Quality Control Tools for IT Project Management

Computer Science
Price: $25 USD

Question description

Prepare a 3- to 5-page paper on using quality control tools.

Think about a current or past IT project that you have been involved in, identify a quality issue, and use one of the quality control tools (fishbone diagram, Pareto diagram, or control chart) to describe the quality issue.

Format your paper consistent with APA guidelines.

Important: Must be at least 3 pages (not including title and reference page) and include a minimum of 2 references. Needs to be done in APA Format Style with a reference page and in-text citations of sources for any quoted or paraphrased material. Additionally, answer will be checked against plagiarism.

Please make sure you read all assignment requirements and understand what is required before bidding. If you are unable to meet these requirements then save yourself the trouble of a potential negative rating by not bidding.

Tutor Answer

(Top Tutor) Daniel C.
School: UT Austin
Studypool has helped 1,244,100 students
Ask your homework questions. Receive quality answers!

Type your question here (or upload an image)

1825 tutors are online

Brown University

1271 Tutors

California Institute of Technology

2131 Tutors

Carnegie Mellon University

982 Tutors

Columbia University

1256 Tutors

Dartmouth University

2113 Tutors

Emory University

2279 Tutors

Harvard University

599 Tutors

Massachusetts Institute of Technology

2319 Tutors

New York University

1645 Tutors

Notre Dam University

1911 Tutors

Oklahoma University

2122 Tutors

Pennsylvania State University

932 Tutors

Princeton University

1211 Tutors

Stanford University

983 Tutors

University of California

1282 Tutors

Oxford University

123 Tutors

Yale University

2325 Tutors