Access over 20 million homework & study documents

Paraphrased

Content type
User Generated
Subject
Management
Type
Homework
Rating
Showing Page:
1/2
Surname: 1
Institution:
Professor:
Date:
Getting returns from integration projects through managers Difficulties with the current approach
Just like it is in most huge organizations where transactions highly depend on the use of IT, the
Qualcomm Company IT materials makes it certain from specialized function applications which
are uniquely built. Even though the organization had come up with basic solutions of dealing
with the problem which was via the use of bringing together sections by interconnecting between
various independent systems and spread sheets, the challenges of these formulas were to start
showing again yet in some years
Answers
The leadership of the company came to know that they can bring down the cost of section to
section integration- management and improvement by acquiring system which could perform all
the operations by itself. They also wanted to offer operating systems which were driven by
offering services as well as required technologies which were in the category of this application.
This brought about the coming up with the use of SOA which is the abbreviation of SERICE
Oriented Architecture together with the TIBICO EAI application. The recent rolling out SOA
was strategized carefully by the leaders. At first, the leaders engaged in quite some period of
time to bring to existence the developed Architecture which shows how the software and the
spreadsheets can be brought together by depicting them as an operation.
Business Returns:
The greatest form of returns is the effectiveness of sharing data. That is, one of the activities in
the SOA bracket is brought to existence for the purpose of ensuring that market personnel can
access the CRM software which is even available through their mobile phone apps and which
gives them a chance to work from home and still be updated through being linked to the system.
The other return reaped from this is for the purpose of bringing together data and for its good
management purposes through the ERP system. This cuts short the time use to add other
operations and characteristics to the gadgets and this brought about increased customer
satisfaction.
Assessment of the projects:
The checks of these projects can be done by the base of the working of this these projects and the
results the system gets. The understanding of its workability is basically from the testing, results
and consumer information systems. This is almost the same to the assessment of the Information

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/2

Sign up to view the full document!

lock_open Sign Up
Unformatted Attachment Preview
Surname: 1 Institution: Professor: Date: Getting returns from integration projects through managers Difficulties with the current approach Just like it is in most huge organizations where transactions highly depend on the use of IT, the Qualcomm Company IT materials makes it certain from specialized function applications which are uniquely built. Even though the organization had come up with basic solutions of dealing with the problem which was via the use of bringing together sections by interconnecting between various independent systems and spread sheets, the challenges of these formulas we ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Just what I needed…Fantastic!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4