Question 1
The minimum time required to complete the project is: 25 days.
Shown below:
Activity A: ES-0, EF-5, LS-0, LF-5, TS-0
Activity B: ES-5, EF-14, LS-5, LF-14, TS-0
Activity C: ES-5, EF-13, LS-6, LF-14, TS-1
Activity D: ES-14, EF-20, LS-16, LF-22, TS-2
Activity E: ES-14, EF-18, LS-14, LF-18, TS-0
Activity F: ES-18, EF-22, LS-18, LF-22, TS-0
Activity G: ES-22, EF-25, LS-22, LF-25, TS-0
A, 5
B,9
D,6
G,3
E,4
C,8
F,4

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/9
You must fill in the following table to support your answers to Questions 2 thru Question 6
(worth 24 points total)
Name
ES
EF
LS
LF
Slack
A
0
5
0
5
0
B
5
16
5
16
0
C
5
14
7
16
2
D
5
14
11
21
7
E
16
23
18
25
2
F
16
21
16
21
0
G
21
25
21
25
0
H
25
31
25
31
0
Slack = LF EF
2. The early start time (ES) for job G is: Day 21
3. The late finish time (LF) for job C is: Day 16
4. The critical path is given by: The path that has activities that have to be finished on time
for the overall project to remain on schedule. They have no slack. Thus:
A → B → F → G → H
5. The minimum time required to complete the project is: 31 Days
6. The slack at activity D is: 7 days

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/9

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 9 pages?
Access Now
Unformatted Attachment Preview
Final Examination Work File Name: (Increase or decrease space as needed) Question 1 The minimum time required to complete the project is: 25 days. Shown below: A, 5 B,9 D,6 C,8 Activity A: ES-0, EF-5, LS-0, LF-5, TS-0 Activity B: ES-5, EF-14, LS-5, LF-14, TS-0 Activity C: ES-5, EF-13, LS-6, LF-14, TS-1 Activity D: ES-14, EF-20, LS-16, LF-22, TS-2 Activity E: ES-14, EF-18, LS-14, LF-18, TS-0 Activity F: ES-18, EF-22, LS-18, LF-22, TS-0 Activity G: ES-22, EF-25, LS-22, LF-25, TS-0 G,3 E,4 F,4 You must fill in the following table to support your answers to Questions 2 thru Question 6 (worth 24 points total) Name ES EF LS LF Slack A 0 5 0 5 0 B 5 16 5 16 0 C 5 14 7 16 2 D 5 14 11 21 7 E 16 23 18 25 2 F 16 21 16 21 0 G 21 25 21 25 0 H 25 31 25 31 0 Slack = LF – EF 2. The early start time (ES) for job G is: Day 21 3. The late finish time (LF) for job C is: Day 16 4. The critical path is given by: The path that has activities that have to be finished on time for the overall project to remain on schedule. They have no slack. Thus: A→B→F→G→H 5. The minimum time required to complete the project is: 31 Days 6. The slack at activity D is: 7 days Question 7 Optimistic Time (to) = 3 days Most Likely Time (tm) = 6 days Pessimistic Time (tp) = 15 days Expected Time = (to + 4tm +tp)/6 (3+4(6) +15)/6 = 7 days Question 8 (7 points) Cost per order = 50 dollars Holding cost per year = 20% Annual Demand = 5000 units ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
Very useful material for studying!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4