Access over 20 million homework & study documents

1 ts1 untuk perencanaan jj

Content type
User Generated
Rating
Showing Page:
1/18

Sign up to view the full document!

lock_open Sign Up
Showing Page:
2/18

Sign up to view the full document!

lock_open Sign Up
Showing Page:
3/18

Sign up to view the full document!

lock_open Sign Up
End of Preview - Want to read all 18 pages?
Access Now
Unformatted Attachment Preview
UNTUK PENGUKURAN JALAN DAN JEMBATAN Bandi Sasmito Apa itu Electronic Total Station ? APA ITU ELECTRONIC TOTAL STATION ? Electronic Distance Meter Digital Theodolite Data Colector Micro Computer BAGIAN ALAT Total Station BAGIAN ETS BAGIAN ETS KELENGKAPAN ETS Tribrach Prism Single Prism Kabel Data Prism pole ETS GEODESI UNDIP GOWIN TKS 202 TOPCON GTS 235 / GTS 105 ETS GEODESI UNDIP SOKKIA SET 630R NIKON NIVO C2 BAGIAN ETS UNIT TAMPILAN UNIT TAMPILAN/INTERFACE TOPCON GTS INTERFACE NIKON Prosedur Pengukuran Topografi untuk Pekerjaan Jalan dan Jembatan : 1. Suvey Pendahuluan 2. Pemasangan Bench Mark (BM) 3. Pengukuran Kerangka Kontrol Vertical (KKV) 4. Pengukuran Kerangka Kontrol Horizontal (KKH) 5. Pengukuran Penampang Memanjang 6. Pengukuran Penampang Melintang 7. Pengukuran Penampang Melintang Sungai 8. Pengukuran Situasi TERIMAKASIH Name: Description: ...
Purchase document to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Anonymous
This is great! Exactly what I wanted.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Documents