Summary
The Maxicana Wire Works is a case study about unification of the output of wire
winding to be produced. Besides, the production process is composed of four d
epartments named extrusion, packaging, drawing and inspection. There is need f
or the enterprise to enhance the capacity level and load with preserving more or
ders amf also need to maximize profit margin for the month of April. (Works, 2
017)
Answer the Questions:
1. The consideration in this report is composed of the customer’s demand decid
ed by the general manager of the company and maximum margin under the forc
es of plant capacity. Maximum profit must be as (34×4) + (30×2) + (60×3) + (25
×4).
("Mexicana Wireworks and Chase Manhattan Case Studies - Term Paper",
2017)
And the result will be as;
W0075c = 1100 untis(i.e.>=150), W0033c = 250 untis, W0005X = 0 untis,
W0007X = 600 untis (i.e.>= 600)
Maximum profit is $ 559900 (Mexicana Wire Works Ch.7 - Mexicana Wire Wo
rks Case Study Summary: According", 2017)
Customer’s demand
Plant Capacity
Orders
Product Name
Hours
No. of orders
W0075c >= 150 units
W0007x >= 600 units
Drawing = 4000
Extrusion = 4200
Winding = 2000
Packaging = 2300
X1 <= 1400x
X2 <= 250x
X3 <= 1510x
X4 <= 1116x
Showing Page:
3/4
From the above table calculation Ron Garcia should suggest the availability of e
xtra number of hours drawing and extrusion department and allow the usage of
package hours completely.
2 : Disuss the need for temporary workers in the drawing deparment
4000 hours are present plant capacity for drawing department. With the of other
forces, of there is increasing in drawing capacity, that will increase cost and mini
mize profit. As of now, there are excessive capacity of about 1800 hours in dra
wing departmemt.
3. Sequence of plant layout
The plant layout described in given situation of this case is not in order accordin
g to overall process. The proficiency of plant can be increased by making the d
epartment closer to each other as;
Drawing dept. Extrusion dept. Winding dept. Inspection dept.
Packaging dept. Finished dept. Storage dept.
Conclusion :
It is analyzed from the case that the enterprise may get new sequence of plant
layout by modifyirg five departments and can get maximum profit in April. It ma
y help in overcoming the all limitatioms. ("Mexican Wire Works Case Study",
2017)
Showing Page:
4/4
References:
1. Mexicana Wireworks and Chase Manhattan Case Studies - Term Paper. (201
7). Termpaperwarehouse.com. Retrieved 8 April 2017, from https://www.termpape
rwarehouse.com/essay-on/Mexicana-Wireworks-And-Chase-Manhattan-Case/18582
7
2. Mexican Wire Works Case Study. (2017). Topics, Sample Papers & Articles O
nline for Free. Retrieved 8 April 2017, from https://studymoose.com/mexican-wire-
works-case-study-essay
3. Works, M. (2017). Mexicana Wire Works Essay - 1800 Words. StudyMode. R
etrieved 8 April 2017, from http://www.studymode.com/essays/Mexicana-Wire-Wor
ks-1071015.html
4. Mexicana Wire Works Ch.7 - Mexicana Wire Works Case Study Summary: Ac
cording. (2017). Coursehero.com. Retrieved 8 April 2017, from https://www.cours
ehero.com/file/12276718/MExicana-Wire-Works-Ch7/

Unformatted Attachment Preview

Case Study of Mexicana Wire Works ( Word count: 318 words Approx.) Summary The Maxicana Wire Works is a case study about unification of the output of wire winding to be produced. Besides, the production process is composed of four d epartments named extrusion, packaging, drawing and inspection. There is need f or the enterprise to enhance the capacity level and load with preserving more or ders amf also need to maximize profit margin for the month of April. (Works, 2 017) Answer the Questions: 1. The consideration in this report is composed of the customer’s demand decid ed by the general manager of the company and maximum margin under the forc es of plant capacity. Maximum profit must be as (34×4) + (30×2) + (60×3) + (25 ×4). ("Mexicana Wireworks and Chase Manhattan Case Studies - Term Paper", 2017) And the result will be as; W0075c = 1100 untis(i.e.>=150), W0033c = 250 untis, W0005X = 0 untis, W0007X = 600 untis (i.e.>= 600) Maximum profit is $ 559900 (Mexicana Wire Works Ch.7 - Mexicana Wire Wo rks Case Study Summary: According", 2017) Customer’s demand Plant Capacity Orders Product Name Hours No. of orders W0075c >= 150 units Drawing = 4000 X1 <= 1400x W0007x >= 600 units Extrusion = 4200 X2 <= 250x Winding = 2000 X3 <= 1510x Packaging = 2300 X4 <= 1116x From the above table calculation Ron Garcia should suggest the availability of e xtra number of hours drawing and extrusion department and allow the usage of package hours completely. 2 : Disuss the need for temporary workers in the drawing deparment 4000 hours are present plant capacity for drawing department. With the of other forces, of there is increasing in drawing capacity, that will increase cost and mini mize profit. As of now, there are excessive capacity of about 1800 hours in dra wing departmemt. 3. Sequence of plant layout The plant layout described in given situation of this case is not in order accordin g to overall process. The proficiency of plant can be increased by making the d epartment closer to each other as; Drawing dept. Packaging dept. Extrusion dept. Winding dept. Finished dept. Storage dept. Inspection dept. Conclusion : It is analyzed from the case that the enterprise may get new sequence of plant layout by modifyirg five departments and can get maximum profit in April. It ma y help in overcoming the all limitatioms. ("Mexican Wire Works Case Study", 2017) References: 1. Mexicana Wireworks and Chase Manhattan Case Studies - Term Paper. (201 7). Termpaperwarehouse.com. Retrieved 8 April 2017, from https://www.termpape rwarehouse.com/essay-on/Mexicana-Wireworks-And-Chase-Manhattan-Case/18582 7 2. Mexican Wire Works Case Study. (2017). Topics, Sample Papers & Articles O nline for Free. Retrieved 8 April 2017, from https://studymoose.com/mexican-wireworks-case-study-essay 3. Works, M. (2017). Mexicana Wire Works Essay - 1800 Words. StudyMode. R etrieved 8 April 2017, from http://www.studymode.com/essays/Mexicana-Wire-Wor ks-1071015.html 4. Mexicana Wire Works Ch.7 - Mexicana Wire Works Case Study Summary: Ac cording. (2017). Coursehero.com. Retrieved 8 April 2017, from https://www.cours ehero.com/file/12276718/MExicana-Wire-Works-Ch7/ Name: Description: ...
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.
Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4