Access over 20 million homework & study documents

thinks to do for production_management_system

Content type
User Generated
Type
Study Guide
Rating
Showing Page:
1/1
60 Marks Paper:
4 Questions need to be attempted out of 6: 15 marks each
Question 1-5
A) Short Concept: 5 marks
B) Problem 10 marks
Question 6:
A-E ) Short notes( 3 marks each)
Problem:
1.Line balancing- efficiency, no. of workstations
2.Job sequencing- Priority rule, Johnson rule
3. Inventory turn, cost of inventory, Carrying cost
4.EOQ, ROP, (H=S*CC), Ordering cost Co, Carrying cost CC
5.Crashing cost/pert/CPM network
6. P& C chart, p, c, Sp, Sc, UCL, LCL, Cpk
7.Break-even analysis/productivity.
Do not forget to add conclusion after solving the problem.
Short note:
1.TPM/type of maintenance
2.Break-even point
3.Material handling(MH)
4.Productivity/Productivity measures, 3 types
5.Type of layouts
6. Webber’s theory of location
7.SIC(Systematic Inventory Control)
8.Production system
9.Advantages & disadvantages of PERT
10.Objectives of line balancing
11.Symtoms of poor layout
12.Advantages & disadvantages of product layout, process layout

Sign up to view the full document!

lock_open Sign Up
Unformatted Attachment Preview
60 Marks Paper: 4 Questions need to be attempted out of 6: 15 marks each Question 1-5 A) Short Concept: 5 marks B) Problem 10 marks Question 6: A-E ) Short notes( 3 marks each) Problem: 1.Line balancing- efficiency, no. of workstations 2.Job sequencing- Priority rule, Johnson rule 3. Inventory ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
I was having a hard time with this subject, and this was a great help.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4