Project Planning, Control and Analysis Coursework Assignment

Sigchi4life
Category:
Engineering
Price: $40 USD

Question description

Project Planning, Control and Analysis Coursework Assignment

School of Engineering

ASSIGNMENT 1 BRIEF                

 

The aim of this assignment is to develop your planning and analytical skills in the context of a complex project orientated environment.

Outline of Task:

You are required to develop a defendable project that will be implemented within a new Life Style Centre (LSC). This project is situated in a village of 12,000 inhabitants. The LSC is situated on an area that was acquired from the Lancashire Council of dimensions 150 metres by 70 metres. LSC involves the following physical spaces:

  • New village library facility/Learning information support

  • Multi-faith centre

  • Gymnasium

  • Crèche/Mums & Toddlers

  • Multipurpose functional spaces

  • Car parking facilities

    Your defendable project will be in any area that can be addressed within the LSC facilities, (e.g. IT, security, building, interior design, social mobility, Alcohol anonymous (AA), Ramblers club, Photographic society project, Historic Lancashire, Silver surfers, and Cafeteria). Your area of focus should be clearly stated at the start of the assignment.

    The submission must include a project schedule of at least 40 activities and clearly identify the logic of activity sequencing and relationships between the activities.  All dependencies, constraints and resources are to be included. This report will contribute to 60% of the final assessment of this module.

    The assignment is as follows:

    Section 1: A detailed project schedule applying procedural logic, and clearly showing dependencies, constraints and resource implications. Provide a list of all assumptions you have made in constructing the schedule. 

    Section 2: Using the schedule developed in section 1, set the Baseline of the project, and increase all activity duration by 10% and cost by 15%. Produce an Earned Value tabulated report that presents values for the following:

  • Budget at completion (BAC)

  • Actual costs (ACWP)

  • Planned Value (BCWS)

  • Earned Value (BCWP)

  • Schedule variance

  • Cost variance

    Section 3: Prepare a report that critically evaluates your solutions in relation to the tools and techniques you have used in constructing the project schedule. Also provide a list of references you have used in your submission. Harvard system of references is the preferred option within the Grenfell-Baines School of Architecture, Construction and Environment. 

     

EXAMPLE



Tutor Answer

(Top Tutor) Daniel C.
(997)
School: UT Austin
PREMIUM TUTOR
Studypool has helped 1,244,100 students
Ask your homework questions. Receive quality answers!

Type your question here (or upload an image)

1823 tutors are online

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors