Access Millions of academic & study documents

Stakeholders And Work Breakdown 1

Content type
User Generated
Subject
Management
School
Kingston University
Type
Homework
Showing Page:
1/10

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/10

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/10

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 10 pages?
Access Now
Unformatted Attachment Preview
Running head: STAKEHOLDERS AND WORK BREAKDOWN Stakeholders and work breakdown Name Tutor Institution Course Date 1 STAKEHOLDERS AND WORK BREAKDOWN 2 Stakeholders and work breakdown How customized eBooks are different from a standard printing process An eBook is simply an online book which can be accessed through computer devices. An eBook can be published and customized. A customized eBook is a book which is printed specifically for a professor or a student. It containscustomized illustrations with personalized message, depending on the needs of a specific person. There is a significant difference between printing of customized eBooks and the other books. Customized eBooks are complex to come up with unlike the standard printed book. Each eBook, since it has to be personalized, has different production steps and contains different contents. EBooks also have different layouts and need different cover designs. Some eBooks are just made up of articles that only need to be reprinted, while others require extensive publishing. Thus, the production process requires extra keenness to avoid any mix up in content in order to produce the desired eBook. On the other hand, a standard printed group does not require complex production process, since the only work needed in to put the content message on physical paper. Customized eBooks need a lot of editing since the outcome must be as the client, for instance, a professor, requested. Thus, extensive understanding of the concept is r ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.
Studypool
4.7
Indeed
4.5
Sitejabber
4.4

Similar Documents