VoIP Part 1 (Work Breakdown Structure)

Anonymous
timer Asked: May 8th, 2016

Question description

Assignment 3: VoIP Part 1 (Work Breakdown Structure) 

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview
As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1.   Write a one to two (1-2) page summary document in which you:

a.  Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b.  Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2.  Use Microsoft Project to create a WBS which:

a.  Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b.  Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c.  Contains Work Breakdown Structure Code for each task.

d.  Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

  • Identify how project management improves the success of information technology projects.
  • Explain the relationship of the scope of a project to the work breakdown structure.
  • Use technology and information resources to research issues in IT project management.
  • Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Tutor Answer

(Top Tutor) Studypool Tutor
School: Cornell University
Studypool has helped 1,244,100 students
flag Report DMCA
Similar Questions
Hot Questions
Related Tags

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors