
flume
ACCEPTANCE CRITERIA
1.Agreement with the stakeholders
2. Approvals to be provided by the CDC and any
other relevant bodies concerned with Health and
occupational safety.
3.Getting enough funds to complete the project
4. DRM and other legal institutions to safeguard
the project by designing the copyright laws of the
project from being deployed by the competitors.
5.completion of the stormwater stations that are
properly functioning
6. completion and functionality of the facility
Exclusions
Define:
Project exclusions are termed as the activities that are not within the project confines.
They define those things that are not included in the project.
Identify
Maintenance services and repairs; employees post-project implementation; Energy
supply e.g., fuel for pump stations, electricity, etc.
Constraints
Define:

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/3

Sign up to view the full document!

lock_open Sign Up
Unformatted Attachment Preview
SCOPE STATEMENT Instructions: Continuing to use the Week 2 Business Case project, the exercise this week will require you to complete a scope statement similar to Exhibit 7.4 on page 219 of the textbook. Copy and paste the Business Case you completed on Week 2 into the section below. Draft a one or two sentence scope description for this project. Provide six (6) key deliverables that are required to consider the project to have been completed successfully. Then state what the Acceptance Criteria entails to consider these Key Deliverables completed. The final step will to be to define and identify Exclusions, Constraints and Assumptions. First, briefly define what these concepts are and then identify these within the scope of your project. Business Case (copy and paste): The WSP's resilience project aims at providing a safer environment for citizens of Virginia Beach by improving life qua ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Really helped me to better understand my coursework. Super recommended.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Documents