Access over 35 million homework & study documents

Excel 6e Hires

Content type
User Generated
Subject
Computer Science
Type
Homework
Rating
Showing Page:
1/12
Grader - Instructions Excel 2019 Project
Created On: 09/05/2019 1 GO19_XL_CH06_GRADER_6E_HW - Hires 1.0
Excel_6E_Hires
Steps Performed:
Step 1: Open the file Student_Excel_6E_Hires.xlsx
Step 2: Highlight B4:F10Insert menuSparklines tabline
show the High Point and Last Point, Apply a sparkline style using the first sparkline style in the first row
Step 3: Type Trend in the cell above the sparklines

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/12
Grader - Instructions Excel 2019 Project
Created On: 09/05/2019 2 GO19_XL_CH06_GRADER_6E_HW - Hires 1.0
Step 4: Highlight dataInsertRecommended chartsClustered column
Step 5: Click ChartDesign menu Change Chart TypeColumn on left3D Clustered Column on top

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/12

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 12 pages?
Access Now
Unformatted Attachment Preview
Grader - Instructions Excel 2019 Project Excel_6E_Hires Steps Performed: Step 1: Open the file Student_Excel_6E_Hires.xlsx Step 2: Highlight B4:F10→Insert menu→Sparklines tab→line show the High Point and Last Point, Apply a sparkline style using the first sparkline style in the first row Step 3: Type Trend in the cell above the sparklines Created On: 09/05/2019 1 GO19_XL_CH06_GRADER_6E_HW - Hires 1.0 Grader - Instructions Excel 2019 Project Step 4: Highlight data→Insert→Recommended charts→Clustered column Step 5: Click Chart→Design menu→ Change Chart Type→Column on left→3D Clustered Column on top Created On: 09/05/2019 2 GO19_XL_CH06_GRADER_6E_HW - Hires 1.0 Grader - Instructions Excel 2019 Project Step 6: Apply Chart Style 5 to the chart, and then add a chart title above the chart with the text Job Hires by Location Set the title’s font size to 28 Step 7: Double click chart→On pane→Chart area→ Format the Chart Area with a solid fill—in the first column, click the third color. Format the Plot Area with a solid fill two shades darker—in the first column, click the fifth color Created On: 09/05/2019 3 GO19_XL_CH06_GRADER_6E_HW - Hires 1.0 Grader - Instructions Excel 2019 Project Step 8: Format the floor and the side wall with a solid color—in the next to last column, click the last color. Set the transparency for both at 60%. Add the chart element Axis Title to the vertical axis with the text Number of Attendees Hire ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Really helpful material, saved me a great deal of time.

Studypool
4.7
Indeed
4.5
Sitejabber
4.4

Similar Documents