engineering assignment help

User Generated

noqhyynu1989

Engineering

Description

all information are clear below in the photos , just follow the photos step by step .

note: the work must be without plagiarism because i will insert in turn it in system .

Unformatted Attachment Preview

TASK1 DESCRIPTIVE TITLE (max marks 10) Introduction to the problem 3 ii Detailed explnation 7 TASK 2 SCOPE,VALUE & FEASIBILITY (max marks 05) i Scope of plan 2.5 ii Importance of the maintenance plan topic 2.5 TASK 3 CRITICAL ANALYSIS ON MAINTENACE PLAN (max marks 30) Design methodology 15 ii Approach adopted 10 iii 5 20 Type of work TASK 4 DATA ANALYSIS OF THE PLAN (max marks 40) i Use of statistical tools Disscuss other relevant data TASK 5 CONCLUSION (max marks 15) i Summary of the plan ii 20 3 ii Future recommendation 4 Student comments 8 Total Marks awarded out of 100 Course Work Description: Planned maintenance has to begin with a plan in mind. Developing preventive maintenance tasks or procedures for plant or facility without a solid plan will result in inconsistent and unreliable procedures. Because it is important to document the development process, build-in consistency, and develop a good understanding of expected results, the Equipment Maintenance Plan is a powerful tool. (Reference: https://www.ice.com/Developing-Equipment-Maintenance-Plans-1113.html). Each student is required to prepare a maintenance plan for a process industry based on minimum 10 working stations while keeping in view the following task: 1. A descriptive title for each maintenance task to be performed 2. A frequency assigned for performing of each task 3. Assignment of a specific craft or workgroup and the number of each craft or workgroup required to perform the task 4. Equipment condition required for performance of the task (i.e. running or shut down) 5. Type of Work – Preventive Maintenance, Predictive Maintenance, Corrective Maintenance etc. 6. Procedure number - Unique identifier for the task, or file name if linked to another document that gives the individual task instructions 7. Estimated time to perform the task 8. Special tools, materials and equipment required to perform the task Task Expected to complete: Task Marks 10 05 Based on the maintenance plan, prepare a brief report, outlining: Task Description No. DESCRIPTIVE TITLE 1. (Introduction to the maintenance plan problem and its detailed explanation) 2 SCOPE, VALUE AND FEASIBILITY (The scope of the plan and its importance to feasibility study) CRITICAL ANALYSIS ON MAINTENACE PLAN 3 (Design methodology and approach according to the estimated time based on equipment condition and type of work) DATA ANALYSIS OF THE PLAN 4. (Application of relevant data, other data interpretations, graphs, activity flow charts, Gantt charts etc.) CONCLUSION 5. (The conclusion based on the plan, future work identification and student recommendation for alternate methods) TOTAL 30 40 15 100 Note: Report must contain maximum 1000 to 1500 words.
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

This question has not been answered.

Create a free account to get help with this and any other question!

Related Tags