1. What is the daily capacity of the assembly line designed by the engineers? Assume
that the assembly line has a computer at every position when it is started at the
beginning of the day.
The assembly line would be designed assuming that 6 workers can take 2 minutes to assemble one
notebook. The daily production of 225 units would take a total time of 450 minutes in a day.
Assuming that at the beginning of the day each of the sic workstations has a computer.
Assembly
Line
Position
Tasks
Workstation
Number
Labor
Time
1
Assemble Cover(75)
1
75
2
Install LCD (61)
Prepare base Assembly(24)
2
85
3
Install main Printed circuit Board
(36)
Install CPU (22)
Install Back up Batteries and test
(39)
3
97
4
Install Accupoint Pointing Device
Wrist Rest (32)
Install Speaker and microphone
(44)
4
105

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/7

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 7 pages?
Access Now
Unformatted Attachment Preview
1 Student Name Institution Course Date 2 1. What is the daily capacity of the assembly line designed by the engineers? Assume that the assembly line has a computer at every position when it is started at the beginning of the day. The assembly line would be designed assuming that 6 workers can take 2 minutes to assemble one notebook. The daily production of 225 units would take a total time of 450 minutes in a day. Assuming that at the beginning of the day each of the sic workstations has a computer. Assembly Tasks Workstation Labor Line Number Time Position 1 Assemble Cover(75) 1 75 2 Install LCD (61) 2 85 Install main Printed circuit Board 3 97 Prepare base Assembly(24) 3 (36) Install CPU (22) Install Back up Batteries and test (39) 4 Install Accupoint Pointing Device 4 Wrist Rest (32) Install Speaker and microphone (44) 105 3 Install Auxiliary Printed Circuit Board (29) 5 Prepare and install keyboard (26) 5 120 6 120 Prepare and Install DVD and HDD (52) Install battery pack (7) Insert memory card (5) Start Software load (11) Software Load (19) 6 Software Load 7 Software Load 8 Software Load 9 Test Video Display (60) Test Keyboard (60) 10 Empty 11 Empty 12 Empty 4 2. When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assuming supporter is not included in efficiency calculations. At the start of production, 150 units of Toshiba are produced per day, rising up to 250 units pe ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Excellent! Definitely coming back for more study materials.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4