Maurice Micklewhite has decided to replant his garden. Show him what the cost is of
making an erroneous decision at various stages of the project, starting with conceptual
design and ending with the ongoing maintenance of the garden.
Gardens are time consuming and take a serious commitment and takes patience, but the
rewards can be high. For this analysis, I will be making the assumption that Maurice currently
has a small vegetable (cherry tomatoes, carrots) and herb garden (mint, rosemary, thyme). I will
also be assuming that he is expanding his current garden into a bigger space which will mean he
will have to uproot some of the existing plants.
Initial cost
Service cost
Preventative maintenance cost
Operating cost
Disposal cost
Showing Page:
3/3
3
Reference
Wilson, B. (2021, February 23). Report: California HSR cost OVERRUNS ESCALATE. Railway
Age. https://www.railwayage.com/passenger/high-performance/report-california-hsr-cost-
overruns-escalate/.

Unformatted Attachment Preview

1 Activity 3 Swetha Shankar University of the Cumberlands BADM-623-M51- Project Management Processes Dr. Susan Irwin September 13, 2021 2 Activity 3 Maurice Micklewhite has decided to replant his garden. Show him what the cost is of making an erroneous decision at various stages of the project, starting with conceptual design and ending with the ongoing maintenance of the garden. Gardens are time consuming and take a serious commitment and takes patience, but the rewards can be high. For this analysis, I will be making the assumption that Maurice currently has a small vegetable (cherry tomatoes, carrots) and herb garden (mint, rosemary, thyme). I will also be assuming that he is expanding his current garden into a bigger space which will mean he will have to uproot some of the existing plants. Initial cost Service cost Preventative maintenance cost Operating cost Disposal cost 3 Reference Wilson, B. (2021, February 23). Report: California HSR cost OVERRUNS ESCALATE. Railway Age. https://www.railwayage.com/passenger/high-performance/report-california-hsr-costoverruns-escalate/. Name: Description: ...
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.
Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4