Alternative Water Supply Case Study 1
Alternative Water Supply Case Study
Name
Course
Instructor's Name
Date

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/4
Alternative Water Supply Case Study 2
Alternative Water Supply Consulting Report
To,
Mr. Jay Andrews,
Project Manager
Major Design Corporation (MDC)
Subject: Consulting Report to analyze the ways for the completion of the Alternative Water
Supply Project in 35 weeks
Sir,
As per your request, I have analyzed the ways to complete the Alternative Water Supply Project
for the city of Saratoga in the required 35 weeks. Below is a brief report of the procedures used
and results obtained along with the attached calculations in an Excel file.
1. Project Network Diagram:
A project network diagram has been made in the Excel file, using immediate predecessors and
normal time information for each activity of the project. It tells us about the hierarchy of all the
project activities from Activity A to Activity J.
It also tells us about the various pathways that can be followed to complete the project using normal
time for each activity. Cumulative time has also been added in each box of the activity to get
knowledge about the total cumulative time of the respective pathway.
2. Project Duration and Cost:
Three pathways were identified from the above-made project network diagram. The pathways as
described in the Excel spreadsheet show that durations of the pathways are 35, 39, and 40 weeks.
Path 3 has the longest duration amongst all the paths and so it has been selected as project duration.
It also concludes that using normal time for each activity the project cannot be complete in the
required 35 weeks. So, the project will have to be rescheduled by using crash time for certain or
all the activities.

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/4

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 4 pages?
Access Now
Unformatted Attachment Preview
Alternative Water Supply – Case Study 1 Alternative Water Supply – Case Study Name Course Instructor's Name Date Alternative Water Supply – Case Study 2 Alternative Water Supply – Consulting Report To, Mr. Jay Andrews, Project Manager Major Design Corporation (MDC) Subject: Consulting Report to analyze the ways for the completion of the Alternative Water Supply Project in 35 weeks Sir, As per your request, I have analyzed the ways to complete the Alternative Water Supply Project for the city of Saratoga in the required 35 weeks. Below is a brief report of the procedures used and results obtained along with the attached calculations in an Excel file. 1. Project Network Diagram: A project network diagram has been made in the Excel file, using immediate predecessors and normal time information for each activity of the project. It tells us about the hierarchy of all the project activities from Activity A to Activity J. It also tells us about the various pathways that can be followed to complete the project using normal time for each activity. Cumulative time has also been added in each box of the activity to get knowledge about the total cumulative time of the respective ...